Hearth and Home Technologies ST-550TM-IPI SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP

Page 58

WARNING

Fire Risk.

When using SLP-HRC-SS and SLP-HRC-ZC- SS termination caps on top vented fireplaces, a two feet minimum vertical vent section is

required before installing first elbow.

When using DVP-TB1 termination cap on top vented fireplaces, a three foot minimum vertical ventsectionisrequired before installing first elbow.

15in.

(381 mm)

8-1/8 in.

(206 mm)

13 in.

Effective Length

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(330 mm)

 

 

5-1/2 in.

 

8-3/8 in.

5-3/4 to 8-3/8 in.

 

 

 

 

 

 

 

 

146 to 213 mm

 

 

140 mm

 

213 mm

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

87°

 

 

 

 

 

 

 

 

 

 

SLP-HRC-SS

SLP-HRC-ZC-SS

HORIZONTAL TERMINATION CAP

10-1/2 in.

267 mm

10-7/8 in.

276 mm

DVP-TB1

SLP90 SL-2DVP

ASSEMBLY

DVP-TB1

DVP-TB1

HORIZONTAL TERMINATION CAP

Figure 16.4 SLP Series Vent Components

58

Heat & Glo • ST-550TM-IPI2142-900 Rev. B • 11/08

Image 58
Contents Models What to do if you smell gasCongratulations Homeowner Reference InformationTable of Contents User GuideFinishing Appliance SetupTroubleshooting Reference MaterialsCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsOperating Instructions User Guide Gas Fireplace SafetyYour Fireplace Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Decorative Doors and FrontsLighting Instructions IPI Final inspection byFrequently Asked Questions After Fireplace is LitGlass Cleaning Maintenance and ServiceMaintenance Tasks-Homeowner Remote ControlGasket Seal and Glass Assembly Inspection Porcelain Firebox Panel CleaningMaintenance Tasks-Qualified Service Technician VentingBurner Ignition and Operation IPI Pilot Flame PatternsGetting Started Typical Appliance SystemTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesNon-Combustible Mantel Fireplace OpeningTermination Locations Vent Termination Minimum ClearancesCovered Alcove Applications To Install the Heat Shield Install Support BracketsContinue Adding Vent Components Vent Table Key Vent Information and DiagramsApproved Pipe Use of ElbowsUse of Flex Vent Top Vent Horizontal Termination One Elbow Vent DiagramsV1 Minimum H1 Maximum Top Vent Horizontal Termination Two Elbows V1 Minimum H1 + H2 MaximumTop Vent Horizontal Termination Three Elbows V1 Minimum H1 + H2 Maximum V1 + V2 MinExhaust restrictor Instructions Minimum Maximum + V 2 Min Two Elbows Three ElbowsV1 Minimum Maximum V1 + V2 Min Wall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstall the Ceiling Firestop Pipe SLPFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Appliance Preparation Securing and Leveling the ApplianceInstalling Vent Pipe Assemble Vent SectionsAssemble Slip Sections Secure the Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall RF4-8 Apply Sealant TOP & Partial SidesInstall Decorative Wall Components Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap 22 Venting through the wallGas Pressure Gas InformationFuel Conversion Gas ConnectionOptional Accessories Requirements Wiring RequirementsIntellifire Ignition System Wiring Electrical Service and RepairIntellifire Ignition Wiring Diagram with Remote Receiver Junction Box Installation Wall Switch Installation for Fan OptionFinishing To install the Splatter GuardSplatter Guard To Close the Lower Access Panel To Remove the Splatter GuardMantel and Wall Projections Combustible Mantel 15 Non-Combustible ZoneFacing Material Finishing MaterialWithout Front Shown Appliance Setup Install Trim Kits and Surrounds Air Shutter SettingSymptom Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Remove any contaminants that may have accumulated on Appliance Dimension Diagram Reference MaterialsVent Components Diagrams Wall Thimble-Black Snorkel Black Support Box-BlackAdapter SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP Service Parts ST-550TM-IPIStocked Service Parts ListAt Depot Intermittent Pilot Ignition Valve Assembly Contact Information