Hearth and Home Technologies HUDBAY-FS Vent Components Diagram, SLP Series Vent Components

Page 42

B. Vent Components Diagram

6-9/16 in.

167 mm

9-7/16 in.

240 mm

6-5/8 in. 168 mm

SLP45

6-1/2 in. 165 mm

6-9/16 in.

 

167 mm

9-1/4 in.

6 in.

235 mm

152 mm

6-5/8 in. 168 mm

9-3/4 in. 248 mm

SLP90

6-5/8 in.

168 mm

6-5/8 in.

168 mm

13-1/4 in. 337 mm

7-1/4 in.

184 mm

6-9/16 in.

167 mm

SLP12A

SLP6A

6-5/8 in.

168 mm

6-5/8 in.

168 mm

25-1/4 in.

641 mm

13-1/4 in.

337 mm

6-9/16 in.

 

 

 

 

 

6-9/16 in.

 

 

 

 

 

167 mm

 

 

 

 

 

 

 

 

 

 

167 mm

 

 

 

 

 

 

6-5/8 in.

168 mm

5-1/4 in.

133 mm

6-9/16 in.

167 mm

SLP4

6-5/8 in.

168 mm

37-1/4 in.

946 mm

6-9/16 in.

167 mm

6-5/8 in.

168 mm

7-1/4 in.

184 mm

SLP6

6-5/8 in.

168 mm

49-1/4 in.

1251 mm

6-9/16 in.

167 mm

SLP12

SLP24

SLP36

SLP48

Note: Pipes overlap 1-3/8 inches (34.93 mm) at each joint.

Figure 12.2 SLP Series Vent Components

 

 

 

 

Page 42

Quadra-Fire • Hudson Bay • 7003-121 Rev. i

10/08

Image 42
Contents What to do if you smell gas Do not Discard this ManualDo Discardnot Welcome to the Quadra-Fire Family Table of Contents 1Listing and Code Approvals Requirements for the Commonwealth of Massachusetts BELOW. Keep Clear of ALL ObstructionsManufacturer Requirements Getting Started Design & Installation ConsiderationsTools will apply to every installation Inspect Appliance & ComponentsAppliance Location and Clearances Selecting Appliance LocationClearances 4Termination Locations Vent Termination Minimum ClearancesAlcove Applications Use of Elbows Vent InformationVenting Components Measuring StandardsHow to Use the Vent Graph Vertical Distance from Appliance to to the 90 ElbowHorizontal Termination StepCenter Hole Line Wallcenter Thimbleline Fold Strap Here Sheet Metal Screw Vertical Termination Direct Vent PipeStep Wood Screws Twist-lock the vent cap and seal Cathedral Ceiling Class a Metal Chimney Existing Masonry Chimney Retro Connector Gas Information Fuel ConversionsConverting to LP Gas Valve Regulator Replacement Remove pilot hood and set asideGas Pressures PressureGas Connection Check for GAS LeaksStanding Pilot Ignition System Wiring Recommendation for WireConnecting to the Appliance Wire Size Max. LengthRED 28 711 MM ValveDoor Crown Installation Appliance SetupAccessories Remove Shipping MaterialsGrille Installation Brick Set InstallationPositioning the Logs 13 Log SetMineral Wool Blower Installation 23 Blower Wiring DiagramGlass Replacement Damper AdjustmentShutter Adjustment Door Frame with Glass Assembly ReplacementOperating Instructions Before Lighting ApplianceControls For Your Safety Read Before Lighting Lighting ApplianceFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Troubleshooting Symptom Possible Cause Corrective ActionBe Placed in this Opening Maintaining and Servicing Your Appliance After servicingMaintenance Tasks Inspect Necessary. USE Caution When CLEANING/HANDLING Ceramic BurnerAppliance Dimension Diagram Reference MaterialsVent Components Diagram SLP Series Vent ComponentsVent Components List MiscellaneousRD. Service Parts List Stocked At DepotDepot Valve Components Pedestal ComponentsDescription Serial # Part Number CONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Serial Number Date Purchased Date Installed Dealer Telephone Hudson Bay Direct Vent Gas Appliance