Enviro Cara owner manual Installation for Top Vented Horizontal Termination

Page 28

Initial Installation

QUALIFIED INSTALLERS ONLY

INSTALLATION OF TOP VENTED; HORIZONTAL TERMINATION:

This is the most common type of installation style. Set the unit in place.

Install a minimum 24” (61cm), although 36” (91.5cm) or more vertical vent length recommended.

Install a 90° elbow, and mark the exterior wall where the vent would pass through.

Cut a 10” (25.4 cm) minimum hole in the wall to maintain clearances to combustibles around vent pipe. Frame the hole as shown in Figure 32.

Install wall thimble, interior finished collar, the vent section through the wall, and then install the vent termination.

Seal around the termination using a non-hardening mastic.

Also refer to INITIAL INSTALLATION - VENT CONFIGURATIONS AND

RESTRICTOR SETTINGS and INITIAL INSTALLATION - HORIZONTAL

INSTALLATION.

Figure 47: Installation for Top Vented;

Horizontal Termination.

INSTALLATION OF TOP VENTED; VERTICAL TERMINATION:

Place the unit in place.

Drop a plumb bob from the ceiling to the center point of the flue outlet.

Cut a 10” (25.4 cm) hole in the ceiling and the roof. Refer to Figure 36.

Install the ceiling support and insulation guard.

Install the roof flashing. Ensure that the roof flashing is installed under the roofing material so that a watertight seal is created.

Install the flue pipe from the top of the unit through the roof.

Ensure that all flue pipe and unit maintain required clearances to combustibles.

Also

refer to

INITIAL

INSTALLATION

- VENT CONFIGURATIONS

AND

RESTRICTOR

SETTINGS

and INITIAL

INSTALLATION - VERTICAL

INSTALLATION.

 

 

 

Figure 48: Installation for Top Vented;

Vertical Termination.

28

Image 28
Contents Cara Safety Precautions GeneralTable of Contents Certified for installation from 0-4500 ft 0-1372 m Codes And ApprovalsSnorkel refer to ‘Converting Top Vented into Rear Vented’ Vented GAS Fireplace Heater Cara DV NG/LPGSpecifications Cara Exterior DimensionsFor Your Safety Read Before Operating Operating InstructionsCara Component Sound & Reason Maintenance And Service Pilot FlameNo substitute materials are allowed Check burner for proper operation Kit Parts List Conversion Kit InstallationOpen Flame When Testing for Leaks Initial Installation Qualified Installers onlyCathedral Ceiling Manufacturer Trade Name Nominal Sizes 4DSC Vent Termination Restrictions Top Flue Restrictor Installation 51mm at top, 11⁄2 38mm at sides, 11⁄2 38mm at bottom Wall Framing Hole forInstalling Horizontal Vent Termination Box up through the roof line. Galvanized Roof Pitch Minimum Height Feet Meters Follow installation steps 1 & 2 under Initial Do not interfere with the structural integrity of the walls Converting Top Vented into Rear Vented Installation for Top Vented Horizontal Termination Venturi Setting Natural Gas Propane Main BurnerManifold Pressure Min. Manifold PressureCanadian Installations Wire Size Max. LengthA. Installations Optional Blower Fan Installation Secondary Installation Log Placement of Rear Log ChunksLog Placement of Left Log Remove door to clean glass Addition the seven 7 small rocks. These can be To clean glass Trouble Shooting Problem Possible Cause SolutionParts List Reference Part Description NumberParts List Parts Diagram Warranty To the DealerWarranty Warranty Installation Data Sheet