Hearth and Home Technologies 6000GLX-IPILP-S, 6000GLX-IPI-R, 6000GLX-IPI-S owner manual Dvp-Tvhw

Page 64

B. Vent Components Diagrams (continued)

 

7-3/8 in.

 

 

 

 

(187 mm)

 

 

 

 

1-1/2 in.

 

 

 

 

(38 mm)

 

 

 

 

14 in.

17-3/4 in.

 

 

 

(451 mm)

 

 

 

(356 mm)

 

 

 

12 in.

 

 

 

 

(305 mm)

 

 

12 in.

 

 

 

 

 

DVP-TB1

 

305 mm

 

 

 

 

BasementVent Cap

 

 

 

 

 

7-1/4 in.

 

 

 

 

(184 mm)

 

12-1/2 in.

 

 

 

 

 

 

 

 

(318 mm)

 

 

5-1/4 in.

 

 

 

 

(133 mm)

 

 

 

 

 

DVP-TVHW

 

 

PVK-80

VerticalTermination Cap (Highwind)

 

 

 

 

(For use with IPI and DSI appliances only.)

 

 

 

 

16-7/8 in.

14 in.

 

7-1/4 in.

 

1 in.

(184 mm)

 

(429 mm)

(356 mm)

(25 mm)

 

12 in.

 

 

14 in.

 

(305 mm)

 

 

 

 

7-1/8 in.

 

(356 mm)

 

12-1/8 in.

 

 

 

(181 mm)

 

 

 

(314 mm)

 

 

 

 

 

8-3/4 in.

 

3/8 in. (10 mm)

 

 

1 in. (25 mm)

 

(222 mm)

 

 

 

 

 

 

 

 

 

7-3/4 to 10-3/8 in.

 

1-5/8 in.

 

 

(197 to 264 mm)

 

 

 

 

 

(41 mm)

 

 

 

 

 

 

 

DVP-FBHT

 

DVP-HPC

 

 

FireBrickTermination Cap

 

High Performance Cap

 

 

 

Figure 16.5 DVP vent components

 

 

 

64

Heat & Glo • 6000GLX-IPI-S/-R, 6000GLX-IPILP-S/-R2101-900 Rev. S • 12/08

Image 64
Contents What to do if you smell gas Hot glass will cause burnsCongratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingFinishing Reference MaterialsCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsOperating Instructions User Guide Gas Fireplace SafetyYour Fireplace Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit optional Clear SpaceTurn off all electric power to the appliance On position. The ON/OFF switch mayLighting Instructions IPI Final inspection byFrequently Asked Questions After Fireplace is LitMaintenance and Service Maintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionVenting LogsIPI Pilot Flame Patterns Getting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Any such action may cause a fire hazardFraming and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesCombustible Mantels Mantel and Wall ProjectionsCombustible Mantel Legs or Wall Projections Termination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Vent Information and Diagrams Approved PipeVent Table Key Use of ElbowsV1 Minimum H1 Maximum Vent Diagrams Top Vent Horizontal TerminationV1 Minimum H1 + H2 Maximum Top Vent Horizontal Termination Three Elbows Min MaxBreak Here Two Elbows Top Vent Vertical TerminationMaximum + V 2 Min Top Vent Vertical Termination Three Elbows H1 + H2 V1 + V2 Minimum H1 + H2 MaximumPage H1 Maximum V1 Minimum H1 + H2 Maximum Rear Vent Horizontal Termination Two ElbowsH1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Max Rear Vent Vertical Termination One Elbow H1 + H2 Maximum V1 MinimumRear Vent Vertical Termination Three Elbows V1 Minimum H1 + H2 + H3Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVP SLPInstall Attic Insulation Shield Installing the Optional Heat-Zone-Gas KitFlat Ceiling Installation Vaulted Ceiling InstallationChoosing the Top or Rear Vent Appliance PreparationProceed to . C Installing the Non-combustible Board Rear Vent Securing and Leveling the ApplianceInstalling Vent Pipe DVP and SLP Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Install Metal Roof Flashing Assemble and Install Storm CollarInstall RF4-8 SLP-FSInstall Decorative Wall Components SLP only Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination Ansi Z223.1 and CAN/CGA-B149 installation codes Install Horizontal Termination Cap DVP and SLP PipeRefer to of this manual Gas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements Intellifire Ignition System WiringOptional Accessories Requirements Electrical InformationElectrical Service and Repair Intellifire Pilot Ignition IPI Wiring DiagramJunction Box Installation Wall Switch Installation for Fan OptionalFinishing Facing MaterialDoors Finish Door FIT Material See Maximum ThicknessAppliance Setup Ember Placement Placement of EmbersLog Assembly LOGS-6000GLX LOGS-6000GLXLP Install the Log Assembly11 Front View 17 Front View Install the Mesh Install Trim and/or SurroundAir Shutter Setting Air Shutter SettingsSymptom Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Ues to spark, and main Reference Materials Appliance Dimension DiagramLocation Inches Millimeters Vent Components Diagrams DVP vent componentsHorizontal Termination Cap DVP vent components787 mm 13-1/4 367 mm 24-5/8 625 mm 27-1/2 127 mm Roof Flashing Multi-pak 13-3/4 11-7/8 349 mm302 mm 13-3/4 13-7/8 352 mm 349 mmDVP-TVHW DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP 165 mm 165 mm 222 mm 235 mm 152 mm 168 mmElbow 251 mmSnorkel Support Box-Black BlackCathedral Ceiling Vertical Termination CapLog Set Assembly Service PartsStocked Service Parts ListAt Depot 6000GLX-IPI-R,-S 6000GLX-IPI-R,S Contact Information