State Industries SUF-130- 300/400/500 instruction manual Line Temperature Control

Page 72

Water Piping Diagrams

Before installation of water piping review the following:

1.See Mixing Valves on page 72.

2.See Dishwashing Machines on page 72.

3.See Temperature-Pressure Relief Valve on page 72.

4.See Closed Systems and Thermal Expansion on page 72

5.See Water Line Connections on page 72.

6.If a pump is being installed between a water heater and storage tank or on a building recirculation loop wire according to Figure 64 on page 72.

7.If a pump is being installed in a recirculation loop between the water heater and a commercial dishwasher wire according to Figure 64 or Figure 65 on page 72.

THREE WATER HEATERS, SINGLE TEMPERATURE WITH BUILDING RECIRCULATION

LEGEND

72

WARNING: THIS DRAWING SHOWS SUGGESTED PIPING CONFIGURATION AND OTHER DEVICES; CHECK WITH LOCAL CODES AND ORDINANCES FOR ADDITIONAL REQUIREMENTS.

HOT WATER

OUTLET

TEMPERATURE & PRESSURE RELIEF VALVE

PRESSURE RELIEF VALVE

CIRCULATING PUMP

TANK OR LINE TEMPERATURE CONTROL

DRAIN

FULL PORT BALL VALVE

CHECK VALVE

TEMPERATURE GAGE

WATER FLOW SWITCH

LINE TEMPERATURE CONTROL

PIPE T&P TO OPEN DRAIN

PIPE T&P TO OPEN DRAIN

PIPE T&P TO OPEN DRAIN

HOT WATER RETURN

FINISHED

FLOOR

COLD WATER

SUPPLY

EXPANSION

TANK

Image 72
Contents Commercial gas water heaters Table Of Contents Safe Installation, Use and Service ANSI/NSF-5Optional General Safety Information PrecautionsHydrogen Gas Flammable Overheated water can cause water tank explosionInstalling, using or servicing Water heater Fire and Explosion HazardPreparing For The Installation IntroductionAbbreviations Used QualificationsFeatures And Components Basic OperationWater Heater’s 120 VAC on/off switch Top ViewTop View Components Side Views Installation Considerations Rough In DimensionsRecovery Capacities Gas Line Connection SizeService Clearance Locating The Water HeaterClearance To Combustible Materials Intake Air and Vent Pipe ClearancesExtended Vent Terminations Optional Concentric TerminationsHard Water Circulation PumpsInstallation Requirements Power SupplyGas Pressure Requirements Supply Gas LineMixing Valves Dishwashing MachinesClosed Water Systems Thermal ExpansionTemperature-Pressure Relief Valve Valve Discharge Pipe RequirementsCondensate Drain Combustible Material StorageContaminated Air Condensate Drain Water TrapAir Requirements Unconfined SpaceConfined Space Fresh Air Openings For Confined Spaces Outdoor Air Through Two OpeningsOutdoor Air Through One Opening Outdoor Air Through Two Horizontal DuctsPage Commonwealth of Massachusetts InspectionVenting Installation General Venting InformationGeneral Venting Instructions Venting Requirements Venting Installation Sequence Power Vent InstallationDirect Vent Installation Vertical Termination Installation 3 ReducerVertical Termination Direct Vent Sidewall Termination Installation Concentric Termination Installation Inch Concentric Termination Flat Roof ClearanceInch Concentric Termination Installation Inch Concentric Termination KITInch Concentric Termination Sidewall Installation TWO Concentric Terminations Three Concentric TerminationsFour Concentric Terminations Eight Concentric TerminationsMultiple Concentric Termination Arrangements Two Concentric TerminationsEight Concentric Terminations Power Vent Horizontal Venting ArrangementsDirect Vent Horizontal Direct Vent Vertical Vent Horizontal Intake Direct Vent Horizontal Vent Vertical IntakeDirect Vent Horizontal Concentric Termination Clearances Sidewall Power Vent Power VentTermination Clearances Sidewall Direct Vent Direct VentWater Heater Installation Condensate Drain InstallationInstallation Notes Installation InstructionsSupply Gas Line Installation Gas Line SizingSupply Gas Line Sizing U. S. Units Supply Gas Line Sizing Metric UnitsSupply Gas Regulator Installation Gas Line Leak TestingGas Line Connection Electrical Wiring Power Supply ConnectionsEnable/Disable Circuit Connecting An External Supervisory ControlWater Piping Diagrams Water Line ConnectionsValve Discharge Pipe Thermometers not SuppliedTemperature Regulation High Temperature Limit Control ECOHigh Temperature Applications Thermostat ControlControl System Operation OverviewControl System Navigation User Input ButtonsStatus Icons Icon DescriptionOperating States State DescriptionControl System Menus Menu DescriptionUser Settings & Control System Menus Update CancelBack Help Description/Action DisplayChange Back Help Display Settings Description/Action Heater Information Description/Action DisplayBack Advanced View Back HelpECO YESUpdate Service Contact InformationSelect Back Help NameStart Up Prior to Start upInitial Start Up Supply Gas Pressure Adjustment Multiple Appliance InstallationsManifold Gas Pressure Adjustment High Altitude Installations Checking The Firing Rate1050 = 300,000 Btu/hr 87.9 kW To Turn Off GasLighting The Water Heater Lighting & Operation LabelHoneywell Troubleshooting Installation ChecklistSequence Of Operation Sequence Of Operation Flow Chart Closed by control system Fault Msg is displayedPre-Purge cycle Water is heated to VAC Gas ValveOperational Problems Installation ErrorsRough Starting, Rough Operation Momentary IgnitionFault And Alert Conditions Fault And Alert Messages Possible Causes Check/Repair Displayed Fault/Alert MessageBlower Prover Failure No Anode VoltageMaintenance Maintenance ScheduleGeneral Draining And FlushingFilling The Water Heater Sediment RemovalLime Scale Removal Powered Anode Rods Drain Valve and Access PanelsTemperature-Pressure Relief Valve Test Vent SystemDiagrams CCB Central Control Board LayoutSUF 130 300 Wiring Diagram User Interface ModulSUF 130 400, 500 Wiring Diagram UserCirculation Pump Wiring Diagrams Water Piping Diagrams Temperature & Pressure Tank Temperature ALT. Cold Water State Storage Tank Water Piping Diagrams Line Temperature Control HOT Water Outlet Pipe T&P to Open Drain Finished Floor Limited Warranty