Enviro Cara owner manual Converting Top Vented into Rear Vented

Page 27

Initial Installation

QUALIFIED INSTALLERS ONLY

CONVERTING TOP VENTED INTO REAR VENTED:

This unit has been shipped as a 33,500 Btu/hr top-vented freestanding unit. This unit can be converted

to a rear vented unit for use with a 36” (915

mm)snorkel. Also refer to INITIAL INSTALLATION

- INSTALLATION OF REAR VENTED APPLIANCE.

1.Carefully remove the trivet and the stovetop. Place on a soft surface as not to damage the finish.

2.Remove the four (4) 1⁄4” screws that hold the flue collar elbow to the unit body.

3.Carefully remove the elbow being sure not to damage the gasket that is glued to the flue collar elbow, it seals the flue to the firebox (see Figure 42).

4.Turn the elbow 180° to the rear vent position and re-fasten with the screws removed in step 2.

INSTALLATION OF REAR VENTED APPLIANCE:

Figure 45: Converting Top Vented into Rear Vented.

Place the unit into position.

Attach a small section of pipe on the unit and mark exterior wall where vent would pass through the wall.

Cut a 10” (25.4 cm) minimum hole in the wall to maintain clearances to combustibles. Frame hole as shown in Figure 32.

Install a wall thimble, interior finished collar, and the vent section through the wall.

THIS UNIT MUST BE VENTED WITH A 36” (91 cm) SNORKEL KIT.

Seal around the vent terminal to the structure using a non- hardening mastic.

Also refer to INITIAL INSTALLATION - VENT CONFIGURATIONS AND

RESTRICTOR SETTINGS and INITIAL INSTALLATION - HORIZONTAL

INSTALLATION.

Figure 46: Installation for Rear Vented;

33,500 Btu/hr.

27

Image 27
Contents Cara General Safety PrecautionsTable of Contents Vented GAS Fireplace Heater Cara DV NG/LPG Certified for installation from 0-4500 ft 0-1372 mCodes And Approvals Snorkel refer to ‘Converting Top Vented into Rear Vented’Cara Exterior Dimensions SpecificationsOperating Instructions For Your Safety Read Before OperatingCara Component Sound & Reason Pilot Flame Maintenance And ServiceNo substitute materials are allowed Check burner for proper operation Conversion Kit Installation Kit Parts ListOpen Flame When Testing for Leaks Qualified Installers only Initial InstallationCathedral Ceiling Manufacturer Trade Name Nominal Sizes 4DSC Vent Termination Restrictions Top Flue Restrictor Installation Wall Framing Hole for 51mm at top, 11⁄2 38mm at sides, 11⁄2 38mm at bottomInstalling Horizontal Vent Termination Box up through the roof line. Galvanized Roof Pitch Minimum Height Feet Meters Follow installation steps 1 & 2 under Initial Do not interfere with the structural integrity of the walls Converting Top Vented into Rear Vented Installation for Top Vented Horizontal Termination Min. Manifold Pressure Venturi SettingNatural Gas Propane Main Burner Manifold PressureWire Size Max. Length Canadian InstallationsA. Installations Optional Blower Fan Installation Log Placement of Rear Log Chunks Secondary InstallationLog Placement of Left Log Remove door to clean glass Addition the seven 7 small rocks. These can be To clean glass Problem Possible Cause Solution Trouble ShootingReference Part Description Number Parts ListParts List Parts Diagram To the Dealer WarrantyWarranty Warranty Installation Data Sheet