State Industries SUF-130- 300/400/500 Termination Clearances Sidewall Power Vent

Page 34

Termination Clearances Sidewall Power Vent

 

 

 

 

 

 

POWER VENT

 

 

 

 

 

 

 

 

(using room air for combustion)

 

 

 

 

EXTERIOR CLEARANCES FOR SIDEWALL VENT TERMINATION

 

 

 

 

 

 

 

 

G

 

 

 

 

 

 

 

 

 

 

 

 

 

 

V

 

 

 

 

 

 

 

 

D

 

 

 

 

 

A

 

 

 

 

 

H

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

vE

 

 

 

 

 

 

 

 

 

 

 

 

 

L

B

 

 

 

 

 

 

 

 

 

 

 

 

 

 

v

 

 

 

 

 

 

 

 

B

 

 

 

 

 

 

 

 

C

 

B

 

 

 

V

 

 

 

 

 

 

 

 

 

 

 

FIXED

 

 

 

 

 

 

 

 

 

 

 

E

 

 

 

 

 

 

V

FIXED

 

V

 

OPERABL

CLOSED

 

M

 

X

 

 

 

 

 

 

 

 

 

 

 

CLOSED

 

 

 

 

 

 

 

V

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OPERABL

E

 

 

 

 

X

 

 

 

 

 

 

V

B

 

V

 

 

 

 

 

 

 

F

 

 

 

 

 

 

 

 

 

 

 

 

B

 

J

 

 

 

K

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

B

 

 

 

 

 

 

 

 

 

 

V

VENT TERMINAL

X AIR SUPPLY INLET

 

AREA WHERE TERMINAL IS NOT PERMITTED

Figure 48

Vent terminal clearances for “Power Vent” installations. Power Vent configurations use room air for combustion.

 

 

Canadian Installations 1

US Installations 2

 

 

Canadian Installations 1

US Installations 2

 

Clearance above grade,

 

 

 

Clearance to each side

3 feet (91 cm) within a height 15 feet

3 feet (91 cm) within a

A

 

 

H

of center line extended

height 15 feet (4.5 m)

veranda, porch, deck or

12 inches (30 cm)

12 inches (30 cm)

above meter/regulator

(4.5 m) above the meter/

above the meter/regulator

 

balcony

 

 

 

assembly

regulator assembly

assembly*

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6 inches (15 cm) for appliances up to

 

 

 

 

 

 

Clearance to window

10,000 Btu/hr (3 kW), 12 inches (30

4 feet (1.2 m) below

 

Clearance to service

 

 

B

cm) for appliances between 10,000

or to side of opening;

I

 

 

or door that may be

regulator vent outlet

3 feet (91 cm)

3 feet (91 cm)*

Btu/hr (3 kW) and 100,000 Btu/hr (30

1 foot (30 cm) above

 

opened

kW), 36 inches (91 cm) for appliances

opening

 

 

 

 

 

 

 

 

 

 

 

 

above 100,000 Btu/hr (30 kW)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6 inches (15 cm) for appliances up

 

 

 

 

 

 

Clearance to a non

to 10,000 Btu/hr (3 kW), 12 inches

4 feet (1.2 m) below or to

 

Clearance to

 

 

 

mechanical air supply

(30 cm) for appliances between

C

 

 

J

side of opening; 1 foot

permanently closed

12 inches (30 cm)*

12 inches (30 cm)*

inlet into building or

10,000 Btu/hr (3 kW) and 100,000

(30 cm) above opening.

 

window

 

 

 

combustion air inlet to

Btu/hr (30kW), 36 inches (91cm)

 

 

 

 

 

 

any other appliance

for appliances above 100,000 Btu/

 

 

 

 

 

 

 

hr (30 kW)

 

 

 

 

 

 

 

 

 

 

Vertical clearance to

 

 

 

 

 

 

 

ventilated soffit located

 

 

 

 

 

3 feet (91 cm) above if

 

above the terminal

 

 

 

Clearance to a

 

D

 

 

K

 

within

within a horizontal

12 inches (30 cm)*

12 inches (30 cm)*

mechanical air supply

6 feet (1.83 m)

10 feet (3 m) horizontally

 

distance of 2 feet (61

 

 

 

inlet

 

 

 

cm) from the center line

 

 

 

 

 

 

 

of the terminal

 

 

 

 

 

 

 

 

 

 

 

Clearance above paved

 

 

E

Clearance to

12 inches (30 cm)*

12 inches (30 cm)*

L

sidewalk or paved

7 feet (2.13 m)†

7 feet (2.13 m)

unventilated soffit

driveway located on

 

 

 

 

 

 

public property

 

 

 

 

 

 

 

 

 

 

F

cornerClearance to outside

 

 

M

Clearance under

 

 

2 feet (60 cm)*

2 feet (60 cm)*

veranda, porch, deck, or

12 inches (30 cm) ‡

12 inches (30 cm) ‡

 

 

 

 

 

balcony

 

 

G

cornerClearance to inside

18 inches (45 cm)*

18 inches (45 cm)*

 

 

 

 

1 In accordance with the current CSA B149.1, Natural Gas and Propane Installation Code. 2 In accordance with the current ANSI Z223.1/NFPA 54, National Fuel Gas Code.

A vent shall not terminate directly above a sidewalk or paved driveway that is located between two single family dwellings and serves both dwellings.

‡ Permitted only if veranda, porch, deck, or balcony is fully open on a minimum of two sides beneath the floor.

* Clearance in accordance with local installation codes and the requirements of the gas supplier and the manufacturer’s installation instructions.

34

Image 34
Contents Commercial gas water heaters Table Of Contents ANSI/NSF-5 Safe Installation, Use and ServiceOptional Hydrogen Gas Flammable General Safety InformationPrecautions Overheated water can cause water tank explosionInstalling, using or servicing Water heater Fire and Explosion HazardAbbreviations Used Preparing For The InstallationIntroduction QualificationsFeatures And Components Basic OperationTop View Water Heater’s 120 VAC on/off switchTop View Components Side Views Recovery Capacities Installation ConsiderationsRough In Dimensions Gas Line Connection SizeClearance To Combustible Materials Service ClearanceLocating The Water Heater Intake Air and Vent Pipe ClearancesHard Water Extended Vent TerminationsOptional Concentric Terminations Circulation PumpsGas Pressure Requirements Installation RequirementsPower Supply Supply Gas LineClosed Water Systems Mixing ValvesDishwashing Machines Thermal ExpansionTemperature-Pressure Relief Valve Valve Discharge Pipe RequirementsContaminated Air Condensate DrainCombustible Material Storage Condensate Drain Water TrapUnconfined Space Air RequirementsConfined Space Outdoor Air Through One Opening Fresh Air Openings For Confined SpacesOutdoor Air Through Two Openings Outdoor Air Through Two Horizontal DuctsPage Commonwealth of Massachusetts InspectionGeneral Venting Information Venting InstallationGeneral Venting Instructions Venting Requirements Power Vent Installation Venting Installation SequenceDirect Vent Installation Vertical Termination Installation 3 ReducerVertical Termination Direct Vent Sidewall Termination Installation Concentric Termination Installation Inch Concentric Termination Flat Roof ClearanceInch Concentric Termination Installation Inch Concentric Termination KITInch Concentric Termination Sidewall Installation Four Concentric Terminations TWO Concentric TerminationsThree Concentric Terminations Eight Concentric TerminationsTwo Concentric Terminations Multiple Concentric Termination ArrangementsEight Concentric Terminations Venting Arrangements Power Vent HorizontalDirect Vent Horizontal Direct Vent Horizontal Vent Vertical Intake Direct Vent Vertical Vent Horizontal IntakeDirect Vent Horizontal Concentric Termination Clearances Sidewall Power Vent Power VentTermination Clearances Sidewall Direct Vent Direct VentInstallation Notes Water Heater InstallationCondensate Drain Installation Installation InstructionsSupply Gas Line Sizing U. S. Units Supply Gas Line InstallationGas Line Sizing Supply Gas Line Sizing Metric UnitsGas Line Leak Testing Supply Gas Regulator InstallationGas Line Connection Enable/Disable Circuit Electrical WiringPower Supply Connections Connecting An External Supervisory ControlValve Discharge Pipe Water Piping DiagramsWater Line Connections Thermometers not SuppliedHigh Temperature Applications Temperature RegulationHigh Temperature Limit Control ECO Thermostat ControlControl System Navigation Control System OperationOverview User Input ButtonsStatus Icons Icon DescriptionControl System Menus Operating StatesState Description Menu DescriptionBack Help User Settings & Control System MenusUpdate Cancel Description/Action DisplayChange Back Help Display Settings Description/Action Heater Information Description/Action DisplayECO Back AdvancedView Back Help YESSelect Back Help UpdateService Contact Information NamePrior to Start up Start UpInitial Start Up Multiple Appliance Installations Supply Gas Pressure AdjustmentManifold Gas Pressure Adjustment 1050 = 300,000 Btu/hr 87.9 kW High Altitude InstallationsChecking The Firing Rate To Turn Off GasLighting & Operation Label Lighting The Water HeaterHoneywell Installation Checklist TroubleshootingSequence Of Operation Pre-Purge cycle Sequence Of Operation Flow ChartClosed by control system Fault Msg is displayed Water is heated to VAC Gas ValveRough Starting, Rough Operation Operational ProblemsInstallation Errors Momentary IgnitionFault And Alert Conditions Fault And Alert Messages Possible Causes Check/Repair Displayed Fault/Alert MessageBlower Prover Failure No Anode VoltageGeneral MaintenanceMaintenance Schedule Draining And FlushingSediment Removal Filling The Water HeaterLime Scale Removal Temperature-Pressure Relief Valve Test Powered Anode RodsDrain Valve and Access Panels Vent SystemDiagrams CCB Central Control Board LayoutSUF 130 300 Wiring Diagram User Interface ModulSUF 130 400, 500 Wiring Diagram UserCirculation Pump Wiring Diagrams Water Piping Diagrams Temperature & Pressure Tank Temperature ALT. Cold Water State Storage Tank Water Piping Diagrams Line Temperature Control HOT Water Outlet Pipe T&P to Open Drain Finished Floor Limited Warranty