Hearth and Home Technologies 6000GLX-IPILP-S After Fireplace is Lit, Frequently Asked Questions

Page 12

J. After Fireplace is Lit

Initial Break-in Procedure

The fireplace should be run three to four hours continuously on high.

Turn the fireplace off and allow it to completely cool.

Remove fixed glass assembly. See Section 14.H.

Clean fixed glass assembly. See Section 3.

Replace the fixed glass assembly and run continuously on high an additional 12 hours.

This cures the materials used to manufacture the fire- place.

NOTICE! Open windows for air circulation during fire- place break-in.

Some people may be sensitive to smoke and odors.

Smoke detectors may activate.

K.Frequently Asked Questions

ISSUE

SOLUTIONS

 

 

Condensation on the glass

This is a result of gas combustion and temperature variations. As the appliance warms, this

condensation will disappear.

 

Blue flames

This is a result of normal operation and the flames will begin to yellow as the appliance is al-

lowed to burn for 20 to 40 minutes.

 

 

When first operated, this appliance may release an odor for the first several hours. This is caused

Odor from appliance

by the curing of the paint and the burning off of any oils remaining from manufacturing. Odor may

 

also be released from finishing materials and adhesives used around the appliance.

 

This is a normal result of the curing process of the paint and logs. Glass should be cleaned

Film on the glass

within 3 to 4 hours of initial burning to remove deposits left by oils from the manufacturing

 

process. A non-abrasive cleaner such as gas fireplace glass cleaner may be necessary. See

 

your dealer.

 

Noise is caused by metal expanding and contracting as it heats up and cools down, similar to

Metallic noise

the sound produced by a furnace or heating duct. This noise does not affect the operation or

 

longevity of the appliance.

Is it normal to see the pilot flame burn

In an Intellifire ignition system it is normal to see the pilot flame, but it should turn off when

continually?

ON/OFF is turned off.

12

Heat & Glo • 6000GLX-IPI-S/-R, 6000GLX-IPILP-S/-R2101-900 Rev. S • 12/08

Image 12
Contents What to do if you smell gas Hot glass will cause burnsCongratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingFinishing Reference MaterialsCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsGas Fireplace Safety Operating Instructions User GuideYour Fireplace Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit optional Clear SpaceTurn off all electric power to the appliance On position. The ON/OFF switch mayLighting Instructions IPI Final inspection byFrequently Asked Questions After Fireplace is LitMaintenance and Service Maintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionVenting LogsIPI Pilot Flame Patterns Getting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Any such action may cause a fire hazardFraming and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMantel and Wall Projections Combustible MantelsCombustible Mantel Legs or Wall Projections Termination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Vent Information and Diagrams Approved PipeVent Table Key Use of ElbowsVent Diagrams Top Vent Horizontal Termination V1 Minimum H1 MaximumV1 Minimum H1 + H2 Maximum Top Vent Horizontal Termination Three Elbows Min MaxBreak Here Top Vent Vertical Termination Two ElbowsMaximum + V 2 Min Top Vent Vertical Termination Three Elbows H1 + H2 V1 + V2 Minimum H1 + H2 MaximumPage Rear Vent Horizontal Termination Two Elbows H1 Maximum V1 Minimum H1 + H2 MaximumH1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Max Rear Vent Vertical Termination One Elbow H1 + H2 Maximum V1 MinimumRear Vent Vertical Termination Three Elbows V1 Minimum H1 + H2 + H3Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVP SLPInstall Attic Insulation Shield Installing the Optional Heat-Zone-Gas KitFlat Ceiling Installation Vaulted Ceiling InstallationAppliance Preparation Choosing the Top or Rear VentProceed to . C Installing the Non-combustible Board Rear Vent Securing and Leveling the ApplianceInstalling Vent Pipe DVP and SLP Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Install Metal Roof Flashing Assemble and Install Storm CollarInstall RF4-8 SLP-FSInstall Vertical Termination Cap Install Decorative Wall Components SLP onlyHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap DVP and SLP Pipe Ansi Z223.1 and CAN/CGA-B149 installation codesRefer to of this manual Gas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements Intellifire Ignition System WiringOptional Accessories Requirements Electrical InformationElectrical Service and Repair Intellifire Pilot Ignition IPI Wiring DiagramJunction Box Installation Wall Switch Installation for Fan OptionalFinishing Facing MaterialDoors Finish Door FIT Material See Maximum ThicknessAppliance Setup Ember Placement Placement of EmbersLog Assembly LOGS-6000GLX LOGS-6000GLXLP Install the Log Assembly11 Front View 17 Front View Install the Mesh Install Trim and/or SurroundAir Shutter Setting Air Shutter SettingsTroubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System Ues to spark, and main Appliance Dimension Diagram Reference MaterialsLocation Inches Millimeters Vent Components Diagrams DVP vent componentsHorizontal Termination Cap DVP vent components787 mm 13-1/4 367 mm 24-5/8 625 mm 27-1/2 127 mm Roof Flashing Multi-pak 13-3/4 11-7/8 349 mm302 mm 13-3/4 13-7/8 352 mm 349 mmDVP-TVHW DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP 165 mm 165 mm 222 mm 235 mm 152 mm 168 mmElbow 251 mmSnorkel Support Box-Black BlackCathedral Ceiling Vertical Termination CapLog Set Assembly Service PartsService Parts List StockedAt Depot 6000GLX-IPI-R,-S 6000GLX-IPI-R,S Contact Information