State Industries SUF-130- 300/400/500 Vertical Termination Installation, Reducer

Page 24

INSTALL TEE FITTING AS CLOSE TO WATER HEATER

INTAKE

INTAKE AIR CONNECTION AS POSSIBLE

AIR

FACTORY

PIPING

INTAKE AIR

CONNECTION

 

FIELD SUPPLIED 3” x 3” x 1/2” TEE WITH HOSE BARB FITTING INSTALLED

CONNECT FIELD

SUPPLIED FLEXIBLE

DRAIN HOSE TO BARB

FITTING AND FORM A

LOOP WATER TRAP IN

DRAIN HOSE

RUN DRAIN HOSE

TO SUITABLE FLOOR

DRAIN SEPARATELY

FROM OTHER

CONDENSATE DRAINS

INTAKE AIR CONDENSATE TEE INSTALLATION

Figure 16

13.Ensure the Balance Plate and Intake Air Screen on the Intake Air Connection are both removed before connecting the intake air pipe to the water heater, see Figure 17.

Breathing Hazard - Carbon Monoxide Gas

Do not obstruct water heater air intake.

Gas and carbon monoxide detectors are available.

Install water heater in accordance with the instruction manual.

Breathing carbon monoxide can cause brain damage or death. Always read and understand instruction manual.

Note: Do not leave the screen inside the Intake Air connection in Direct Vent installations. Once the intake air pipe is installed the screen will be hidden from view and may become clogged with debris over time. This will cause improper combustion.

INTAKE AIR SCREEN

(remove for Direct Vent)

BALANCE PLATE

4” x 3” REDUCER

COUPLING - FACTORY INSTALLED

INTAKE AIR CONNECTION DETAIL

Figure 17

14.If installing 4 inch intake air pipe connect the intake air pipe to the intake air connection on the water heater.

15.If installing 6” intake air pipe transition to 4” pipe at the intake air connection on the water heater as shown in Figure 18. The field installed 4” pipe between the intake air connection and the 6” x 4” reducer coupling should be 18 inches (45 cm) or less in length.

6” PIPE FIELD

4” PIPE FIELD

3” PIPE FACTORY

SUPPLIED

SUPPLIED

INSTALLED

INTAKE AIR

 

 

 

6” x 4” REDUCER

4” x 3” REDUCER

COMBUSTION

BLOWER

FIELD SUPPLIED

FACTORY INSTALLED

 

INTAKE AIR CONNECTION

INTAKE AIR CONNECTION

Figure 18

Vertical Termination Installation

1.Determine the location for the termination(s).

2.If installing only the vent (exhaust) piping in a Power Vent configuration vertically through the roof; ensure that all exterior vertical clearance requirements shown in Figure 19 and Figure 20 on page 24 are being maintained. These clearances and those cited by local and national codes must be maintained.

Note: On flat roof installations the vent termination must be a minimum of 24 inches (60 cm) above any parapet, vertical wall or structure within 10 feet (3 m) horizontally. See Figure 20 on page 24.

3.If installing both intake air and vent piping in a Direct Vent configuration vertically through the roof; ensure that all exterior vertical clearance requirements shown in Figure 19 and Figure 20 on page 24 are being maintained. These clearances and those cited by local and national codes must be maintained.

Note: On flat roof installations the intake air and the vent terminations must be a minimum of 24 inches (60 cm) above any parapet, vertical wall or structure within 10 feet (3 m) horizontally. See Figure 20 on page 24.

4.If installing only vent piping in a Power Vent configuration vertically through the roof the following instructions must be followed:

The vent termination must be oriented facing downward as shown in Figure 19 and Figure 20 on page 24.

The bottom edge of the vent termination must be a minimum of 12 inches (30 cm), 18 inches (45 cm) in Canada, above the average or expected snow level as shown in Figure 19 on page 24.

5.If installing both intake air and vent piping in a Direct Vent configuration vertically through the roof the following instructions must be followed:

24

Image 24
Contents Commercial gas water heaters Table Of Contents Safe Installation, Use and Service ANSI/NSF-5Optional General Safety Information PrecautionsHydrogen Gas Flammable Overheated water can cause water tank explosionInstalling, using or servicing Water heater Fire and Explosion HazardPreparing For The Installation IntroductionAbbreviations Used QualificationsFeatures And Components Basic OperationWater Heater’s 120 VAC on/off switch Top ViewTop View Components Side Views Installation Considerations Rough In DimensionsRecovery Capacities Gas Line Connection SizeService Clearance Locating The Water HeaterClearance To Combustible Materials Intake Air and Vent Pipe ClearancesExtended Vent Terminations Optional Concentric TerminationsHard Water Circulation PumpsInstallation Requirements Power SupplyGas Pressure Requirements Supply Gas LineMixing Valves Dishwashing MachinesClosed Water Systems Thermal ExpansionTemperature-Pressure Relief Valve Valve Discharge Pipe RequirementsCondensate Drain Combustible Material StorageContaminated Air Condensate Drain Water TrapAir Requirements Unconfined SpaceConfined Space Fresh Air Openings For Confined Spaces Outdoor Air Through Two OpeningsOutdoor Air Through One Opening Outdoor Air Through Two Horizontal DuctsPage Commonwealth of Massachusetts InspectionVenting Installation General Venting InformationGeneral Venting Instructions Venting Requirements Venting Installation Sequence Power Vent InstallationDirect Vent Installation Vertical Termination Installation 3 ReducerVertical Termination Direct Vent Sidewall Termination Installation Concentric Termination Installation Inch Concentric Termination Flat Roof ClearanceInch Concentric Termination Installation Inch Concentric Termination KITInch Concentric Termination Sidewall Installation TWO Concentric Terminations Three Concentric TerminationsFour Concentric Terminations Eight Concentric TerminationsMultiple Concentric Termination Arrangements Two Concentric TerminationsEight Concentric Terminations Power Vent Horizontal Venting ArrangementsDirect Vent Horizontal Direct Vent Vertical Vent Horizontal Intake Direct Vent Horizontal Vent Vertical IntakeDirect Vent Horizontal Concentric Termination Clearances Sidewall Power Vent Power VentTermination Clearances Sidewall Direct Vent Direct VentWater Heater Installation Condensate Drain InstallationInstallation Notes Installation InstructionsSupply Gas Line Installation Gas Line SizingSupply Gas Line Sizing U. S. Units Supply Gas Line Sizing Metric UnitsSupply Gas Regulator Installation Gas Line Leak TestingGas Line Connection Electrical Wiring Power Supply ConnectionsEnable/Disable Circuit Connecting An External Supervisory ControlWater Piping Diagrams Water Line ConnectionsValve Discharge Pipe Thermometers not SuppliedTemperature Regulation High Temperature Limit Control ECOHigh Temperature Applications Thermostat ControlControl System Operation OverviewControl System Navigation User Input ButtonsStatus Icons Icon DescriptionOperating States State DescriptionControl System Menus Menu DescriptionUser Settings & Control System Menus Update CancelBack Help Description/Action DisplayChange Back Help Display Settings Description/Action Heater Information Description/Action DisplayBack Advanced View Back HelpECO YESUpdate Service Contact InformationSelect Back Help NameStart Up Prior to Start upInitial Start Up Supply Gas Pressure Adjustment Multiple Appliance InstallationsManifold Gas Pressure Adjustment High Altitude Installations Checking The Firing Rate1050 = 300,000 Btu/hr 87.9 kW To Turn Off GasLighting The Water Heater Lighting & Operation LabelHoneywell Troubleshooting Installation ChecklistSequence Of Operation Sequence Of Operation Flow Chart Closed by control system Fault Msg is displayedPre-Purge cycle Water is heated to VAC Gas ValveOperational Problems Installation ErrorsRough Starting, Rough Operation Momentary IgnitionFault And Alert Conditions Fault And Alert Messages Possible Causes Check/Repair Displayed Fault/Alert MessageBlower Prover Failure No Anode VoltageMaintenance Maintenance ScheduleGeneral Draining And FlushingFilling The Water Heater Sediment RemovalLime Scale Removal Powered Anode Rods Drain Valve and Access PanelsTemperature-Pressure Relief Valve Test Vent SystemDiagrams CCB Central Control Board LayoutSUF 130 300 Wiring Diagram User Interface ModulSUF 130 400, 500 Wiring Diagram UserCirculation Pump Wiring Diagrams Water Piping Diagrams Temperature & Pressure Tank Temperature ALT. Cold Water State Storage Tank Water Piping Diagrams Line Temperature Control HOT Water Outlet Pipe T&P to Open Drain Finished Floor Limited Warranty