Hearth and Home Technologies HUDBAY-FS owner manual Existing Masonry Chimney

Page 20

4. Existing Masonry Chimney

TERMINATION

CAP

TOP ADAPTOR

FLASHING

RETRO CONNECTOR

4 in. (102mm)

 

FLEX LINER

90DEGREE ELBOW

STUDWALL

10 in. x 10 in. (254mm x 254mm)

FRAMED OPENING IN WALL

RETRO CONNECTOR

WALL THIMBLE COVER

FOUR MASONRY BOLTS (NOT INCLUDED)

Figure 5.25

MASONRY CHIMNEY

DIRECT VENT

PIPE

Figure 5.23

CAUTION

Ensure that existing chimney is functionally sound and clean.

Have inspection done by qualified chimney sweep or professional installer BEFORE converting to direct vent appliance.

Step 3.

Secure the flashing to the top of the masonry chimney using a bead of non-hardening sealant-adhesive. If the flashing is larger than the top of the chimney, cut and fold flashing as needed to fit chimney (Figure 5.26).

CUT AND BEND FLASHING AS

NEEDED TO FIT CHIMNEY

Figure 5.26

SEALANT-ADHESIVE

Step 1.

Before cutting any holes, assemble the desired sections of direct vent pipe to determine the center of the masonry penetration.

Step 2.

Once the center point of the penetration has been determined, cut a 6 in. (152mm) diameter hole in the masonry. If the hole is too large, the retro connector might not mount properly; if the hole is too small, the appliance might starve for intake air. If there is a frame wall in front of the masonry wall, cut and frame a 10 in. (254mm) square opening in the wall (centered around the 6 in. (152mm) masonry opening). If there is sheet rock only (no studs) in front of the masonry the 10 in. (254mm) opening is still needed, but does not need to be framed. If the hole is framed a wall thimble is required. This allows the retro connector to mount directly on the masonry and provide the correct clearances to combustibles

(Figure 5.25).

Step 4.

To determine the length of flex needed, measure from 3 in. (76mm) above the top of the flashing down to the level of the opening. Add the distance from the center of the chimney out through the wall. Cut a piece of 4 in. (102mm) flex to this length (extended to its nominal length). Be sure to leave 2-3 in. (51-76mm) of flex above the existing chimney to allow for connection to the termination kit.

Step 5.

Connect the flex liner to the top adapter using three sheet metal screws (Figure 5.21, page 19).

Step 6.

Feed the flex liner through the flashing into the chimney. Carefully feed the flex liner down the chimney to the bottom and out the opening in the masonry wall, forming an angle to line up the flex liner with the vent opening on the appliance.

 

 

 

 

Page 20

Quadra-Fire • Hudson Bay • 7003-121 Rev. i

10/08

Image 20 Contents
Do Discardnot What to do if you smell gasDo not Discard this Manual Welcome to the Quadra-Fire Family Table of Contents 1Listing and Code Approvals Manufacturer Requirements Requirements for the Commonwealth of MassachusettsBELOW. Keep Clear of ALL Obstructions Design & Installation Considerations Tools will apply to every installationGetting Started Inspect Appliance & ComponentsClearances Appliance Location and ClearancesSelecting Appliance Location 4Termination Locations Vent Termination Minimum ClearancesAlcove Applications Vent Information Venting ComponentsUse of Elbows Measuring StandardsHow to Use the Vent Graph Vertical Distance from Appliance to to the 90 ElbowHorizontal Termination StepCenter Hole Line Wallcenter Thimbleline Fold Strap Here Sheet Metal Screw Step Vertical TerminationDirect Vent Pipe Wood Screws Twist-lock the vent cap and seal Cathedral Ceiling Class a Metal Chimney Existing Masonry Chimney Retro Connector Converting to LP Gas Gas InformationFuel Conversions Valve Regulator Replacement Remove pilot hood and set asideGas Pressures PressureGas Connection Check for GAS LeaksRecommendation for Wire Connecting to the ApplianceStanding Pilot Ignition System Wiring Wire Size Max. LengthRED 28 711 MM ValveAppliance Setup AccessoriesDoor Crown Installation Remove Shipping MaterialsGrille Installation Brick Set InstallationPositioning the Logs 13 Log SetMineral Wool Blower Installation 23 Blower Wiring DiagramDamper Adjustment Shutter AdjustmentGlass Replacement Door Frame with Glass Assembly ReplacementControls Operating InstructionsBefore Lighting Appliance For Your Safety Read Before Lighting Lighting ApplianceAfter Appliance is Lit Frequently Asked QuestionsInitial Break-in Procedure Troubleshooting Symptom Possible Cause Corrective ActionBe Placed in this Opening Maintaining and Servicing Your Appliance After servicingMaintenance Tasks Inspect Necessary. USE Caution When CLEANING/HANDLING Ceramic BurnerAppliance Dimension Diagram Reference MaterialsVent Components Diagram SLP Series Vent ComponentsVent Components List MiscellaneousRD. Service Parts List Stocked At DepotDescription Serial # Part Number DepotValve Components Pedestal Components CONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Serial Number Date Purchased Date Installed Dealer Telephone Hudson Bay Direct Vent Gas Appliance