Hearth and Home Technologies ST-550TM-IPI owner manual Vent Diagrams, V1 Minimum H1 Maximum

Page 26

F. Vent Diagrams

General Rules:

A maximum of three 90° elbows (or six 45° elbows) may be used in any vent configuration. Some elbows may be installed horizontally. See Figure 7.6.

Elbows may be placed back to back anywhere in the system as long as the first 90° elbow is a starter elbow.

When penetrating a combustible wall, a wall shield firestop must be installed.

When penetrating a combustible ceiling, a ceiling firestop must be installed.

Horizontal runs of vent do not require vertical rise; horizontal runs may be level.

1.Top Vent - Horizontal Termination One Elbow

WARNING**

Fire Risk.

When using SLP-HRC-SS and SLP-HRC-ZC-SS termination caps on top vented fireplaces, a two foot minimum vertical vent section is required before

installing first elbow.

When using DVP-TB1 termination cap on top vented fireplaces, a three foot minimum vertical vent section is required before installing first elbow.

When using any other cap, a section of vertical pipe (12 inches minimum) MUST be installed prior to attaching a 90° elbow.

V1 Minimum**

H1 Maximum

1 ft.**

 

 

305 mm

2 ft.

610 mm

 

 

 

 

 

 

2 ft.**

 

 

610 mm

3 ft.

914 mm

3 ft.**

 

 

915 mm

5 ft.

1.5 m

4 ft.

 

 

1.2 m

7 ft.

2.1 m

 

 

 

 

 

 

5 ft.

 

 

1.5 m

14 ft.

4.3 m

 

 

 

 

 

 

 

 

 

H Max. =14 ft. (4.3 m)

 

 

V + H Max. = 40 ft. (12.2 m)

 

 

 

** See Warning below.

 

 

 

 

 

 

 

 

Note: There MUST be a 25%

 

 

 

reduction in total H when using

 

 

 

flex vent except when using the

 

 

 

simple up and out installation

 

 

 

(see Figure 7.3).

 

 

 

 

 

 

 

V1

H1

Figure 7.4

26

Heat & Glo • ST-550TM-IPI2142-900 Rev. B • 11/08

Image 26
Contents Models What to do if you smell gasCongratulations Homeowner Reference InformationTable of Contents User GuideFinishing Appliance SetupTroubleshooting Reference MaterialsCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Decorative Doors and FrontsLighting Instructions IPI Final inspection byFrequently Asked Questions After Fireplace is LitGlass Cleaning Maintenance and ServiceMaintenance Tasks-Homeowner Remote ControlGasket Seal and Glass Assembly Inspection Porcelain Firebox Panel CleaningMaintenance Tasks-Qualified Service Technician VentingBurner Ignition and Operation IPI Pilot Flame PatternsGetting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesNon-Combustible Mantel Fireplace OpeningTermination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Continue Adding Vent Components Install Support BracketsTo Install the Heat Shield Vent Table Key Vent Information and DiagramsApproved Pipe Use of ElbowsUse of Flex Vent V1 Minimum H1 Maximum Vent DiagramsTop Vent Horizontal Termination One Elbow Top Vent Horizontal Termination Two Elbows V1 Minimum H1 + H2 MaximumTop Vent Horizontal Termination Three Elbows V1 Minimum H1 + H2 Maximum V1 + V2 MinExhaust restrictor Instructions V1 Minimum Maximum V1 + V2 Min Two Elbows Three ElbowsMinimum Maximum + V 2 Min Wall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstall the Ceiling Firestop Pipe SLPVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Appliance Preparation Securing and Leveling the ApplianceInstalling Vent Pipe Assemble Vent SectionsAssemble Slip Sections Secure the Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall RF4-8 Apply Sealant TOP & Partial SidesHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components Install Horizontal Termination Cap 22 Venting through the wallGas Pressure Gas InformationFuel Conversion Gas ConnectionOptional Accessories Requirements Wiring RequirementsIntellifire Ignition System Wiring Electrical Service and RepairIntellifire Ignition Wiring Diagram with Remote Receiver Junction Box Installation Wall Switch Installation for Fan OptionSplatter Guard To install the Splatter GuardFinishing To Close the Lower Access Panel To Remove the Splatter GuardMantel and Wall Projections Combustible Mantel 15 Non-Combustible ZoneFacing Material Finishing MaterialWithout Front Shown Appliance Setup Install Trim Kits and Surrounds Air Shutter SettingIntellifire Ignition System TroubleshootingSymptom Possible Cause Corrective Action Remove any contaminants that may have accumulated on Appliance Dimension Diagram Reference MaterialsVent Components Diagrams Adapter Snorkel Black Support Box-BlackWall Thimble-Black SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP Service Parts ST-550TM-IPIAt Depot Service Parts ListStocked Intermittent Pilot Ignition Valve Assembly Contact Information