Hearth and Home Technologies 6000GLX-IPILP-R 787 mm 13-1/4 367 mm 24-5/8 625 mm 27-1/2 127 mm

Page 63

B. Vent Components Diagrams (continued)

 

 

 

 

31 in.

 

 

 

 

 

(787 mm)

 

13-1/4 in.

 

 

 

 

 

(367 mm)

 

 

24-5/8 in.

 

 

 

 

(625 mm)

 

 

24-5/8 in.

27-1/2 in.

 

 

 

 

(625 mm)

(127 mm)

 

 

 

13-1/4 in.

 

 

 

 

 

 

 

 

 

(367 mm)

RF6M

 

 

 

RF12M

 

Roof Flashing Multi-pak

 

 

 

 

 

 

Roof Flashing Multi-pak

 

 

 

 

 

13-3/4 in.

5 in.

 

 

11-7/8 in.

5 in.

(349 mm)

(127 mm)

 

 

(302 mm)

(127 mm)

13-3/4 in.

 

 

13-7/8 in.

 

 

 

 

(352 mm)

 

 

(349 mm)

 

 

 

 

 

 

 

 

 

BEK

 

 

 

DVP-BEK2

 

Trap Cap Brick Extension

 

 

DVP-HPC Cap Brick Extension

 

 

11-5/8 in.

 

 

 

 

 

(295 mm)

 

 

 

 

7-1/8 in.

 

12-1/8 in.

 

 

 

(308 mm)

 

 

(181 mm)

 

 

 

 

 

 

 

DVP-TRAPFL

 

5-3/4 in.

 

 

 

 

(146 mm)

COOL-ADD

 

Flashing

 

 

 

 

 

 

 

Cap Shield

 

 

 

 

 

26 in.

 

 

13-7/8 in.

9-1/2 in.

 

 

 

(352 mm)

(241 mm)

 

660 mm

 

 

 

 

 

 

 

14 in.

 

 

 

DVP-HSM-B

 

(356 mm)

 

 

 

Extended Heat Shield

 

 

 

 

 

Figure 16.4 DVP vent components

 

 

DRC-RADIUS

 

 

 

Cap Shield

 

 

 

 

 

Heat & Glo • 6000GLX-IPI-S/-R, 6000GLX-IPILP-S/-R2101-900 Rev. S • 12/08

63

Image 63
Contents Hot glass will cause burns What to do if you smell gasHomeowner Reference Information CongratulationsUser Guide Table of ContentsReference Materials Appliance SetupTroubleshooting FinishingCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsGas Fireplace Safety Operating Instructions User GuideYour Fireplace Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Fan Kit optionalFinal inspection by Turn off all electric power to the applianceOn position. The ON/OFF switch may Lighting Instructions IPIAfter Fireplace is Lit Frequently Asked QuestionsMaintenance and Service Logs Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection VentingIPI Pilot Flame Patterns Typical Appliance System Getting StartedAny such action may cause a fire hazard Design and Installation ConsiderationsTools and Supplies Needed Inspect Appliance and ComponentsSelecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseMantel and Wall Projections Combustible MantelsCombustible Mantel Legs or Wall Projections Vent Termination Minimum Clearances Termination LocationsCovered Alcove Applications Use of Elbows Vent Information and DiagramsApproved Pipe Vent Table KeyVent Diagrams Top Vent Horizontal Termination V1 Minimum H1 MaximumV1 Minimum H1 + H2 Maximum Min Max Top Vent Horizontal Termination Three ElbowsBreak Here Top Vent Vertical Termination Two ElbowsMaximum + V 2 Min H1 + H2 V1 + V2 Minimum H1 + H2 Maximum Top Vent Vertical Termination Three ElbowsPage Rear Vent Horizontal Termination Two Elbows H1 Maximum V1 Minimum H1 + H2 MaximumH1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Max H1 + H2 Maximum V1 Minimum Rear Vent Vertical Termination One ElbowV1 Minimum H1 + H2 + H3 Rear Vent Vertical Termination Three ElbowsCombustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe DVP SLP Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldInstalling the Optional Heat-Zone-Gas Kit Flat Ceiling InstallationAppliance Preparation Choosing the Top or Rear VentProceed to . C Rear Vent Securing and Leveling the Appliance Installing the Non-combustible BoardAssemble Pipe Sections Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Vent Sections DVP Pipe OnlyAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Assemble and Install Storm Collar Install Metal Roof FlashingSLP-FS Install RF4-8Install Vertical Termination Cap Install Decorative Wall Components SLP onlyHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap DVP and SLP Pipe Ansi Z223.1 and CAN/CGA-B149 installation codesRefer to of this manual Gas Connection Gas InformationFuel Conversion Gas PressureElectrical Information Wiring RequirementsIntellifire Ignition System Wiring Optional Accessories RequirementsIntellifire Pilot Ignition IPI Wiring Diagram Electrical Service and RepairWall Switch Installation for Fan Optional Junction Box InstallationFacing Material FinishingFinish Door FIT Material See Maximum Thickness DoorsAppliance Setup Placement of Embers Ember PlacementInstall the Log Assembly Log Assembly LOGS-6000GLX LOGS-6000GLXLP11 Front View 17 Front View Air Shutter Settings Install the MeshInstall Trim and/or Surround Air Shutter SettingTroubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System Ues to spark, and main Appliance Dimension Diagram Reference MaterialsLocation Inches Millimeters DVP vent components Vent Components DiagramsDVP vent components Horizontal Termination Cap13-3/4 13-7/8 352 mm 349 mm 787 mm 13-1/4 367 mm 24-5/8 625 mm 27-1/2 127 mmRoof Flashing Multi-pak 13-3/4 11-7/8 349 mm 302 mmDVP-TVHW DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP 251 mm 165 mm165 mm 222 mm 235 mm 152 mm 168 mm ElbowTermination Cap Snorkel Support Box-BlackBlack Cathedral Ceiling VerticalService Parts Log Set AssemblyService Parts List StockedAt Depot 6000GLX-IPI-R,-S 6000GLX-IPI-R,S Contact Information