Hearth and Home Technologies ST-550TM-IPI owner manual Facing Material, Finishing Material

Page 49

C. Facing Material

Metal front faces may be covered with non-combustible materials only.

Facing and/or finishing materials must not interfere with air flow through louvers, operation of louvers or doors, or access for service.

Facing and/or finishing materials must never overhang into the glass opening.

Observe all clearances when applying combustible materials.

Seal joints between the finished wall and appliance top and sides using a 300 °F minimum sealant. Refer to Figure 13.16.

WARNING! Risk of Fire! DO NOT apply combustible materials beyond the minimum clearances. Comply with all minimum clearances to combustibles as specified in this manual. Overlapping materials could ignite and will interfere with proper operation of doors and louvers.

= COMBUSTIBLE MATERIAL

6 in.

0 in.

 

 

 

 

0 in.

 

 

 

 

 

 

 

 

 

High Temperature Sealant (300° F/149° C min.)

Top and Side Seal Joint

Figure 13.16

D. Finishing Material

Only doors certified for use with this appliance model may be used. Contact your dealer for a list of doors that may be used. Once you have determined what kind of door and finishing material is going to be used on the fireplace, you may use the table below which shows the door mod- els and the finishing material thickness allowed. For an inside fit there is an available template to assist with siz- ing the finishing material.

ST-550TM-IPI

 

 

FINISH MATERIAL

 

DOOR

FIT

MAXIMUM

SEE FIGURE

 

 

THICKNESS

 

Modern

Overlap

0 in. - 1 in. Max.

13.21

 

 

 

Inside

1 in. - 4 in. Max.

13.22

 

 

 

 

 

Heat & Glo • ST-550TM-IPI2142-900 Rev. B • 11/08

49

Image 49
Contents What to do if you smell gas ModelsHomeowner Reference Information CongratulationsUser Guide Table of ContentsTroubleshooting Appliance SetupFinishing Reference MaterialsCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsOperating Instructions User Guide Gas Fireplace SafetyYour Fireplace Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyClear Space Decorative Doors and FrontsFinal inspection by Lighting Instructions IPIAfter Fireplace is Lit Frequently Asked QuestionsMaintenance Tasks-Homeowner Maintenance and ServiceGlass Cleaning Remote ControlMaintenance Tasks-Qualified Service Technician Porcelain Firebox Panel CleaningGasket Seal and Glass Assembly Inspection VentingIPI Pilot Flame Patterns Burner Ignition and OperationTypical Appliance System Getting StartedTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseFireplace Opening Non-Combustible MantelVent Termination Minimum Clearances Termination LocationsCovered Alcove Applications To Install the Heat Shield Install Support BracketsContinue Adding Vent Components Approved Pipe Vent Information and DiagramsVent Table Key Use of ElbowsUse of Flex Vent Top Vent Horizontal Termination One Elbow Vent DiagramsV1 Minimum H1 Maximum V1 Minimum H1 + H2 Maximum Top Vent Horizontal Termination Two ElbowsV1 Minimum H1 + H2 Maximum V1 + V2 Min Top Vent Horizontal Termination Three ElbowsExhaust restrictor Instructions Minimum Maximum + V 2 Min Two Elbows Three ElbowsV1 Minimum Maximum V1 + V2 Min Pipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationPipe SLP Install the Ceiling FirestopFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Securing and Leveling the Appliance Appliance PreparationAssemble Vent Sections Installing Vent PipeSecure the Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Decorative Ceiling ComponentsAssemble and Install Storm Collar Install Metal Roof FlashingApply Sealant TOP & Partial Sides Install RF4-8Install Decorative Wall Components Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination 22 Venting through the wall Install Horizontal Termination CapFuel Conversion Gas InformationGas Pressure Gas ConnectionIntellifire Ignition System Wiring Wiring RequirementsOptional Accessories Requirements Electrical Service and RepairIntellifire Ignition Wiring Diagram with Remote Receiver Wall Switch Installation for Fan Option Junction Box Installation Finishing To install the Splatter Guard Splatter Guard To Remove the Splatter Guard To Close the Lower Access Panel15 Non-Combustible Zone Mantel and Wall Projections Combustible MantelFinishing Material Facing MaterialWithout Front Shown Appliance Setup Air Shutter Setting Install Trim Kits and SurroundsSymptom Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Remove any contaminants that may have accumulated on Reference Materials Appliance Dimension DiagramVent Components Diagrams Wall Thimble-Black Snorkel Black Support Box-BlackAdapter SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP ST-550TM-IPI Service PartsStocked Service Parts ListAt Depot Intermittent Pilot Ignition Valve Assembly Contact Information