Hearth and Home Technologies 6000GLX-IPI-R, 6000GLX-IPILP-S, 6000GLX-IPI-S Termination Locations

Page 21

6 Termination Locations

A. Vent Termination Minimum Clearances

WARNING

Fire Risk.

Maintain vent clearance to combustibles as specified.

DO NOT pack air space with insulation or other materials.

Failure to keep insulation or other materials away from vent pipe may cause overheating and fire.

 

 

HORIZONTAL

 

 

OVERHANG

2 FT.

20 INCHES MIN.

VERTICAL

MIN.

 

 

WALL

 

LOWEST

 

 

 

DISCHARGE

 

 

OPENING

 

GAS DIRECT VENT

 

 

TERMINATION CAP

 

 

 

 

X

 

 

12

 

 

ROOF PITCH

 

 

IS X/ 12

 

H (MIN.) - MINIMUM HEIGHT FROM ROOF

 

TO LOWEST DISCHARGE OPENING

Roof Pitch

 

H (Min.) Ft.

Flat to 6/12...........................................................1.0*

Over 6/12 to 7/12.................................................1.25*

Over 7/12 to 8/12.................................................1.5*

Over 8/12 to 9/12.................................................2.0*

Over 9/12 to 10/12...............................................2.5

Over 10/12 to 11/12 .............................................3.25

Over 11/12 to 12/12 .............................................4.0

Over 12/12 to 14/12.............................................5.0

Over 14/12 to 16/12.............................................6.0

Over 16/12 to 18/12.............................................7.0

Over 18/12 to 20/12.............................................7.5

Over 20/12 to 21/12.............................................8.0

* 3 foot minimum in snow regions

Figure 6.1 Minimum Height From Roof To Lowest Discharge

Opening

 

 

A

B

6 in. (minimum) up to 20 in.

18 in. minimum

152 mm/508 mm

457 mm

20 in. and over

0 in. minimum

Gas, Wood or Fuel Oil

Termination Cap

B

A*

Gas

Termination

Cap **

*If using decorative cap cover(s), this distance may need to be increased. Refer to the installation instructions supplied with the decorative cap cover.

**In a staggered installation with both gas and wood terminations, the wood termination cap must be higher than the gas termination cap.

Figure 6.2 Staggered Termination Caps

Heat & Glo • 6000GLX-IPI-S/-R, 6000GLX-IPILP-S/-R2101-900 Rev. S • 12/08

21

Image 21
Contents Hot glass will cause burns What to do if you smell gasHomeowner Reference Information CongratulationsUser Guide Table of ContentsTroubleshooting Appliance SetupFinishing Reference MaterialsCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsGas Fireplace Safety Operating Instructions User GuideYour Fireplace Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyFan Kit optional Clear SpaceOn position. The ON/OFF switch may Turn off all electric power to the applianceLighting Instructions IPI Final inspection byAfter Fireplace is Lit Frequently Asked QuestionsMaintenance and Service Gasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianVenting LogsIPI Pilot Flame Patterns Typical Appliance System Getting StartedTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Any such action may cause a fire hazard Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseMantel and Wall Projections Combustible MantelsCombustible Mantel Legs or Wall Projections Vent Termination Minimum Clearances Termination LocationsCovered Alcove Applications Approved Pipe Vent Information and DiagramsVent Table Key Use of ElbowsVent Diagrams Top Vent Horizontal Termination V1 Minimum H1 MaximumV1 Minimum H1 + H2 Maximum Min Max Top Vent Horizontal Termination Three ElbowsBreak Here Top Vent Vertical Termination Two ElbowsMaximum + V 2 Min H1 + H2 V1 + V2 Minimum H1 + H2 Maximum Top Vent Vertical Termination Three ElbowsPage Rear Vent Horizontal Termination Two Elbows H1 Maximum V1 Minimum H1 + H2 MaximumH1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Max H1 + H2 Maximum V1 Minimum Rear Vent Vertical Termination One ElbowV1 Minimum H1 + H2 + H3 Rear Vent Vertical Termination Three ElbowsPipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationPipe DVP SLP Install the Ceiling FirestopInstalling the Optional Heat-Zone-Gas Kit Install Attic Insulation ShieldFlat Ceiling Installation Vaulted Ceiling InstallationAppliance Preparation Choosing the Top or Rear VentProceed to . C Rear Vent Securing and Leveling the Appliance Installing the Non-combustible BoardAttach Vent to the Firebox Assembly Installing Vent Pipe DVP and SLP PipeAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Assemble and Install Storm Collar Install Metal Roof FlashingSLP-FS Install RF4-8Install Vertical Termination Cap Install Decorative Wall Components SLP onlyHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap DVP and SLP Pipe Ansi Z223.1 and CAN/CGA-B149 installation codesRefer to of this manual Fuel Conversion Gas InformationGas Pressure Gas ConnectionIntellifire Ignition System Wiring Wiring RequirementsOptional Accessories Requirements Electrical InformationIntellifire Pilot Ignition IPI Wiring Diagram Electrical Service and RepairWall Switch Installation for Fan Optional Junction Box InstallationFacing Material FinishingFinish Door FIT Material See Maximum Thickness DoorsAppliance Setup Placement of Embers Ember PlacementInstall the Log Assembly Log Assembly LOGS-6000GLX LOGS-6000GLXLP11 Front View 17 Front View Install Trim and/or Surround Install the MeshAir Shutter Setting Air Shutter SettingsTroubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System Ues to spark, and main Appliance Dimension Diagram Reference MaterialsLocation Inches Millimeters DVP vent components Vent Components DiagramsDVP vent components Horizontal Termination CapRoof Flashing Multi-pak 13-3/4 11-7/8 349 mm 787 mm 13-1/4 367 mm 24-5/8 625 mm 27-1/2 127 mm302 mm 13-3/4 13-7/8 352 mm 349 mmDVP-TVHW DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP 165 mm 222 mm 235 mm 152 mm 168 mm 165 mmElbow 251 mmBlack Snorkel Support Box-BlackCathedral Ceiling Vertical Termination CapService Parts Log Set AssemblyService Parts List StockedAt Depot 6000GLX-IPI-R,-S 6000GLX-IPI-R,S Contact Information