Enviro Cara owner manual Installation Data Sheet

Page 44

Installation Data Sheet

The following information must be recorded by the installer for warranty purposes and future reference.

NAME OF OWNER:

_________________________________________

ADDRESS:

_________________________________________

_________________________________________

_________________________________________

PHONE:___________________________________

MODEL:___________________________________

SERIAL NUMBER:___________________________

DATE OF PURCHASE: _____________ (dd/mm/yyyy)

DATE OF INSTALLATION:___________(dd/mm/yyyy)

NATURAL GAS (NAT) PROPANE (LPG)

INLET GAS PRESSURE:_________in wc

MAIN BURNER ORIFICE:__________# DMS

PILOT ORIFICE #_________OR________in diam.

INSTALLER’S SIGNATURE:

_________________________________________

NAME OF DEALER:

_________________________________________

ADDRESS:

_________________________________________

_________________________________________

_________________________________________

PHONE:___________________________________

NAME OF INSTALLER:

_________________________________________

ADDRESS:

_________________________________________

_________________________________________

_________________________________________

PHONE:___________________________________

MANUFACTURED BY:

SHERWOOD INDUSTRIES LTD.

6782 OLDFIELD RD. SAANICHTON, BC, CANADA V8M 2A3

www.envirofire.biz

October 15, 2007

C-11436

44

Image 44
Contents Cara Safety Precautions GeneralTable of Contents Certified for installation from 0-4500 ft 0-1372 m Codes And ApprovalsSnorkel refer to ‘Converting Top Vented into Rear Vented’ Vented GAS Fireplace Heater Cara DV NG/LPGSpecifications Cara Exterior DimensionsFor Your Safety Read Before Operating Operating InstructionsCara Component Sound & Reason Maintenance And Service Pilot FlameNo substitute materials are allowed Check burner for proper operation Kit Parts List Conversion Kit InstallationOpen Flame When Testing for Leaks Initial Installation Qualified Installers onlyCathedral Ceiling Manufacturer Trade Name Nominal Sizes 4DSC Vent Termination Restrictions Top Flue Restrictor Installation 51mm at top, 11⁄2 38mm at sides, 11⁄2 38mm at bottom Wall Framing Hole forInstalling Horizontal Vent Termination Box up through the roof line. Galvanized Roof Pitch Minimum Height Feet Meters Follow installation steps 1 & 2 under Initial Do not interfere with the structural integrity of the walls Converting Top Vented into Rear Vented Installation for Top Vented Horizontal Termination Venturi Setting Natural Gas Propane Main BurnerManifold Pressure Min. Manifold PressureA. Installations Wire Size Max. LengthCanadian Installations Optional Blower Fan Installation Secondary Installation Log Placement of Rear Log ChunksLog Placement of Left Log Remove door to clean glass Addition the seven 7 small rocks. These can be To clean glass Trouble Shooting Problem Possible Cause SolutionParts List Reference Part Description NumberParts List Parts Diagram Warranty To the DealerWarranty Warranty Installation Data Sheet