Hearth and Home Technologies HUDBAY-FS owner manual Twist-lock the vent cap and seal

Page 17

Step 9.

Twist-lock the vent cap and seal.

Note: For multi-story vertical installations, a ceiling firestop is required at the second floor, and any subsequent floors (Figure 5.16). The opening should be framed to 10 in. x 10 in. (254mm x 254mm) inside dimensions, in the same manner as shown in Figure 5.13, on page 16.

NAILS

CEILING FIRESTOP

MIN. 1 in. (25mm)

CLEARANCE

MIN. 1 in. (25mm)

CLEARANCE

MIN. 1 in. (25mm)

CLEARANCE

MIN. 1 in. (25mm)

CLEARANCE

Figure 5.16

WARNING

Fire Risk.

Explosion Risk.

Any occupied areas above the first floor, including closets and storage spaces, which the vertical vent passed through must be enclosed. The enclosure may be framed and sheetrocked with standard construction materials; however, refer to these installation instructions for the minimum allowable clearance between the outside of the vent pipe and the combustible surfaces of the enclosure. Do not fill any of the required air space with insulation.

10/08

Quadra-Fire • Hudson Bay • 7003-121 Rev. i

Page 17

Image 17
Contents Do Discardnot What to do if you smell gasDo not Discard this Manual Welcome to the Quadra-Fire Family Table of Contents 1Listing and Code Approvals Manufacturer Requirements Requirements for the Commonwealth of MassachusettsBELOW. Keep Clear of ALL Obstructions Tools will apply to every installation Design & Installation ConsiderationsGetting Started Inspect Appliance & ComponentsClearances Appliance Location and ClearancesSelecting Appliance Location Vent Termination Minimum Clearances 4Termination LocationsAlcove Applications Venting Components Vent InformationUse of Elbows Measuring StandardsVertical Distance from Appliance to to the 90 Elbow How to Use the Vent GraphStep Horizontal TerminationCenter Hole Line Wallcenter Thimbleline Fold Strap Here Sheet Metal Screw Step Vertical TerminationDirect Vent Pipe Wood Screws Twist-lock the vent cap and seal Cathedral Ceiling Class a Metal Chimney Existing Masonry Chimney Retro Connector Converting to LP Gas Gas InformationFuel Conversions Remove pilot hood and set aside Valve Regulator ReplacementPressure Gas PressuresCheck for GAS Leaks Gas ConnectionConnecting to the Appliance Recommendation for WireStanding Pilot Ignition System Wiring Wire Size Max. LengthValve RED 28 711 MMAccessories Appliance SetupDoor Crown Installation Remove Shipping MaterialsBrick Set Installation Grille Installation13 Log Set Positioning the LogsMineral Wool 23 Blower Wiring Diagram Blower InstallationShutter Adjustment Damper AdjustmentGlass Replacement Door Frame with Glass Assembly ReplacementControls Operating InstructionsBefore Lighting Appliance Lighting Appliance For Your Safety Read Before LightingAfter Appliance is Lit Frequently Asked QuestionsInitial Break-in Procedure Symptom Possible Cause Corrective Action TroubleshootingBe Placed in this Opening After servicing Maintaining and Servicing Your ApplianceNecessary. USE Caution When CLEANING/HANDLING Ceramic Burner Maintenance Tasks InspectReference Materials Appliance Dimension DiagramSLP Series Vent Components Vent Components DiagramMiscellaneous Vent Components ListRD. Service Parts List At Depot StockedDescription Serial # Part Number DepotValve Components Pedestal Components CONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Hudson Bay Direct Vent Gas Appliance Serial Number Date Purchased Date Installed Dealer Telephone