State Industries SUF-130- 300/400/500 Termination Clearances Sidewall Direct Vent

Page 35

Termination Clearances Sidewall Direct Vent

 

 

 

 

 

 

DIRECT VENT

 

 

 

 

 

 

 

 

(using outdoor air for combustion)

 

 

 

 

EXTERIOR CLEARANCES FOR SIDEWALL VENT TERMINATION

 

 

 

 

 

 

 

 

G

 

 

 

 

 

 

 

 

 

 

 

 

 

 

V

 

 

 

 

 

 

 

 

D

 

 

 

 

 

A

 

 

 

 

 

H

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

vE

 

 

 

 

 

 

 

 

 

 

 

 

 

L

B

 

 

 

 

 

 

 

 

 

 

 

 

 

 

v

 

 

 

 

 

 

 

 

B

 

 

 

 

 

 

 

 

C

 

B

 

 

 

V

 

 

 

 

 

 

 

 

 

 

 

FIXED

 

 

 

 

 

 

 

 

 

 

 

E

 

 

 

 

 

 

V

FIXED

 

V

 

OPERABL

CLOSED

 

M

 

X

 

 

 

 

 

 

 

 

 

 

 

CLOSED

 

 

 

 

 

 

 

V

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OPERABL

E

 

 

 

 

X

 

 

 

 

 

 

V

B

 

V

 

 

 

 

 

 

 

F

 

 

 

 

 

 

 

 

 

 

 

 

B

 

J

 

 

 

K

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

B

 

 

 

 

 

 

 

 

 

 

V

VENT TERMINAL

X AIR SUPPLY INLET

 

AREA WHERE TERMINAL IS NOT PERMITTED

Figure 49

Vent terminal clearances for “Direct Vent” installations. Direct Vent configurations use outdoor air for combustion.

 

 

Canadian Installations 1

US Installations 2

 

 

Canadian Installations 1

US Installations 2

 

Clearance above grade,

 

 

 

Clearance to each side

3 feet (91 cm) within a height 15

3 feet (91 cm) within a height

A

 

 

H

of center line extended

veranda, porch, deck or

12 inches (30 cm)

12 inches (30 cm)

above meter/regulator

feet (4.5 m) above the meter/

15 feet (4.5 m) above the

 

balcony

 

 

 

assembly

regulator assembly

meter/regulator assembly*

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6 inches (15 cm)

 

 

 

 

 

 

6 inches (15 cm) for appliances

for appliances up to

 

 

 

 

 

 

10,000 Btu/hr (3 kW),

 

 

 

 

 

 

up to 10,000 Btu/hr (3 kW), 12

 

 

 

 

 

 

9 inches (23 cm) for

 

 

 

 

 

 

inches (30 cm) for appliances

 

 

 

 

B

Clearance to window or

appliances between

I

Clearance to service

 

 

between 10,000 Btu/hr (3 kW)

3 feet (91 cm)

3 feet (91 cm)*

door that may be opened

10,000 Btu/hr (3 kW)

regulator vent outlet

 

 

and 100,000 Btu/hr (30 kW), 36

and 50,000 Btu/hr (15

 

 

 

 

 

 

inches (91 cm) for appliances

 

 

 

 

 

 

kW), 12 inches (30 cm)

 

 

 

 

 

 

above 100,000 Btu/hr (30 kW)

 

 

 

 

 

 

for appliances above

 

 

 

 

 

 

 

 

 

 

 

 

 

 

50,000 Btu/hr (15 kW)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6 inches (15 cm) for appliances up

6 inches (15 cm) for

 

 

 

 

 

 

appliances up to 10,000

 

 

 

 

 

Clearance to a non

to 10,000 Btu/hr (3 kW), 12 inches

 

 

 

 

 

Btu/hr (3 kW), 9 inches (23

 

Clearance to

 

 

 

mechanical air supply

(30 cm) for appliances between

C

 

 

J

cm) for appliances between

permanently closed

6 inches (15 cm)*

6 inches (15 cm)*

inlet into building or

10,000 Btu/hr (3 kW) and 100,000

10,000 Btu/hr (3 kW) and

 

window

 

 

 

combustion air inlet to

Btu/hr (30 kW), 36 inches (91 cm)

50,000 Btu/hr (15 kW), 12

 

 

 

 

 

any other appliance

for appliances above 100,000 Btu/

 

 

 

 

 

inches (30 cm) for appliances

 

 

 

 

 

 

hr (30 kW)

 

 

 

 

 

 

above 50,000 Btu/hr (15 kW)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Vertical clearance to

 

 

 

 

 

 

 

ventilated soffit located

 

 

 

Clearance to a

 

 

D

above the terminal within

 

 

K

 

3 feet (91 cm) above if within

12 inches (30 cm)*

12 inches (30 cm)*

mechanical air supply

6 feet (1.83 m)

a horizontal distance of

10 feet (3 m) horizontally

 

2 feet (61 cm) from the

 

 

 

inlet

 

 

 

 

 

 

 

 

 

 

center line of the terminal

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Clearance above

 

 

E

Clearance to unventilated

12 inches (30 cm)*

12 inches (30 cm)*

L

paved sidewalk or

7 feet (2.13 m)†

7 feet (2.13 m)†*

soffit

paved driveway located

 

 

 

 

 

on public property

 

 

 

 

 

 

 

 

 

 

F

cornerClearance to outside

 

 

M

Clearance under

 

 

2 feet (60 cm)*

2 feet (60 cm)*

veranda, porch, deck,

12 inches (30 cm) ‡

12 inches (30 cm) ‡*

 

 

 

 

 

or balcony

 

 

G

cornerClearance to inside

18 inches (45 cm)*

18 inches (45 cm)*

 

 

 

 

1 In accordance with the current CSA B149.1, Natural Gas and Propane Installation Code. 2 In accordance with the current ANSI Z223.1/NFPA 54, National Fuel Gas Code.

A vent shall not terminate directly above a sidewalk or paved driveway that is located between two single family dwellings and serves both dwellings.

‡ Permitted only if veranda, porch, deck, or balcony is fully open on a minimum of two sides beneath the floor.

* Clearance in accordance with local installation codes and the requirements of the gas supplier and the manufacturer’s installation instructions.

35

Image 35
Contents Commercial gas water heaters Table Of Contents Optional Safe Installation, Use and ServiceANSI/NSF-5 Overheated water can cause water tank explosion General Safety InformationPrecautions Hydrogen Gas FlammableFire and Explosion Hazard Installing, using or servicing Water heaterQualifications Preparing For The InstallationIntroduction Abbreviations UsedBasic Operation Features And ComponentsTop View Components Water Heater’s 120 VAC on/off switchTop View Side Views Gas Line Connection Size Installation ConsiderationsRough In Dimensions Recovery CapacitiesIntake Air and Vent Pipe Clearances Service ClearanceLocating The Water Heater Clearance To Combustible MaterialsCirculation Pumps Extended Vent TerminationsOptional Concentric Terminations Hard WaterSupply Gas Line Installation RequirementsPower Supply Gas Pressure RequirementsThermal Expansion Mixing ValvesDishwashing Machines Closed Water SystemsValve Discharge Pipe Requirements Temperature-Pressure Relief ValveCondensate Drain Water Trap Condensate DrainCombustible Material Storage Contaminated AirConfined Space Air RequirementsUnconfined Space Outdoor Air Through Two Horizontal Ducts Fresh Air Openings For Confined SpacesOutdoor Air Through Two Openings Outdoor Air Through One OpeningPage Inspection Commonwealth of MassachusettsGeneral Venting Instructions Venting InstallationGeneral Venting Information Venting Requirements Direct Vent Installation Venting Installation SequencePower Vent Installation 3 Reducer Vertical Termination InstallationVertical Termination Direct Vent Sidewall Termination Installation Inch Concentric Termination Flat Roof Clearance Concentric Termination InstallationInch Concentric Termination KIT Inch Concentric Termination InstallationInch Concentric Termination Sidewall Installation Eight Concentric Terminations TWO Concentric TerminationsThree Concentric Terminations Four Concentric TerminationsEight Concentric Terminations Multiple Concentric Termination ArrangementsTwo Concentric Terminations Direct Vent Horizontal Power Vent HorizontalVenting Arrangements Direct Vent Horizontal Concentric Direct Vent Vertical Vent Horizontal IntakeDirect Vent Horizontal Vent Vertical Intake Power Vent Termination Clearances Sidewall Power VentDirect Vent Termination Clearances Sidewall Direct VentInstallation Instructions Water Heater InstallationCondensate Drain Installation Installation NotesSupply Gas Line Sizing Metric Units Supply Gas Line InstallationGas Line Sizing Supply Gas Line Sizing U. S. UnitsGas Line Connection Supply Gas Regulator InstallationGas Line Leak Testing Connecting An External Supervisory Control Electrical WiringPower Supply Connections Enable/Disable CircuitThermometers not Supplied Water Piping DiagramsWater Line Connections Valve Discharge PipeThermostat Control Temperature RegulationHigh Temperature Limit Control ECO High Temperature ApplicationsUser Input Buttons Control System OperationOverview Control System NavigationIcon Description Status IconsMenu Description Operating StatesState Description Control System MenusDescription/Action Display User Settings & Control System MenusUpdate Cancel Back HelpChange Back Help Heater Information Description/Action Display Display Settings Description/ActionYES Back AdvancedView Back Help ECOName UpdateService Contact Information Select Back HelpInitial Start Up Start UpPrior to Start up Manifold Gas Pressure Adjustment Supply Gas Pressure AdjustmentMultiple Appliance Installations To Turn Off Gas High Altitude InstallationsChecking The Firing Rate 1050 = 300,000 Btu/hr 87.9 kWHoneywell Lighting The Water HeaterLighting & Operation Label Sequence Of Operation TroubleshootingInstallation Checklist Water is heated to VAC Gas Valve Sequence Of Operation Flow ChartClosed by control system Fault Msg is displayed Pre-Purge cycleMomentary Ignition Operational ProblemsInstallation Errors Rough Starting, Rough OperationFault And Alert Conditions Possible Causes Check/Repair Displayed Fault/Alert Message Fault And Alert MessagesNo Anode Voltage Blower Prover FailureDraining And Flushing MaintenanceMaintenance Schedule GeneralLime Scale Removal Filling The Water HeaterSediment Removal Vent System Powered Anode RodsDrain Valve and Access Panels Temperature-Pressure Relief Valve TestCCB Central Control Board Layout DiagramsUser Interface Modul SUF 130 300 Wiring DiagramUser SUF 130 400, 500 Wiring DiagramCirculation Pump Wiring Diagrams Water Piping Diagrams Temperature & Pressure Tank Temperature ALT. Cold Water State Storage Tank Water Piping Diagrams Line Temperature Control HOT Water Outlet Pipe T&P to Open Drain Finished Floor Limited Warranty