I. After Fireplace is Lit

Initial Break-in Procedure

The fireplace should be run three to four hours continuously on high.

Turn the fireplace off and allow it to completely cool.

Remove fixed glass assembly. See Section 14.F.

Clean fixed glass assembly. See Section 3.

Replace the fixed glass assembly and run continuously on high an additional 12 hours.

This cures the materials used to manufacture the fire- place.

NOTICE! Open windows for air circulation during fire- place break-in.

Some people may be sensitive to smoke and odors.

Smoke detectors may activate.

J.Frequently Asked Questions

ISSUE

SOLUTIONS

 

 

Condensation on the glass

This is a result of gas combustion and temperature variations. As the fireplace warms, this

condensation will disappear.

 

 

 

Blue flames

This is a result of normal operation and the flames will begin to yellow as the fireplace is al-

lowed to burn for 20 to 40 minutes.

 

 

 

 

When first operated, this fireplace may release an odor for the first several hours. This is

Odor from fireplace

caused by the curing of materials from manufacturing. Odor may also be released from

finishing materials and adhesives used near the fireplace. These circumstances may require

 

 

additional curing related to the installation environment.

 

 

Film on the glass

This is a normal result of the curing process of the paint and logs. Glass should be cleaned

within 3 to 4 hours of initial burning. A non-abrasive cleaner such as gas fireplace glass

 

 

cleaner may be necessary. See your dealer.

 

 

 

Noise is caused by metal expanding and contracting as it heats up and cools down, similar to

Metallic noise

the sound produced by a furnace or heating duct. This noise does not affect the operation or

 

longevity of the fireplace.

 

 

12

Heat & Glo • ST-550TM-IPI2142-900 Rev. B • 11/08

Image 12
Contents Models What to do if you smell gasCongratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingFinishing Reference MaterialsCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of Massachusetts Gas Fireplace Safety Operating Instructions User Guide Your Fireplace Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesClear Space Decorative Doors and FrontsLighting Instructions IPI Final inspection byFrequently Asked Questions After Fireplace is LitMaintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Remote ControlPorcelain Firebox Panel Cleaning Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection VentingBurner Ignition and Operation IPI Pilot Flame PatternsGetting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesNon-Combustible Mantel Fireplace OpeningTermination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Install Support Brackets To Install the Heat ShieldContinue Adding Vent Components Vent Information and Diagrams Approved PipeVent Table Key Use of ElbowsUse of Flex Vent Vent Diagrams Top Vent Horizontal Termination One ElbowV1 Minimum H1 Maximum Top Vent Horizontal Termination Two Elbows V1 Minimum H1 + H2 MaximumTop Vent Horizontal Termination Three Elbows V1 Minimum H1 + H2 Maximum V1 + V2 MinExhaust restrictor Instructions Two Elbows Three Elbows Minimum Maximum + V 2 MinV1 Minimum Maximum V1 + V2 Min Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Pipe SLPInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Appliance Preparation Securing and Leveling the ApplianceInstalling Vent Pipe Assemble Vent SectionsAssemble Slip Sections Secure the Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall RF4-8 Apply Sealant TOP & Partial SidesInstall Vertical Termination Cap Install Decorative Wall ComponentsHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap 22 Venting through the wallGas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements Intellifire Ignition System WiringOptional Accessories Requirements Electrical Service and RepairIntellifire Ignition Wiring Diagram with Remote Receiver Junction Box Installation Wall Switch Installation for Fan OptionTo install the Splatter Guard FinishingSplatter Guard To Close the Lower Access Panel To Remove the Splatter GuardMantel and Wall Projections Combustible Mantel 15 Non-Combustible ZoneFacing Material Finishing MaterialWithout Front Shown Appliance Setup Install Trim Kits and Surrounds Air Shutter SettingTroubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System Remove any contaminants that may have accumulated on Appliance Dimension Diagram Reference MaterialsVent Components Diagrams Snorkel Black Support Box-Black Wall Thimble-BlackAdapter SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP Service Parts ST-550TM-IPIService Parts List StockedAt Depot Intermittent Pilot Ignition Valve Assembly Contact Information