D. Disassemble Vent Sections

Rotate either section (see Figure 10.7) so the seams on both pipe sections are aligned as shown in Figure 10.8.

Pull carefully to separate the pieces of pipe.

Figure 10.7 Rotate Seams for Disassembly

Figure 10.8 Align and Disassemble Vent Sections

E. Install Decorative Ceiling Components

A decorative ceiling thimble can be installed on a flat ceil- ing through which the vent passes. The decorative ceiling thimble is used to cover the firestop.

Seal the gap between the vent pipe and firestop using high temperature silicone to prevent cold air infiltration.

Install the decorative ceiling thimble by sliding it up to the ceiling and attaching it using the provided screws.

A decorative cathedral ceiling support box can be installed on a cathedral ceiling through which the vent passes.

Use a plumb-bob to mark the center line of the venting system on the ceiling and drill a small hole through the ceiling and roof at this point. Locate the hole and mark the outline of the cathedral ceiling support box on the outside roof.

Remove shingles or other roof covering as necessary to cut the rectangular hole for the support box. Cut the hole 1/8 in. (3 mm) larger than the support box outline.

Lower the support box through the hole in the roof until its bottom is at least 2 in. (51 mm) below the ceiling (Figure 10.9).

Level the support box both vertically and horizontally and temporarily tack it in place through the inside walls into the roof sheathing.

Use tin snips to cut the support box from the top corners down to the roof line and fold the resulting flaps to the roof. See Figure 10.10.

Nail the flaps to the roof AFTER running a bead of non hardening sealant between the flaps and the roof.

WARNING! Risk of Fire! Clean out ALL materials from inside the support box and complete the vertical vent run and termination.

LEVEL

CATHEDRAL CEILING

SUPPORT BOX

2 in. (51 mm) MIN. BELOW FINISHED CEILING

CUT HOLE 1/8 in. (3 mm)

GREATER IN SIZE THAN

PATTERN OF SUPPORT

BOX AS IT IS PROJECTED

ONTO ROOF LINE

Figure 10.9

Figure 10.10

Heat & Glo • ST-550TM-IPI2142-900 Rev. B • 11/08

37

Image 37
Contents What to do if you smell gas ModelsHomeowner Reference Information CongratulationsUser Guide Table of ContentsTroubleshooting Appliance SetupFinishing Reference MaterialsCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsOperating Instructions User Guide Gas Fireplace SafetyYour Fireplace Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyClear Space Decorative Doors and FrontsFinal inspection by Lighting Instructions IPIAfter Fireplace is Lit Frequently Asked QuestionsMaintenance Tasks-Homeowner Maintenance and ServiceGlass Cleaning Remote ControlMaintenance Tasks-Qualified Service Technician Porcelain Firebox Panel CleaningGasket Seal and Glass Assembly Inspection VentingIPI Pilot Flame Patterns Burner Ignition and OperationTypical Appliance System Getting StartedTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseFireplace Opening Non-Combustible MantelVent Termination Minimum Clearances Termination LocationsCovered Alcove Applications To Install the Heat Shield Install Support BracketsContinue Adding Vent Components Approved Pipe Vent Information and DiagramsVent Table Key Use of ElbowsUse of Flex Vent Top Vent Horizontal Termination One Elbow Vent DiagramsV1 Minimum H1 Maximum V1 Minimum H1 + H2 Maximum Top Vent Horizontal Termination Two ElbowsV1 Minimum H1 + H2 Maximum V1 + V2 Min Top Vent Horizontal Termination Three ElbowsExhaust restrictor Instructions Minimum Maximum + V 2 Min Two Elbows Three ElbowsV1 Minimum Maximum V1 + V2 Min Pipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationPipe SLP Install the Ceiling FirestopFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Securing and Leveling the Appliance Appliance PreparationAssemble Vent Sections Installing Vent PipeSecure the Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Decorative Ceiling ComponentsAssemble and Install Storm Collar Install Metal Roof FlashingApply Sealant TOP & Partial Sides Install RF4-8Install Decorative Wall Components Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination 22 Venting through the wall Install Horizontal Termination CapFuel Conversion Gas InformationGas Pressure Gas ConnectionIntellifire Ignition System Wiring Wiring RequirementsOptional Accessories Requirements Electrical Service and RepairIntellifire Ignition Wiring Diagram with Remote Receiver Wall Switch Installation for Fan Option Junction Box InstallationFinishing To install the Splatter GuardSplatter Guard To Remove the Splatter Guard To Close the Lower Access Panel15 Non-Combustible Zone Mantel and Wall Projections Combustible MantelFinishing Material Facing MaterialWithout Front Shown Appliance Setup Air Shutter Setting Install Trim Kits and SurroundsSymptom Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Remove any contaminants that may have accumulated on Reference Materials Appliance Dimension DiagramVent Components Diagrams Wall Thimble-Black Snorkel Black Support Box-BlackAdapter SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP ST-550TM-IPI Service PartsStocked Service Parts ListAt Depot Intermittent Pilot Ignition Valve Assembly Contact Information