Enviro Cara owner manual Table of Contents

Page 3

Table of Contents

Safety Precautions

2

Table of Contents

3

Codes And Approvals

4

Specifications

5

 

Rating Label Location

5

 

Dimensions

5

Operating Instructions

6

 

Pilot Lighting Instructions

6

 

Air Shutter

7

 

Remote controls (Optional)

8

 

Blower Speed

8

 

Normal Sounds During Operation

8

Maintenance And Service

9

 

Routine Maintenance

9

 

Cleaning The Painted Surfaces

9

 

Check Pilot and Burner Flames

9

 

Glass Door Removal

9

 

Replacing the Glass

10

 

Cleaning The Firebox

10

 

Burner Removal & Installation

10

 

Firebox Baffle Removal

11

 

Fuel Conversion

12

Initial

Installation

14

 

Preparation For Installation

14

 

Clearances to Combustibles

14

 

Planning Your Installation

15

 

Approved Vent Parts

16

 

Vent Termination Restrictions

18

 

Vent Configurations and Restrictor Settings

19

 

Restrictor Installation

20

 

Horizontal Installation

20

 

Vertical Installation

22

 

Cathedral Ceiling Installation

25

 

Corner Installations

26

 

Installation of Rear Vented Appliance

27

 

Converting Top Vented into Rear Vented

27

 

Installation of Top Vented; Horizontal Termination

28

 

Installation of Top Vented; Vertical Termination

28

 

Gas Line Connection and Testing

29

 

Electrical Requirements For Gas Valve and Optional Blower

30

 

Installation of Optional Blower

31

Secondary Installation

32

 

Installation of Log Set

32

 

Installation of Rock Set

34

 

Installation of Ceramic Firebox Liner (Optional)

36

Trouble Shooting

37

Parts

List

38

Parts

List

39

Parts Diagram

40

Warranty

41

Installation Data Sheet

44

3

Image 3
Contents Cara General Safety PrecautionsTable of Contents Vented GAS Fireplace Heater Cara DV NG/LPG Certified for installation from 0-4500 ft 0-1372 mCodes And Approvals Snorkel refer to ‘Converting Top Vented into Rear Vented’Cara Exterior Dimensions SpecificationsOperating Instructions For Your Safety Read Before OperatingCara Component Sound & Reason Pilot Flame Maintenance And ServiceNo substitute materials are allowed Check burner for proper operation Conversion Kit Installation Kit Parts ListOpen Flame When Testing for Leaks Qualified Installers only Initial InstallationCathedral Ceiling Manufacturer Trade Name Nominal Sizes 4DSC Vent Termination Restrictions Top Flue Restrictor Installation Wall Framing Hole for 51mm at top, 11⁄2 38mm at sides, 11⁄2 38mm at bottomInstalling Horizontal Vent Termination Box up through the roof line. Galvanized Roof Pitch Minimum Height Feet Meters Follow installation steps 1 & 2 under Initial Do not interfere with the structural integrity of the walls Converting Top Vented into Rear Vented Installation for Top Vented Horizontal Termination Min. Manifold Pressure Venturi SettingNatural Gas Propane Main Burner Manifold PressureWire Size Max. Length Canadian InstallationsA. Installations Optional Blower Fan Installation Log Placement of Rear Log Chunks Secondary InstallationLog Placement of Left Log Remove door to clean glass Addition the seven 7 small rocks. These can be To clean glass Problem Possible Cause Solution Trouble ShootingReference Part Description Number Parts ListParts List Parts Diagram To the Dealer WarrantyWarranty Warranty Installation Data Sheet