Hearth and Home Technologies 6000GLX-IPILP-S Rear Vent Vertical Termination Three Elbows

Page 32

Rear Vent - Vertical Termination - (continued)

Three Elbows

V2

H2

Figure 7.19

H1 Maximum

V1 Minimum

 

H2

H1 + H2 Maximum

2 ft.

610 mm

6 in.

 

152 mm

2 ft.

 

610

4 ft.

 

1.2 m

 

 

mm

 

 

 

 

 

 

 

 

 

 

 

3 ft.

914 mm

1 ft.

 

305 mm

4 ft.

 

1.2 m

7 ft.

 

2.1 m

5 ft.

1.5 m

2 ft.

 

610 mm

6 ft.

 

1.8 m

11 ft.

 

3.4 m

7 ft.

2.1 m

3 ft.

 

914 mm

8 ft.

 

2.4 m

15 ft.

 

4.6 m

8 ft

2.4 m

4 ft.

 

1.2 m

10 ft.

 

3.1 m

18 ft.

 

5.5 m

 

H1= 8 ft (2.4 m) Max.

V1 + V2 + H1 + H2= 40 ft (12.2 m) Max.

 

 

 

H1 + H2 = 20 ft (6.1 m) Max.

 

 

 

V1

H1

Three Elbows

H1

H2

H3

 

V1 Minimum

H1 + H2 + H3

Maximum

*

*

*

8 ft.

2.4 m

6 ft.

1.8 m

 

 

*

*

*

9 ft.

2.7 m

7 ft.

2.1 m

 

*

*

*

10 ft.

3.1 m

8 ft.

2.4 m

 

*

*

*

10 ft.

3.1 m

8 ft.

2.4 m

 

V1

V1

+ H1 + H2 + H3

= 40 ft. (12.2 m) Maximum

 

*No specific restrictions on this value EXCEPT

 

V1

+ H1 + H2

+ H3

cannot exceed 40 ft. (12.2 m) Maximum

 

 

 

H1

+ H2

+ H3 = 8 ft. (2.4 m) Maximum

 

H3

H1

H2

Figure 7.20

INSTALLED

HORIZONTALLY

32

Heat & Glo • 6000GLX-IPI-S/-R, 6000GLX-IPILP-S/-R2101-900 Rev. S • 12/08

Image 32
Contents What to do if you smell gas Hot glass will cause burnsCongratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingFinishing Reference MaterialsCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit optional Clear SpaceTurn off all electric power to the appliance On position. The ON/OFF switch mayLighting Instructions IPI Final inspection byFrequently Asked Questions After Fireplace is LitMaintenance and Service Maintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionVenting LogsIPI Pilot Flame Patterns Getting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Any such action may cause a fire hazardFraming and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesCombustible Mantel Legs or Wall Projections Mantel and Wall ProjectionsCombustible Mantels Termination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Vent Information and Diagrams Approved PipeVent Table Key Use of ElbowsV1 Minimum H1 + H2 Maximum Vent Diagrams Top Vent Horizontal TerminationV1 Minimum H1 Maximum Top Vent Horizontal Termination Three Elbows Min MaxBreak Here Maximum + V 2 Min Top Vent Vertical TerminationTwo Elbows Top Vent Vertical Termination Three Elbows H1 + H2 V1 + V2 Minimum H1 + H2 MaximumPage H1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Max Rear Vent Horizontal Termination Two ElbowsH1 Maximum V1 Minimum H1 + H2 Maximum Rear Vent Vertical Termination One Elbow H1 + H2 Maximum V1 MinimumRear Vent Vertical Termination Three Elbows V1 Minimum H1 + H2 + H3Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVP SLPInstall Attic Insulation Shield Installing the Optional Heat-Zone-Gas KitFlat Ceiling Installation Vaulted Ceiling InstallationProceed to . C Appliance PreparationChoosing the Top or Rear Vent Installing the Non-combustible Board Rear Vent Securing and Leveling the ApplianceInstalling Vent Pipe DVP and SLP Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Install Metal Roof Flashing Assemble and Install Storm CollarInstall RF4-8 SLP-FSHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components SLP only Refer to of this manual Install Horizontal Termination Cap DVP and SLP PipeAnsi Z223.1 and CAN/CGA-B149 installation codes Gas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements Intellifire Ignition System WiringOptional Accessories Requirements Electrical InformationElectrical Service and Repair Intellifire Pilot Ignition IPI Wiring DiagramJunction Box Installation Wall Switch Installation for Fan OptionalFinishing Facing MaterialDoors Finish Door FIT Material See Maximum ThicknessAppliance Setup Ember Placement Placement of EmbersLog Assembly LOGS-6000GLX LOGS-6000GLXLP Install the Log Assembly11 Front View 17 Front View Install the Mesh Install Trim and/or SurroundAir Shutter Setting Air Shutter SettingsIntellifire Ignition System TroubleshootingSymptom Possible Cause Corrective Action Ues to spark, and main Location Inches Millimeters Appliance Dimension DiagramReference Materials Vent Components Diagrams DVP vent componentsHorizontal Termination Cap DVP vent components787 mm 13-1/4 367 mm 24-5/8 625 mm 27-1/2 127 mm Roof Flashing Multi-pak 13-3/4 11-7/8 349 mm302 mm 13-3/4 13-7/8 352 mm 349 mmDVP-TVHW DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP 165 mm 165 mm 222 mm 235 mm 152 mm 168 mmElbow 251 mmSnorkel Support Box-Black BlackCathedral Ceiling Vertical Termination CapLog Set Assembly Service PartsAt Depot Service Parts ListStocked 6000GLX-IPI-R,-S 6000GLX-IPI-R,S Contact Information