Enviro Cara owner manual Remove door to clean glass

Page 34

Secondary Installation

CAUTION: NEVER OPERATE THIS APPLIANCE WITH THE GLASS DOOR REMOVED.

Important note: When the unit is turned on for the first time, it should be turned onto high without the fan on for the first four (4) hours. This will cure the paint, logs, gasket material and the other products used in the manufacturing process. It is advisable to open a window or door, as the unit will start to smoke and can irritate some people. After the unit has gone through the first burn turn the unit off including the pilot, let the unit get cold then remove the glass door and clean it with a good gas fireplace glass cleaner, available at your local ENVIRO dealer.

See MAINTENANCE AND SERVICE on how to

remove door to clean glass.

Figure 59: Cara DR with a Good Flame.

INSTALLATION OF ROCK SET:

If the rocks are positioned incorrectly, the flames can be “pinched” and will not burn correctly. If the rocks are broken due to handling or shipping, replace the rocks with new ones. Using the pictures provided, carefully set the rocks in place.

NOTE: The rocks are fragile, particularly after usage. Please handle with due care during servicing.

1.Carefully remove rocks from box and check there is no damage. It is very important to install all rocks in their proper position to ensure safe, optimum operating conditions.

2.Place the rock cluster onto the burner. There are two (2) pins on the back of the burner and two (2) holes in the bottom of the rock cluster (refer to Figures 60 & 61).

Figure 60: Installation of Rock Cluster.

34

Image 34
Contents Cara Safety Precautions GeneralTable of Contents Snorkel refer to ‘Converting Top Vented into Rear Vented’ Certified for installation from 0-4500 ft 0-1372 mCodes And Approvals Vented GAS Fireplace Heater Cara DV NG/LPGSpecifications Cara Exterior DimensionsFor Your Safety Read Before Operating Operating InstructionsCara Component Sound & Reason Maintenance And Service Pilot FlameNo substitute materials are allowed Check burner for proper operation Kit Parts List Conversion Kit InstallationOpen Flame When Testing for Leaks Initial Installation Qualified Installers onlyCathedral Ceiling Manufacturer Trade Name Nominal Sizes 4DSC Vent Termination Restrictions Top Flue Restrictor Installation 51mm at top, 11⁄2 38mm at sides, 11⁄2 38mm at bottom Wall Framing Hole forInstalling Horizontal Vent Termination Box up through the roof line. Galvanized Roof Pitch Minimum Height Feet Meters Follow installation steps 1 & 2 under Initial Do not interfere with the structural integrity of the walls Converting Top Vented into Rear Vented Installation for Top Vented Horizontal Termination Manifold Pressure Venturi SettingNatural Gas Propane Main Burner Min. Manifold PressureCanadian Installations Wire Size Max. LengthA. Installations Optional Blower Fan Installation Secondary Installation Log Placement of Rear Log ChunksLog Placement of Left Log Remove door to clean glass Addition the seven 7 small rocks. These can be To clean glass Trouble Shooting Problem Possible Cause SolutionParts List Reference Part Description NumberParts List Parts Diagram Warranty To the DealerWarranty Warranty Installation Data Sheet