F. Horizontal Termination

90DEGREE ELBOW

PIPE LENGTH

WALL

WALL

HHW2 -

Recommended

 

THIMBLE

 

THIMBLE for optimum

PIPE LENGTH

COVER

 

performance.

Figure 5.3

Step 1.

Determine the desired location of the appliance. Check to ensure that wall studs or roof rafters are not in the way when the venting system is attached. If this is the case, you may want to adjust the location of the appliance.

WARNING

Fire Hazard.

Exhaust Fume Risk.

Impaired Performance of Appliance.

Ensure vent components are locked together correctly.

Pipe may separate if not properly joined.

Step 2.

Direct vent pipe is designed with a locking connection. To connect the venting system to the appliance flue outlet, a twist-lock adapter is built into the appliance at the factory. Remember to include wall thickness in minimum clearances when figuring the measurements for your installation needs.

Note: Direct vent pipe is designed to slide straight onto the male ends of adjacent pipes and fittings by orienting the pipe indentations so they match and slide into the entry slots on the male ends, see Figure 5.4. Push the pipe sections completely together, then twist-lock one section clockwise approximately one-quarter turn, until the two sections are fully locked. The female locking lugs may not be visible from the outside, on the pipe or fittings. They may be located by examining the inside of the female ends.

Female Locking Lugs

Male Locking Lugs

Figure 5.4

WARNING

Fire Risk. Explosion Risk. Combustion Fume Risk.

Use vent run supports per installation instructions. Connect vent sections per installation instructions.

Maintain all clearances to combustibles.

Do NOT allow vent to sag below connection point to appliance.

Maintain specified slope (if required).

Improper support may allow vent to sag or separate.

Step 3.

For installations using a support box/wall thimble (check pipe manufacturer's instructions), mark the wall for a 10 in. x 10 in. (254mm x 254mm) square hole. The center of the square hole should line up with the center line of the horizontal pipe, as shown in Figure 5.5, on the next page. Cut and frame the hole in the exterior wall where the vent will be terminated. If the wall being penetrated is constructed of noncombustible material, i.e. masonry block or concrete, a 7 in. (178mm) diameter hole is acceptable.

 

 

 

 

Page 12

Quadra-Fire • Hudson Bay • 7003-121 Rev. i

10/08

Image 12
Contents What to do if you smell gas Do not Discard this ManualDo Discardnot Welcome to the Quadra-Fire Family Table of Contents 1Listing and Code Approvals Requirements for the Commonwealth of Massachusetts BELOW. Keep Clear of ALL ObstructionsManufacturer Requirements Design & Installation Considerations Tools will apply to every installationGetting Started Inspect Appliance & ComponentsAppliance Location and Clearances Selecting Appliance LocationClearances 4Termination Locations Vent Termination Minimum ClearancesAlcove Applications Vent Information Venting ComponentsUse of Elbows Measuring StandardsHow to Use the Vent Graph Vertical Distance from Appliance to to the 90 ElbowHorizontal Termination StepCenter Hole Line Wallcenter Thimbleline Fold Strap Here Sheet Metal Screw Vertical Termination Direct Vent PipeStep Wood Screws Twist-lock the vent cap and seal Cathedral Ceiling Class a Metal Chimney Existing Masonry Chimney Retro Connector Gas Information Fuel ConversionsConverting to LP Gas Valve Regulator Replacement Remove pilot hood and set asideGas Pressures PressureGas Connection Check for GAS LeaksRecommendation for Wire Connecting to the ApplianceStanding Pilot Ignition System Wiring Wire Size Max. LengthRED 28 711 MM ValveAppliance Setup AccessoriesDoor Crown Installation Remove Shipping MaterialsGrille Installation Brick Set InstallationPositioning the Logs 13 Log SetMineral Wool Blower Installation 23 Blower Wiring DiagramDamper Adjustment Shutter AdjustmentGlass Replacement Door Frame with Glass Assembly ReplacementOperating Instructions Before Lighting ApplianceControls For Your Safety Read Before Lighting Lighting ApplianceFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Troubleshooting Symptom Possible Cause Corrective ActionBe Placed in this Opening Maintaining and Servicing Your Appliance After servicingMaintenance Tasks Inspect Necessary. USE Caution When CLEANING/HANDLING Ceramic BurnerAppliance Dimension Diagram Reference MaterialsVent Components Diagram SLP Series Vent ComponentsVent Components List MiscellaneousRD. Service Parts List Stocked At DepotDepot Valve Components Pedestal ComponentsDescription Serial # Part Number CONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Serial Number Date Purchased Date Installed Dealer Telephone Hudson Bay Direct Vent Gas Appliance