1. Top Vent - Horizontal Termination - (continued)
Three Elbows
Note: There MUST be a 25% reduction in total H when using flex vent except when using the simple up and out installation (see Figure 7.3).
V1 Minimum | H1 + H2 Maximum | V2 | V1 + V2 Min. | ||
1 ft.** | 305 mm | 1 ft. | 305 mm | * | * |
|
|
|
|
|
|
2 ft.** | 610 mm | 2 ft. | 610 mm | * | * |
|
|
|
|
|
|
3 ft.** | 915 mm | 4 ft. | 1.2 m | * | * |
4 ft. | 1.2 m | 6 ft. | 1.8 m | * | * |
5 ft. | 1.5 m | 14 ft. | 4.3 m | * | * |
|
|
|
|
|
|
H1 + H2 Max. =14 ft. (4.3 m)
V1 + V2 + H1 + H2 Max. = 40 ft. (12.2 m) *No specific restrictions on this value
EXCEPT V1 + V2 + H cannot exceed 40 ft. (12.2 m)
See Warning Below**
Note: A section of vertical pipe (12 inches minimum)
MUST be installed prior to attaching a 90° elbow.
H2
V2
V1
H1
WARNING**
Fire Risk.
•When using
•When using
•When using any other cap, a section of vertical pipe (12 inches minimum) MUST be installed prior to attaching a 90° elbow.
Figure 7.6
28 | Heat & Glo • |