After installation
After installation
After installing the Tracker hardware, use the
Table 4. Tracker controller post-installation checklist
Inspect shipment upon receipt
_____ | Verify that the shipment is complete. |
_____ | Inspect the controller and accessories to verify that |
| there has been no shipping damage or loss. |
_____ | File a damage claim with the carrier, if necessary. |
_____ | Verify that the controller received is the one that |
| was ordered. |
_____ | Write down the controller model number for use |
| later. |
Verify termination module mounting
_____ | Verify that the controller is in a safe indoor |
| environment. |
_____ | Verify that the location enables appropriate |
| personnel to access the controller. |
_____ | Verify that the controller is mounted securely with |
| recommended fasteners and screws. |
_____ | Verify that the installation conforms to controller |
| dimensions, recommended clearances, and |
| viewing angles. |
Verify 24 Vac power wiring
_____ | Verify that the power wiring complies with |
| applicable codes. |
_____ | Verify the 24 Vac power connection to the |
| controller termination Block TB1. |
_____ | Check the power wiring for shorts and improper |
| grounds. |
_____ | If using conduit connections, make sure separate |
| conduits are used for power and communications. |
_____ | Inspect the controller printed circuit card for |
| damage. |
Verify input and output wiring
_____ | Verify that wiring complies with specifications. |
_____ | Inspect all binary and analog terminations at TB1. |
Verify communication wiring
_____ | Verify that wiring complies with specifications. |
_____ | Inspect communication wiring between devices. |
_____ | Verify that all connections are properly shielded. |
Verify wire terminations with a voltmeter
_____ Verify that the tests detailed in Table 18 on page 70
provide acceptable values.
Verify main module installation
_____ | Verify that the main module is snapped in tightly |
| against the termination module. |
_____ | Verify that there is LED5 (HRT) activity. |
Verify display module installation
_____ | Verify that the display module is snapped in tightly |
| against the main module. |
_____ | Verify that the touch screen illuminates when |
| touched. |
Verify direct and modem communication wiring
_____ | Verify that the recommended cable is used for a |
| direct PC connection. |
_____ | Verify that the recommended adapter is used for |
| the direct connection cable. |
_____ | Verify that the direct connection cable is connected |
| to the correct Tracker port. |
_____ | Verify that the phone cable is connected to the |
| correct Tracker port. |
Verify Ethernet communication wiring
_____ | Verify that the recommended cable is used for the |
| connection. |
_____ | Verify that the Ethernet connection cable is |
| connected to the correct Tracker port. |
| 13 |