Enviro Cara owner manual Follow installation steps 1 & 2 under Initial

Page 25

Initial Installation

QUALIFIED INSTALLERS ONLY

Figure 40: Multi-Story Vent Pipe Installation.

Figure 39: Use of Wall Straps.

CATHEDRAL CEILING INSTALLATION:

 

1. Follow installation steps 1 & 2 under INITIAL

 

INSTALLATION - VERTICAL INSTALLATION.

 

2. Using the plumb bob, mark the centerline of

 

the venting system on the ceiling and drill a

 

small hole through the ceiling and roof at this

 

point. From the roof, locate the drill hole and

 

mark the outline of the “Cathedral Ceiling

 

Support Box”.

 

3. Remove shingles or other roof coverings as

 

necessary to cut the rectangular hole for the

 

“Support Box”. Cut the hole 1⁄8” larger than

 

the “Support Box” outline.

 

4. Lower the “Support Box” through the hole in

 

the roof until the bottom of the “Support Box”

 

protrudes at least 2 inches (5 cm) below the

 

ceiling. Align the “Support Box” both vertically

 

and horizontally with a level as shown in

 

Figure 41 Temporarily tack the “Support Box”

 

in the place through the inside walls and into

Figure 41: Cathedral Ceiling Support Box Leveling.

the roof sheathing.

25

Image 25
Contents Cara General Safety PrecautionsTable of Contents Codes And Approvals Certified for installation from 0-4500 ft 0-1372 mSnorkel refer to ‘Converting Top Vented into Rear Vented’ Vented GAS Fireplace Heater Cara DV NG/LPGCara Exterior Dimensions SpecificationsOperating Instructions For Your Safety Read Before OperatingCara Component Sound & Reason Pilot Flame Maintenance And ServiceNo substitute materials are allowed Check burner for proper operation Conversion Kit Installation Kit Parts ListOpen Flame When Testing for Leaks Qualified Installers only Initial InstallationCathedral Ceiling Manufacturer Trade Name Nominal Sizes 4DSC Vent Termination Restrictions Top Flue Restrictor Installation Wall Framing Hole for 51mm at top, 11⁄2 38mm at sides, 11⁄2 38mm at bottomInstalling Horizontal Vent Termination Box up through the roof line. Galvanized Roof Pitch Minimum Height Feet Meters Follow installation steps 1 & 2 under Initial Do not interfere with the structural integrity of the walls Converting Top Vented into Rear Vented Installation for Top Vented Horizontal Termination Natural Gas Propane Main Burner Venturi SettingManifold Pressure Min. Manifold PressureCanadian Installations Wire Size Max. LengthA. Installations Optional Blower Fan Installation Log Placement of Rear Log Chunks Secondary InstallationLog Placement of Left Log Remove door to clean glass Addition the seven 7 small rocks. These can be To clean glass Problem Possible Cause Solution Trouble ShootingReference Part Description Number Parts ListParts List Parts Diagram To the Dealer WarrantyWarranty Warranty Installation Data Sheet