Enviro Cara owner manual Vent Termination Restrictions

Page 18

Initial Installation

QUALIFIED INSTALLERS ONLY

VENT TERMINATION RESTRICTIONS:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

N

 

 

 

 

 

 

 

 

 

O

D

E

 

 

 

 

 

H

 

 

B

 

 

 

 

 

 

 

 

C

 

 

 

 

 

 

 

L

B

Fixed

 

 

B

 

 

 

G

F

Closed

Openable

Fixed

 

 

G

 

 

Openable

Closed

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

M

 

 

B

 

A

 

J

 

 

K

 

 

 

 

 

 

 

 

 

 

 

 

I

A

 

Termination Cap

 

Air Supply Inlet

 

 

 

 

G

Gas Meter

Restriction Zone

 

 

 

 

 

 

 

 

 

(Termination not allowed)

 

Figure 28: Vent Termination Restrictions, refer to Table 7.

Table 7: Vent termination clearances, refer to Figure 28.

Letter

Canadian Installation 1

US Installation2

Description

A

12 in (30 cm)

Clearance above grade, verandah, porch, deck, or balcony.

 

 

 

 

B

12 in (30 cm)

9 in (23 cm)

Clearance from window or door that may be opened.

 

 

 

 

C

12 in (30 cm)*

Clearance from permanently closed window (to prevent

 

 

 

condensation).

 

 

 

D

22-3/4 in (57.8 cm)*

Vertical clearance to ventilated soffit located above the

 

 

 

terminal, within a horizontal distance of 2 ft (60 cm) from

 

 

 

center line of terminal.

 

 

 

E

22-3/4 in (57.8 cm)*

Clearance to unventilated soffit.

 

 

 

F

12 in (30 cm)*

Clearance to outside corner.

 

 

 

G

18 in (45.7 cm)*

Clearance to inside corner.

 

 

 

 

H

3 ft (91 cm) within a height of

3 ft (91 cm) within a height of

Clearance to each side of center line extended above

 

15 ft (4.5 m) above the meter/

15 ft (4.5 m) above the meter/

meter/regulator assembly.

 

regulator assembly

regulator assembly*

 

 

 

 

 

I

3 ft (91 cm)

3 ft (91 cm)*

Radial clearance around service regulator vent outlet.

 

 

 

 

J

12 in (30 cm)

9 in (23 cm)

Clearance to non-mechanical air supply inlet to building, or

 

 

 

the combustion air inlet to any other appliance.

 

 

 

 

K

6 ft (1.83 m)

3 ft (91 cm) above if within 10

Clearance to mechanical air supply inlet.

 

 

ft (3 m) horizontally

 

 

 

 

 

L

7 ft (2.13 m)t

7 ft (2.13 m)*t

Clearance above paved sidewalk or paved driveway located

 

 

 

on public property.

 

 

 

 

M

12 in / 30 cm+

12 in / 30 cm*+

Clearance under verandah, porch, deck, or balcony.

N

12 in (30 cm)*

Clearance horizontally to any surface (such as an exterior

 

 

 

wall) for vertical terminations.

 

 

 

O

12 in (30 cm)

Clearance above roof line for vertical terminations.

 

 

 

 

1In accordance with the current CSA B149, Natural Gas and Propane Installation Code.

2 In accordance with the current ANSI Z223.1 NFPA 54, National Fuel Gas Code.

* These numbers are only estimates. Clearance in accordance with installation codes and the requirements of the gas supplier.

t A vent shall not terminate directly above a side walk or paved driveway that is located between two single family dwellings and it serves both dwellings. + Permitted only if verandah, porch, deck, or balcony is fully open on a minimum of two sides beneath the floor.

NOTE: Venting terminals shall not be recessed into walls or siding.

18

Image 18
Contents Cara Safety Precautions GeneralTable of Contents Snorkel refer to ‘Converting Top Vented into Rear Vented’ Certified for installation from 0-4500 ft 0-1372 mCodes And Approvals Vented GAS Fireplace Heater Cara DV NG/LPGSpecifications Cara Exterior DimensionsFor Your Safety Read Before Operating Operating InstructionsCara Component Sound & Reason Maintenance And Service Pilot FlameNo substitute materials are allowed Check burner for proper operation Kit Parts List Conversion Kit InstallationOpen Flame When Testing for Leaks Initial Installation Qualified Installers onlyCathedral Ceiling Manufacturer Trade Name Nominal Sizes 4DSC Vent Termination Restrictions Top Flue Restrictor Installation 51mm at top, 11⁄2 38mm at sides, 11⁄2 38mm at bottom Wall Framing Hole forInstalling Horizontal Vent Termination Box up through the roof line. Galvanized Roof Pitch Minimum Height Feet Meters Follow installation steps 1 & 2 under Initial Do not interfere with the structural integrity of the walls Converting Top Vented into Rear Vented Installation for Top Vented Horizontal Termination Manifold Pressure Venturi SettingNatural Gas Propane Main Burner Min. Manifold PressureWire Size Max. Length Canadian InstallationsA. Installations Optional Blower Fan Installation Secondary Installation Log Placement of Rear Log ChunksLog Placement of Left Log Remove door to clean glass Addition the seven 7 small rocks. These can be To clean glass Trouble Shooting Problem Possible Cause SolutionParts List Reference Part Description NumberParts List Parts Diagram Warranty To the DealerWarranty Warranty Installation Data Sheet