After installing the Tracker hardware, use the post-installation checklist (Table 4) to verify that all installation procedures were completed.

Table 4. Tracker controller post-installation checklist

Inspect shipment upon receipt

_____

Verify that the shipment is complete.

_____

Inspect the controller and accessories to verify that

 

there has been no shipping damage or loss.

_____

File a damage claim with the carrier, if necessary.

_____

Verify that the controller received is the one that

 

was ordered.

_____

Write down the controller model number for use

 

later.

Verify termination module mounting

_____

Verify that the controller is in a safe indoor

 

environment.

_____

Verify that the location enables appropriate

 

personnel to access the controller.

_____

Verify that the controller is mounted securely with

 

recommended fasteners and screws.

_____

Verify that the installation conforms to controller

 

dimensions, recommended clearances, and

 

viewing angles.

Verify 24 Vac power wiring

_____

Verify that the power wiring complies with

 

applicable codes.

_____

Verify the 24 Vac power connection to the

 

controller termination Block TB1.

_____

Check the power wiring for shorts and improper

 

grounds.

_____

If using conduit connections, make sure separate

 

conduits are used for power and communications.

_____

Inspect the controller printed circuit card for

 

damage.

Verify input and output wiring

_____

Verify that wiring complies with specifications.

_____

Inspect all binary and analog terminations at TB1.

Verify communication wiring

_____

Verify that wiring complies with specifications.

_____

Inspect communication wiring between devices.

_____

Verify that all connections are properly shielded.

Verify wire terminations with a voltmeter

_____ Verify that the tests detailed in Table 18 on page 70

provide acceptable values.

Verify main module installation

_____

Verify that the main module is snapped in tightly

 

against the termination module.

_____

Verify that there is LED5 (HRT) activity.

Verify display module installation

_____

Verify that the display module is snapped in tightly

 

against the main module.

_____

Verify that the touch screen illuminates when

 

touched.

Verify direct and modem communication wiring

_____

Verify that the recommended cable is used for a

 

direct PC connection.

_____

Verify that the recommended adapter is used for

 

the direct connection cable.

_____

Verify that the direct connection cable is connected

 

to the correct Tracker port.

_____

Verify that the phone cable is connected to the

 

correct Tracker port.

Verify Ethernet communication wiring

_____

Verify that the recommended cable is used for the

 

connection.

_____

Verify that the Ethernet connection cable is

 

connected to the correct Tracker port.

BMTK-SVN01D-EN

13

Image 21
Contents Building Automation System Page BMTK-SVN01D-EN February Page BMTK-SVN01D-EN BMTK-SVN01D-EN Contents Appendix B Appendix aTracker controller OverviewOverview Overview Tracker controller components Controller componentsTermination module Termination moduleMain module Main moduleDisplay module Display moduleModel number definition Model numbersTracker controller specifications Tracker Controller specificationsSpecification Description UCM maximum capacities for Tracker models 12 Tracker controller models 12 and 24 UCM capacitiesTracker model UCM type Maximum UCMs UCM maximum capacities for Tracker model Wshp Tracker controller model Wshp UCM capacities105 Verify the shipment Before installationInspect for shipping damage Store unused components until needed Avoid Equipment DamageTracker controller post-installation checklist After installationFCC compliance Verify location conformance to controller specifications Termination module mountingSelect a location for the controller Termination module mounting Minimum clearances Optimal touch screen viewing angles Mount the termination module Termination module conduit access and mounting holesSecuring the termination module to a conduit box Securing the termination module to a wallElectrical conduit installation Installing electrical conduitTermination module mounting Termination board wiring Termination board wiring Wire 24 Vac power Power wiring specificationsVac power Description Wire specifications Terminals Wire optional inputs and outputs Input and output wire specificationsInput and output Description Wire specifications Terminals Wire the priority shutdown device Wire the alarm relayWire the thermistor Wire the utility pulse meterWire specifications Wire the UCMsSupplier Cable type Number Details Catalog Pairs Trane-approved wire suppliersSpecification Value Specifications for Echelon Level 4 compliant cablesFigure Note UCM wiring configurationsWire the UCMs Termination resistor placement for Comm5 links Resistor color band tableTolerance Color sequence Daisy-chain termination resistor placement Tracker Requirements for repeaters on Comm5 communication links Wire supported UCMsConnecting communication link shield wiring to repeater Comm5 daisy-chain repeater connection Termination board wiring Main module mounting Main module mounting Display module mounting Display module mounting Display module engagement Display module mounting Verify PC workstation specifications PC workstation wiringCable and adapter specifications for direct connection Direct connection to PC workstationPC workstation wiring Tracker direct connection to a PC workstation Modem connection to PC workstation Tracker modem connection to a PC workstation Ethernet connection to PC workstation Connecting over an existing LANTracker Controller PC Workstation Connecting through a hubConnecting with one cable Troubleshooting components TroubleshootingService pin buttons and jumper LEDsTroubleshooting Tracker main logic board LEDs Alarm LEDLED name Color Description NumberService pin buttons/jumper Function Main logic board service pin buttons and jumperSymptom/action troubleshooting Symptom/action troubleshootingSymptom Action Present of the proper severity to actuate the alarm output Symptom/action troubleshooting Troubleshooting Maintenance Cleaning the touch screenCalibrating the touch screen Maintenance Required supplies checklist Installation checklistsOptional supplies checklist Required suppliesComm5 UCM identification and location Comm5 UCM identification and locationSpace Comfort Controllers 24 maximum Space Comfort Controllers Modules 4 maximum VariTrac central control panels 10 maximumPre-installation wiring notes Termination module post-installation checklist Termination module post-installation checklistCircuit Mandatory Test Actual value Wiring Temperature ºF Temperature ºC Sensor resistance Ohms x Thermistor sensor electrical characteristicsAppendix a Installation checklists Declaration of Conformity Product Number BMTK000AA0A110 When and where issuedElectromagnetic Emission Mark of Compliance European ContactNumerics IndexIndex Index Index Page Trane