STEP 4.

Refer to the details in Figure 14.5 to position Optional Refractory Standoff Bracket.

Note: If fireplace is rear vented and has no elbows in the vent run, adjusting the refractory standoff bracket is allowed. If any elbows are used in the vent run, DO NOT adjust the refractory standoff bracket.

Remove screw shown in Detail A.

Bend down back flap along the two (2) perforations to break back flap from refractory standoff bracket. See Detail B.

Rotate the separated piece and bend the back flap as shown in Detail C to enable the tabs to fit into the two

(2) holes on the left and right of the refractory standoffs indicated in Detail D.

Verify that the back flap rests on top of left and right refractory standoff tabs noted in Detail E.

Refractory

Back Flap

Screw

 

Standoff

 

 

 

Bracket

 

 

 

DETAIL A.

 

 

 

DETAIL B.

 

DETAIL C.

 

Left

Right

Left

Right

DETAIL D.

 

DETAIL E.

 

Figure 14.4

 

 

 

STEP 5.

Hold the top refractory with the brick pattern facing down. Bring the back edge into the firebox slightly higher than the front edge. Bring the back edge all the way to the metal back wall of the fireplace. Raise the front edge up until it clears the side refractory pieces. Drop the back edge down and nest the sides and back into the groove around the edges of the top piece of refractory.

Figure 14.5

F. Ember Placement

WARNING! Risk of Explosion! Follow ember placement instructions in manual. DO NOT place embers directly over burner ports. Replace ember material annually. Improperly placed embers interfere with proper burner operation.

Ember material is shipped with this gas appliance. To place the ember material:

Embers CANNOT be placed directly over ports. Care should be taken not to cover the lighting trail of ports (from back to front).

Place dime-size pieces of Glowing Embers® just in front of the port trail, but not on or in between the ports (see Figure 14.6). Care should be taken so that the ports are not covered. Failure to follow this procedure will likely cause lighting and sooting problems.

EMBER MATERIAL

Figure 14.6 Placement of Embers

Place Mystic Embers on areas of base refractory away from port holes. Use this material to give the appliance a realistic ash bed.

Save the remaining ember materials for use during appliance servicing. The embers provided should be enough for 3 to 5 applications.

Heat & Glo • 6000GLX-IPI-S/-R, 6000GLX-IPILP-S/-R2101-900 Rev. S • 12/08

53

Image 53
Contents Hot glass will cause burns What to do if you smell gasHomeowner Reference Information CongratulationsUser Guide Table of ContentsTroubleshooting Appliance SetupFinishing Reference MaterialsCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyFan Kit optional Clear SpaceOn position. The ON/OFF switch may Turn off all electric power to the applianceLighting Instructions IPI Final inspection byAfter Fireplace is Lit Frequently Asked QuestionsMaintenance and Service Gasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianVenting LogsIPI Pilot Flame Patterns Typical Appliance System Getting StartedTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Any such action may cause a fire hazardSelecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseCombustible Mantel Legs or Wall Projections Mantel and Wall ProjectionsCombustible Mantels Vent Termination Minimum Clearances Termination LocationsCovered Alcove Applications Approved Pipe Vent Information and DiagramsVent Table Key Use of ElbowsV1 Minimum H1 + H2 Maximum Vent Diagrams Top Vent Horizontal TerminationV1 Minimum H1 Maximum Min Max Top Vent Horizontal Termination Three ElbowsBreak Here Maximum + V 2 Min Top Vent Vertical TerminationTwo Elbows H1 + H2 V1 + V2 Minimum H1 + H2 Maximum Top Vent Vertical Termination Three ElbowsPage H1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Max Rear Vent Horizontal Termination Two ElbowsH1 Maximum V1 Minimum H1 + H2 Maximum H1 + H2 Maximum V1 Minimum Rear Vent Vertical Termination One ElbowV1 Minimum H1 + H2 + H3 Rear Vent Vertical Termination Three ElbowsPipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationPipe DVP SLP Install the Ceiling FirestopInstalling the Optional Heat-Zone-Gas Kit Install Attic Insulation ShieldFlat Ceiling Installation Vaulted Ceiling InstallationProceed to . C Appliance PreparationChoosing the Top or Rear Vent Rear Vent Securing and Leveling the Appliance Installing the Non-combustible BoardAttach Vent to the Firebox Assembly Installing Vent Pipe DVP and SLP PipeAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Assemble and Install Storm Collar Install Metal Roof FlashingSLP-FS Install RF4-8Heat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components SLP only Refer to of this manual Install Horizontal Termination Cap DVP and SLP PipeAnsi Z223.1 and CAN/CGA-B149 installation codes Fuel Conversion Gas InformationGas Pressure Gas ConnectionIntellifire Ignition System Wiring Wiring RequirementsOptional Accessories Requirements Electrical InformationIntellifire Pilot Ignition IPI Wiring Diagram Electrical Service and RepairWall Switch Installation for Fan Optional Junction Box InstallationFacing Material FinishingFinish Door FIT Material See Maximum Thickness DoorsAppliance Setup Placement of Embers Ember PlacementInstall the Log Assembly Log Assembly LOGS-6000GLX LOGS-6000GLXLP11 Front View 17 Front View Install Trim and/or Surround Install the MeshAir Shutter Setting Air Shutter SettingsIntellifire Ignition System TroubleshootingSymptom Possible Cause Corrective Action Ues to spark, and main Location Inches Millimeters Appliance Dimension DiagramReference Materials DVP vent components Vent Components DiagramsDVP vent components Horizontal Termination CapRoof Flashing Multi-pak 13-3/4 11-7/8 349 mm 787 mm 13-1/4 367 mm 24-5/8 625 mm 27-1/2 127 mm302 mm 13-3/4 13-7/8 352 mm 349 mmDVP-TVHW DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP 165 mm 222 mm 235 mm 152 mm 168 mm 165 mmElbow 251 mmBlack Snorkel Support Box-BlackCathedral Ceiling Vertical Termination CapService Parts Log Set AssemblyAt Depot Service Parts ListStocked 6000GLX-IPI-R,-S 6000GLX-IPI-R,S Contact Information