State Industries SUF-130- 300/400/500 User Interface Modul, SUF 130 300 Wiring Diagram

Page 64

SUF 130 300 Wiring Diagram

E

 

LOW GAS

24 VAC

BLOCKED

BLOCKED

BLOWER

 

PRESSURE SWITCH

GAS VALVE

AIR INTAKE

EXHAUST

PROVER

 

1

 

 

 

 

 

13

 

 

 

 

 

2

 

 

 

 

 

15

 

 

 

 

 

4

 

 

 

 

 

14

 

 

 

 

 

5

 

 

 

 

J

10

 

 

 

 

6

 

 

 

 

6

7

 

 

 

 

 

 

 

 

 

 

8

 

 

 

 

 

11

ENABLE/DISABLE CIRCUIT

 

 

 

 

 

JUMPER WIRE BETWEEN PINS

 

 

 

 

8 AND 11 ON J6 PLUG

 

 

 

UIM

USER INTERFACE MODUL

J16

J5

1 BLACK

2 WHITE

 

 

J

RED

 

4

 

 

 

1 RED (ECO)

 

J

2 BLACK

 

3 BLACK

C

7

4 RED (ECO)

CB

 

 

 

(CENTRAL

J15 J10

1 BLACK

2 BLACK

1 GREEN

2 BLUE

 

CONTROL

J13

 

BOARD)

J2

1 BLACK

2 WHITE

 

 

J

1 2 RED

 

2 GREEN

 

3

 

 

HOT SURFACE IGNITER

FLAME SENSOR

UPPER TEMPERATURE PROBE

LOWER TEMPERATURE PROBE

120 VAC 1 Ø POWER

1

 

2

ANODE 1

ANODE 2

COMBUSTION

BLOWER

 

3 WHITE

 

 

GREEN

 

 

 

1 BLACK120 VAC HOT

J

3 WHITE 120 VAC NEUTRAL

1

4 YEL 24 VAC

 

 

4 YEL 24 VAC

TRANSFORMER 50VA

 

 

 

 

JUNCTION BOX

GREEN

 

GROUND

GREEN

GREEN

 

 

 

 

BLACK

ON/OFF

WHITE

N

120 VAC NEUTRAL

 

 

 

 

 

 

RED

 

 

BLACK

L

 

 

 

WHITE

SWITCH

 

120 VAC HOT

 

GROUND STRIP

 

 

 

 

 

 

INSIDE CCB

BURNER GROUND

 

 

 

 

(BURNER BOLT)

 

 

 

 

ENCLOSURE

 

 

 

 

 

 

Figure 62

64

Image 64
Contents Commercial gas water heaters Table Of Contents ANSI/NSF-5 Safe Installation, Use and ServiceOptional General Safety Information PrecautionsHydrogen Gas Flammable Overheated water can cause water tank explosionInstalling, using or servicing Water heater Fire and Explosion HazardPreparing For The Installation IntroductionAbbreviations Used QualificationsFeatures And Components Basic OperationTop View Water Heater’s 120 VAC on/off switchTop View Components Side Views Installation Considerations Rough In DimensionsRecovery Capacities Gas Line Connection SizeService Clearance Locating The Water HeaterClearance To Combustible Materials Intake Air and Vent Pipe ClearancesExtended Vent Terminations Optional Concentric TerminationsHard Water Circulation PumpsInstallation Requirements Power SupplyGas Pressure Requirements Supply Gas LineMixing Valves Dishwashing MachinesClosed Water Systems Thermal ExpansionTemperature-Pressure Relief Valve Valve Discharge Pipe RequirementsCondensate Drain Combustible Material StorageContaminated Air Condensate Drain Water TrapUnconfined Space Air RequirementsConfined Space Fresh Air Openings For Confined Spaces Outdoor Air Through Two OpeningsOutdoor Air Through One Opening Outdoor Air Through Two Horizontal DuctsPage Commonwealth of Massachusetts InspectionGeneral Venting Information Venting InstallationGeneral Venting Instructions Venting Requirements Power Vent Installation Venting Installation SequenceDirect Vent Installation Vertical Termination Installation 3 ReducerVertical Termination Direct Vent Sidewall Termination Installation Concentric Termination Installation Inch Concentric Termination Flat Roof ClearanceInch Concentric Termination Installation Inch Concentric Termination KITInch Concentric Termination Sidewall Installation TWO Concentric Terminations Three Concentric TerminationsFour Concentric Terminations Eight Concentric TerminationsTwo Concentric Terminations Multiple Concentric Termination ArrangementsEight Concentric Terminations Venting Arrangements Power Vent HorizontalDirect Vent Horizontal Direct Vent Horizontal Vent Vertical Intake Direct Vent Vertical Vent Horizontal IntakeDirect Vent Horizontal Concentric Termination Clearances Sidewall Power Vent Power VentTermination Clearances Sidewall Direct Vent Direct VentWater Heater Installation Condensate Drain InstallationInstallation Notes Installation InstructionsSupply Gas Line Installation Gas Line SizingSupply Gas Line Sizing U. S. Units Supply Gas Line Sizing Metric UnitsGas Line Leak Testing Supply Gas Regulator InstallationGas Line Connection Electrical Wiring Power Supply ConnectionsEnable/Disable Circuit Connecting An External Supervisory ControlWater Piping Diagrams Water Line ConnectionsValve Discharge Pipe Thermometers not SuppliedTemperature Regulation High Temperature Limit Control ECOHigh Temperature Applications Thermostat ControlControl System Operation OverviewControl System Navigation User Input ButtonsStatus Icons Icon DescriptionOperating States State DescriptionControl System Menus Menu DescriptionUser Settings & Control System Menus Update CancelBack Help Description/Action DisplayChange Back Help Display Settings Description/Action Heater Information Description/Action DisplayBack Advanced View Back HelpECO YESUpdate Service Contact InformationSelect Back Help NamePrior to Start up Start UpInitial Start Up Multiple Appliance Installations Supply Gas Pressure AdjustmentManifold Gas Pressure Adjustment High Altitude Installations Checking The Firing Rate1050 = 300,000 Btu/hr 87.9 kW To Turn Off GasLighting & Operation Label Lighting The Water HeaterHoneywell Installation Checklist TroubleshootingSequence Of Operation Sequence Of Operation Flow Chart Closed by control system Fault Msg is displayedPre-Purge cycle Water is heated to VAC Gas ValveOperational Problems Installation ErrorsRough Starting, Rough Operation Momentary IgnitionFault And Alert Conditions Fault And Alert Messages Possible Causes Check/Repair Displayed Fault/Alert MessageBlower Prover Failure No Anode VoltageMaintenance Maintenance ScheduleGeneral Draining And Flushing Sediment Removal Filling The Water Heater Lime Scale Removal Powered Anode Rods Drain Valve and Access PanelsTemperature-Pressure Relief Valve Test Vent SystemDiagrams CCB Central Control Board LayoutSUF 130 300 Wiring Diagram User Interface ModulSUF 130 400, 500 Wiring Diagram UserCirculation Pump Wiring Diagrams Water Piping Diagrams Temperature & Pressure Tank Temperature ALT. Cold Water State Storage Tank Water Piping Diagrams Line Temperature Control HOT Water Outlet Pipe T&P to Open Drain Finished Floor Limited Warranty