Enviro Cara owner manual Check burner for proper operation

Page 11

Maintenance And Service

To install the burner:

1.Insert the mixing tube into the mixing tube box (refer to Figure 8 or 9).

2.When the burner is resting in the firebox ensure that the front edge of the burner is lined up with the front lip of the firebox (see Figure 10 or 11).

3.Re-install the log set or rock set

(see SECONDARY INSTALATION - LOG SET INSTALLATION or SECONDARY INSTALATION - ROCK SET INSTALLATION) and the door.

4.Check burner for proper operation.

FIREBOX BAFFLE REMOVAL:

Figure 10: Align Log Set Burner With Firebox.

Figure 11: Align Rock Set Burner With Firebox.

The firebox baffle can be remove when cleaning the venting pipe.

1.Remove the glass door as shown in the MAINTENANCE AND SERVICE - GLASS DOOR REMOVAL.

2.Remove the two (2) Torx T-20 screws holding the front of the firebox baffle in place (refer to Figure

12). IMPORTANT: The baffle should be held in place when the screws are removed to prevent it from falling, which could damage the firebox liner, log set, or rock set.

3.Carefully push the back of the baffle up while pulling the front down (see A’s in Figure 13) then pull the baffle out of the firebox.

4.Re-install the firebox baffle and the door when done.

 

 

 

Figure 12: Firebox Baffle Screws Removal.

 

Figure 13: Firebox Baffle Removal.

11

Image 11
Contents Cara General Safety PrecautionsTable of Contents Vented GAS Fireplace Heater Cara DV NG/LPG Certified for installation from 0-4500 ft 0-1372 mCodes And Approvals Snorkel refer to ‘Converting Top Vented into Rear Vented’Cara Exterior Dimensions SpecificationsOperating Instructions For Your Safety Read Before OperatingCara Component Sound & Reason Pilot Flame Maintenance And ServiceNo substitute materials are allowed Check burner for proper operation Conversion Kit Installation Kit Parts ListOpen Flame When Testing for Leaks Qualified Installers only Initial InstallationCathedral Ceiling Manufacturer Trade Name Nominal Sizes 4DSC Vent Termination Restrictions Top Flue Restrictor Installation Wall Framing Hole for 51mm at top, 11⁄2 38mm at sides, 11⁄2 38mm at bottomInstalling Horizontal Vent Termination Box up through the roof line. Galvanized Roof Pitch Minimum Height Feet Meters Follow installation steps 1 & 2 under Initial Do not interfere with the structural integrity of the walls Converting Top Vented into Rear Vented Installation for Top Vented Horizontal Termination Min. Manifold Pressure Venturi SettingNatural Gas Propane Main Burner Manifold PressureA. Installations Wire Size Max. LengthCanadian Installations Optional Blower Fan Installation Log Placement of Rear Log Chunks Secondary InstallationLog Placement of Left Log Remove door to clean glass Addition the seven 7 small rocks. These can be To clean glass Problem Possible Cause Solution Trouble ShootingReference Part Description Number Parts ListParts List Parts Diagram To the Dealer WarrantyWarranty Warranty Installation Data Sheet