Appendix A Installation checklists
Termination module post-installation checklist
Use Table 18 to verify that the circuits connected to the termination board on the termination module are wired correctly. Record test results in the “Actual value” column.
Table 18. Termination module post-installation checklist
Circuit | Mandatory | Test | Actual value | |
wiring | ||||
|
|
| ||
|
|
|
| |
24 Vac |
| Measure the voltage between |
| |
| nominal (19 Vac to 30 Vac). |
| ||
9 | Measure the voltage between |
| ||
mately the same voltage as measured between |
| |||
|
| The ground wire must be connected to terminal |
| |
|
| tied to building or earth ground at nearest location. Measure the |
| |
|
| voltage between |
| |
|
|
|
| |
Alarm relay |
| Measure the voltage between |
| |
| 24 Vac. Jumper these two terminals. The |
| ||
| now be energized and active. |
| ||
|
|
|
| |
Priority |
| There must be no voltage applied to these terminals. These termi- |
| |
shutdown |
| nals must be connected to dry contacts only. Measure the resis- |
| |
| tance between |
| ||
| the |
| ||
|
| with the contacts in the open position. |
| |
|
|
|
| |
Meter input |
| There must be no voltage applied to these terminals. The terminals |
| |
| must be connected to dry contacts only. Measure the resistance |
| ||
| between |
| ||
|
| demand meter contacts in the closed position, and infinity ohms |
| |
|
| with the contacts in the open position. |
| |
|
|
|
| |
Thermistor |
| There must be no voltage applied to these terminals. The cable |
| |
| shield must be connected to terminal |
| ||
| tance between |
| ||
| Note the approximate temperature at the location of the outdoor |
| ||
|
| air temperature sensor. |
| |
|
|
|
| |
|
| Compare the resistance and temperature values to the listed val- |
| |
|
| ues in Table 19 on page 71. |
| |
|
|
|
| |
Comm |
| There must be no voltage applied to these terminals. Measure the |
| |
9 | resistance between |
| ||
approximately 50 Ω with |
| |||
| the correct usage of the termination resistors as well as the conti- |
| ||
|
| nuity of the wire. |
| |
|
|
|
|
70 |
|