Enviro Cara owner manual Optional Blower Fan Installation

Page 31

Initial Installation

INSTALLATION OF OPTIONAL BLOWER:

Figure 52: Optional Blower (Fan) Installation.

1.Remove the pre-assembled blower from the packaging. Inspect the blower for damage. If damage is noticed call your dealer, distributor or courier company and have components replaced.

2.Remove the side panel by pulling the panel up, slide the panel out of the bottom slots, and set aside.

3.Install the temperature sensor into the holder.

IMPORTANT: The temperature sensor must be in contact with the firebox.

4.Open the pedestal door and remove the four (4) T-20 screws holding the Control Panel in place.

5.Fit the Fan Unit into the cabinet being careful to work around the gas and pilot lines. The fan will fit up behind the gas valve. With an extension driver, fasten the Fan Unit in place with four (4) T-20 screws provided.

6.Install the Fan Controller into the provision in the Control Panel.

7.Install the Strain Relief plate into the stove back by fitting the tab on the plate into the stove back and secure the plate with a T-20 screw provided.

8.Plug in all the electrical connections as indicated in Figure 51. This includes the Fan Controller, Temperature sensor and Fan Unit.

9.Using the provided T-20 screw, located on the right mount below and behind the Temperature Sensor, fasten the wire tie supplied. With the wire tie capture the fan wires including the temperature switch wires, this will secure the wires and route them away from hot surfaces and out of the way of the fan blades

10.Re-install the Control Panel and Side Panel.

11.Plug the fan assembly into the wall outlet and turn the unit on to ensure fan operation.

31

Image 31
Contents Cara General Safety PrecautionsTable of Contents Vented GAS Fireplace Heater Cara DV NG/LPG Certified for installation from 0-4500 ft 0-1372 mCodes And Approvals Snorkel refer to ‘Converting Top Vented into Rear Vented’Cara Exterior Dimensions SpecificationsOperating Instructions For Your Safety Read Before OperatingCara Component Sound & Reason Pilot Flame Maintenance And ServiceNo substitute materials are allowed Check burner for proper operation Conversion Kit Installation Kit Parts ListOpen Flame When Testing for Leaks Qualified Installers only Initial InstallationCathedral Ceiling Manufacturer Trade Name Nominal Sizes 4DSC Vent Termination Restrictions Top Flue Restrictor Installation Wall Framing Hole for 51mm at top, 11⁄2 38mm at sides, 11⁄2 38mm at bottomInstalling Horizontal Vent Termination Box up through the roof line. Galvanized Roof Pitch Minimum Height Feet Meters Follow installation steps 1 & 2 under Initial Do not interfere with the structural integrity of the walls Converting Top Vented into Rear Vented Installation for Top Vented Horizontal Termination Min. Manifold Pressure Venturi SettingNatural Gas Propane Main Burner Manifold PressureCanadian Installations Wire Size Max. LengthA. Installations Optional Blower Fan Installation Log Placement of Rear Log Chunks Secondary InstallationLog Placement of Left Log Remove door to clean glass Addition the seven 7 small rocks. These can be To clean glass Problem Possible Cause Solution Trouble ShootingReference Part Description Number Parts ListParts List Parts Diagram To the Dealer WarrantyWarranty Warranty Installation Data Sheet