Enviro Cara 51mm at top, 11⁄2 38mm at sides, 11⁄2 38mm at bottom, Wall Framing Hole for

Page 21

Initial Installation

QUALIFIED INSTALLERS ONLY

the outside, on black pipe. They may be located by examining the inside of the female ends as shown in Figure 31.

Notes:

(a)Twist-lock procedure: four (4) indentations, located on the female end of the pipes and fittings, are designed to slide straight onto the male ends of adjacent pipes and fittings, by orienting the four pipe indentations so they match and slide into the four entry slots on the male end.

(b)Horizontal runs of vent pipe must be supported every 36” (915mm). Wall straps are available for this purpose, also when running horizontal pipe minimum clearances to combustibles must be maintained;

2” (51mm) at top, 11⁄2” (38mm) at sides, 11⁄2” (38mm) at bottom.

3. With the pipe attached to the stove in the correct location,

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

mark the wall for a 10” (25.4cm) x 10” (25.4 cm) square hole

 

 

10"

 

 

 

 

 

(refer to Figure 32). The center of the square hole should

 

 

 

 

 

 

(254mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

match the center line of the horizontal pipe. Cut and frame the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10” (25.4cm) x 10” (25.4cm) hole in the exterior wall where

 

 

 

 

 

 

 

 

 

 

 

 

 

the vent will be terminated. Refer to Figure 23 and Table 7. If

10"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

the wall being penetrated is constructed of non-combustible

(254mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

material i.e. masonry or concrete, a 7” (17.8cm) hole is

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

acceptable.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4. Position the horizontal vent termination in the center of the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10” (25.4cm) x 10” (25.4cm) hole, and attach to the exterior

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

wall with the four screws provided. Before attaching the vent

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

termination to the exterior wall, run a bead of non-hardening

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

mastic around the edges, so as to make a seal between the

 

 

 

 

 

 

 

 

 

 

 

 

 

termination and the wall. The arrow on the vent termination

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

should be pointing up, insure that the proper clearances to

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 32: Wall Framing Hole for

combustible materials are maintained.

5. Before connecting the horizontal run of the vent pipe to the

 

Horizontal Installation.

 

 

 

 

 

 

 

 

 

 

 

 

 

vent termination, slide the black decorative wall thimble cover over the vent pipe.

6.Slide the appliance and vent assembly towards the wall, carefully inserting the vent pipe into the cap assembly. It is important that the vent pipe extend into the vent cap a sufficient distance with a minimum of 11⁄4” (3.2cm) overlap. Secure the connection between the vent cap pipe and the vent cap

by attaching the two sheet metal straps extending from the vent cap assembly into the outer wall of the vent pipe. Use the two sheet metal screws provided to connect the straps to the vent pipe. Bend any remaining portion of the sheet metal straps back towards the vent cap, so the decorative wall thimble will conceal it (see left image in Figure 33).

11/4"

 

(3.2cm)

 

Fold strap

Woodscrews

here

 

Sheet metal

 

screws

 

 

Wall Thimble

 

Strap

Figure 33: Installing Decorative Wall Thimble.

21

Image 21
Contents Cara General Safety PrecautionsTable of Contents Codes And Approvals Certified for installation from 0-4500 ft 0-1372 mSnorkel refer to ‘Converting Top Vented into Rear Vented’ Vented GAS Fireplace Heater Cara DV NG/LPGCara Exterior Dimensions SpecificationsOperating Instructions For Your Safety Read Before OperatingCara Component Sound & Reason Pilot Flame Maintenance And ServiceNo substitute materials are allowed Check burner for proper operation Conversion Kit Installation Kit Parts ListOpen Flame When Testing for Leaks Qualified Installers only Initial InstallationCathedral Ceiling Manufacturer Trade Name Nominal Sizes 4DSC Vent Termination Restrictions Top Flue Restrictor Installation Wall Framing Hole for 51mm at top, 11⁄2 38mm at sides, 11⁄2 38mm at bottomInstalling Horizontal Vent Termination Box up through the roof line. Galvanized Roof Pitch Minimum Height Feet Meters Follow installation steps 1 & 2 under Initial Do not interfere with the structural integrity of the walls Converting Top Vented into Rear Vented Installation for Top Vented Horizontal Termination Natural Gas Propane Main Burner Venturi SettingManifold Pressure Min. Manifold PressureWire Size Max. Length Canadian InstallationsA. Installations Optional Blower Fan Installation Log Placement of Rear Log Chunks Secondary InstallationLog Placement of Left Log Remove door to clean glass Addition the seven 7 small rocks. These can be To clean glass Problem Possible Cause Solution Trouble ShootingReference Part Description Number Parts ListParts List Parts Diagram To the Dealer WarrantyWarranty Warranty Installation Data Sheet