Hearth and Home Technologies HUDBAY-FS Gas Information, Fuel Conversions, Converting to LP Gas

Page 22

6 Gas Information

A. Fuel Conversions

Before making gas connections ensure that the appliance being installed is compatible with the available gas type.

Any natural or propane gas conversions necessary to meet the appliance and locality needs must be made by a quali- fied technician using Hearth & Home Technologies specified and approved parts.

1. Converting to LP Gas

NOTE: Gas conversions should only be performed by a qualified service person, and/or where required by state and local codes, licensed installer/service technician. In the Commonwealth of Massachusetts, installation must be performed by a licensed plumber or gas fitter.

KIT CONTENTS: Replacement orifice; replacement pilot injector; and valve regulator.

TOOLS REQUIRED: Ratchet with 7/16 in. socket and 2 in.

-4 in. extension: power drill (a 90° handle is helpful); #2 Phillips bit; 5/32 in. allen wrench; 5/8 in. open end wrench.

2 nuts holding burner pan

Figure 6.1 Remove right and left twigs and right and left rear logs from the burner pan, if installed. Remove the 2 nuts that secure the burner pan to the burner support with the ratchet and socket.

Figure 6.2 Lift burner up and out of the firebox opening.

3 screws

Figure 6.3 Remove the three screws on the front of the burner support. Set screws aside.

Burner support screws locations

Figure 6.4 Slide the burner support to the left to access the orifice.

 

 

 

 

Page 22

Quadra-Fire • Hudson Bay • 7003-121 Rev. i

10/08

Image 22
Contents Do not Discard this Manual What to do if you smell gasDo Discardnot Welcome to the Quadra-Fire Family Table of Contents 1Listing and Code Approvals BELOW. Keep Clear of ALL Obstructions Requirements for the Commonwealth of MassachusettsManufacturer Requirements Getting Started Design & Installation ConsiderationsTools will apply to every installation Inspect Appliance & ComponentsSelecting Appliance Location Appliance Location and ClearancesClearances 4Termination Locations Vent Termination Minimum ClearancesAlcove Applications Use of Elbows Vent InformationVenting Components Measuring StandardsHow to Use the Vent Graph Vertical Distance from Appliance to to the 90 ElbowHorizontal Termination StepCenter Hole Line Wallcenter Thimbleline Fold Strap Here Sheet Metal Screw Direct Vent Pipe Vertical TerminationStep Wood Screws Twist-lock the vent cap and seal Cathedral Ceiling Class a Metal Chimney Existing Masonry Chimney Retro Connector Fuel Conversions Gas InformationConverting to LP Gas Valve Regulator Replacement Remove pilot hood and set asideGas Pressures PressureGas Connection Check for GAS LeaksStanding Pilot Ignition System Wiring Recommendation for WireConnecting to the Appliance Wire Size Max. LengthRED 28 711 MM ValveDoor Crown Installation Appliance SetupAccessories Remove Shipping MaterialsGrille Installation Brick Set InstallationPositioning the Logs 13 Log SetMineral Wool Blower Installation 23 Blower Wiring DiagramGlass Replacement Damper AdjustmentShutter Adjustment Door Frame with Glass Assembly ReplacementBefore Lighting Appliance Operating InstructionsControls For Your Safety Read Before Lighting Lighting ApplianceInitial Break-in Procedure Frequently Asked QuestionsAfter Appliance is Lit Troubleshooting Symptom Possible Cause Corrective ActionBe Placed in this Opening Maintaining and Servicing Your Appliance After servicingMaintenance Tasks Inspect Necessary. USE Caution When CLEANING/HANDLING Ceramic BurnerAppliance Dimension Diagram Reference MaterialsVent Components Diagram SLP Series Vent ComponentsVent Components List MiscellaneousRD. Service Parts List Stocked At DepotValve Components Pedestal Components DepotDescription Serial # Part Number CONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Serial Number Date Purchased Date Installed Dealer Telephone Hudson Bay Direct Vent Gas Appliance