Hearth and Home Technologies HUDBAY-FS owner manual Blower Installation, Blower Wiring Diagram

Page 32

H. Blower Installation

KIT CONTENTS: Blower; 2 female spade wire connectors.

TOOLS REQUIRED: Powered screwdriver with a #2 Phil- lips head bit.

The blower motor comes standard with two male spade wire connectors. If your appliance has a different con- nection, use the two female spade wire connectors pro- vided to modify the appliance wiring harness.

Figure 8.20 Disconnect power to the appliance. To access the blower, open the door located on the front of the pedes- tal. Remove the two screws holding the blower bracket in place.

Figure 8.21 Disconnect wires to the blower motor. Remove the blower from the bracket.

Figure 8.22 Install the new blower by slipping grommets over studs on the blower bracket. Reinstall the blower and bracket. Connect the wires. Install screws. Restore power to the appliance.

Thermal Disk

 

Fan Speed Control

F

F

 

WHT

WHT

 

 

 

BLK

 

BLK

BLK

F

M

BLK

BLK

F = Female spade connector

M = Male spade connector

F

M

 

 

 

 

BLK

Power Cord (110 VAC)

Ground

 

GRN

 

 

 

 

M

F

WHT

 

Strain Relief Bushing

 

 

 

 

Fan Assembly

Figure 8.23 Blower Wiring Diagram

 

 

 

 

Page 32

Quadra-Fire • Hudson Bay • 7003-121 Rev. i

10/08

Image 32
Contents Do Discardnot What to do if you smell gasDo not Discard this Manual Welcome to the Quadra-Fire Family Table of Contents 1Listing and Code Approvals Manufacturer Requirements Requirements for the Commonwealth of MassachusettsBELOW. Keep Clear of ALL Obstructions Design & Installation Considerations Tools will apply to every installationGetting Started Inspect Appliance & ComponentsClearances Appliance Location and ClearancesSelecting Appliance Location 4Termination Locations Vent Termination Minimum ClearancesAlcove Applications Vent Information Venting ComponentsUse of Elbows Measuring StandardsHow to Use the Vent Graph Vertical Distance from Appliance to to the 90 ElbowHorizontal Termination StepCenter Hole Line Wallcenter Thimbleline Fold Strap Here Sheet Metal Screw Step Vertical TerminationDirect Vent Pipe Wood Screws Twist-lock the vent cap and seal Cathedral Ceiling Class a Metal Chimney Existing Masonry Chimney Retro Connector Converting to LP Gas Gas InformationFuel Conversions Valve Regulator Replacement Remove pilot hood and set asideGas Pressures PressureGas Connection Check for GAS LeaksRecommendation for Wire Connecting to the ApplianceStanding Pilot Ignition System Wiring Wire Size Max. LengthRED 28 711 MM ValveAppliance Setup AccessoriesDoor Crown Installation Remove Shipping MaterialsGrille Installation Brick Set InstallationPositioning the Logs 13 Log SetMineral Wool Blower Installation 23 Blower Wiring DiagramDamper Adjustment Shutter AdjustmentGlass Replacement Door Frame with Glass Assembly ReplacementControls Operating InstructionsBefore Lighting Appliance For Your Safety Read Before Lighting Lighting ApplianceAfter Appliance is Lit Frequently Asked QuestionsInitial Break-in Procedure Troubleshooting Symptom Possible Cause Corrective ActionBe Placed in this Opening Maintaining and Servicing Your Appliance After servicingMaintenance Tasks Inspect Necessary. USE Caution When CLEANING/HANDLING Ceramic BurnerAppliance Dimension Diagram Reference MaterialsVent Components Diagram SLP Series Vent ComponentsVent Components List MiscellaneousRD. Service Parts List Stocked At DepotDescription Serial # Part Number DepotValve Components Pedestal Components CONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Serial Number Date Purchased Date Installed Dealer Telephone Hudson Bay Direct Vent Gas Appliance