State Industries SUF-130- 300/400/500 Multiple Concentric Termination Arrangements

Page 31

Multiple Concentric Termination Arrangements

The illustrations on this page show some of the installation arrangements for multiple concentric terminations that are allowed.

See Multiple Concentric Termination Clearances on page 31 for detailed information on clearances and additional arrangement options.

Note: When multiple concentric terminations are installed through a roof in the same location all termination caps must be at the same height measured from the ground.

Two Concentric Terminations

Two concentric terminations may be installed in close proximity as shown in Figure 37 or with standard clearances when this arrangement is not possible. See Figure 32 on page 31 for detailed information on clearances. See Figure 33 on page 31 when installing three concentric terminations.

SIDEWALL

ROOF

Figure 37

Four Concentric Terminations

Four concentric terminations may be installed in close proximity as shown in Figure 38. See Figure 34 and Figure 35 on page 31 for detailed information on clearances and additional arrangement options.

SIDEWALL

ROOF

Figure 38

Eight Concentric Terminations

Eight concentric terminations may be installed in two stacked groups of four, in close proximity, as shown in Figure 39. See Figure 36 on page 31 for detailed information on clearances.

Lateral groups of four as shown in Figure 35 on page 31 may be a more convenient installation arrangement for multiple groups depending on available space.

SIDEWALL

ROOF

Figure 39

31

Image 31
Contents Commercial gas water heaters Table Of Contents ANSI/NSF-5 Safe Installation, Use and ServiceOptional Overheated water can cause water tank explosion General Safety InformationPrecautions Hydrogen Gas FlammableFire and Explosion Hazard Installing, using or servicing Water heaterQualifications Preparing For The InstallationIntroduction Abbreviations UsedBasic Operation Features And ComponentsTop View Water Heater’s 120 VAC on/off switchTop View Components Side Views Gas Line Connection Size Installation ConsiderationsRough In Dimensions Recovery CapacitiesIntake Air and Vent Pipe Clearances Service ClearanceLocating The Water Heater Clearance To Combustible MaterialsCirculation Pumps Extended Vent TerminationsOptional Concentric Terminations Hard WaterSupply Gas Line Installation RequirementsPower Supply Gas Pressure RequirementsThermal Expansion Mixing ValvesDishwashing Machines Closed Water SystemsValve Discharge Pipe Requirements Temperature-Pressure Relief ValveCondensate Drain Water Trap Condensate DrainCombustible Material Storage Contaminated AirUnconfined Space Air RequirementsConfined Space Outdoor Air Through Two Horizontal Ducts Fresh Air Openings For Confined SpacesOutdoor Air Through Two Openings Outdoor Air Through One OpeningPage Inspection Commonwealth of MassachusettsGeneral Venting Information Venting InstallationGeneral Venting Instructions Venting Requirements Power Vent Installation Venting Installation SequenceDirect Vent Installation 3 Reducer Vertical Termination InstallationVertical Termination Direct Vent Sidewall Termination Installation Inch Concentric Termination Flat Roof Clearance Concentric Termination InstallationInch Concentric Termination KIT Inch Concentric Termination InstallationInch Concentric Termination Sidewall Installation Eight Concentric Terminations TWO Concentric TerminationsThree Concentric Terminations Four Concentric TerminationsTwo Concentric Terminations Multiple Concentric Termination ArrangementsEight Concentric Terminations Venting Arrangements Power Vent HorizontalDirect Vent Horizontal Direct Vent Horizontal Vent Vertical Intake Direct Vent Vertical Vent Horizontal IntakeDirect Vent Horizontal Concentric Power Vent Termination Clearances Sidewall Power VentDirect Vent Termination Clearances Sidewall Direct VentInstallation Instructions Water Heater InstallationCondensate Drain Installation Installation NotesSupply Gas Line Sizing Metric Units Supply Gas Line InstallationGas Line Sizing Supply Gas Line Sizing U. S. UnitsGas Line Leak Testing Supply Gas Regulator InstallationGas Line Connection Connecting An External Supervisory Control Electrical WiringPower Supply Connections Enable/Disable CircuitThermometers not Supplied Water Piping DiagramsWater Line Connections Valve Discharge PipeThermostat Control Temperature RegulationHigh Temperature Limit Control ECO High Temperature ApplicationsUser Input Buttons Control System OperationOverview Control System NavigationIcon Description Status IconsMenu Description Operating StatesState Description Control System MenusDescription/Action Display User Settings & Control System MenusUpdate Cancel Back HelpChange Back Help Heater Information Description/Action Display Display Settings Description/ActionYES Back AdvancedView Back Help ECOName UpdateService Contact Information Select Back HelpPrior to Start up Start UpInitial Start Up Multiple Appliance Installations Supply Gas Pressure AdjustmentManifold Gas Pressure Adjustment To Turn Off Gas High Altitude InstallationsChecking The Firing Rate 1050 = 300,000 Btu/hr 87.9 kWLighting & Operation Label Lighting The Water HeaterHoneywell Installation Checklist TroubleshootingSequence Of Operation Water is heated to VAC Gas Valve Sequence Of Operation Flow ChartClosed by control system Fault Msg is displayed Pre-Purge cycleMomentary Ignition Operational ProblemsInstallation Errors Rough Starting, Rough OperationFault And Alert Conditions Possible Causes Check/Repair Displayed Fault/Alert Message Fault And Alert MessagesNo Anode Voltage Blower Prover FailureDraining And Flushing MaintenanceMaintenance Schedule GeneralSediment Removal Filling The Water HeaterLime Scale Removal Vent System Powered Anode RodsDrain Valve and Access Panels Temperature-Pressure Relief Valve TestCCB Central Control Board Layout DiagramsUser Interface Modul SUF 130 300 Wiring DiagramUser SUF 130 400, 500 Wiring DiagramCirculation Pump Wiring Diagrams Water Piping Diagrams Temperature & Pressure Tank Temperature ALT. Cold Water State Storage Tank Water Piping Diagrams Line Temperature Control HOT Water Outlet Pipe T&P to Open Drain Finished Floor Limited Warranty