Page 23

Initial Installation

QUALIFIED INSTALLERS ONLY

3.To install the Round Support Box/Wall Thimble in a flat ceiling, cut a 10” square hole in the ceiling, centered in the hole drilled in Step 2. Frame the hole as shown in Figure 36.

4. Assemble the desired lengths of black pipe and elbows necessary to reach from the appliance adapter up through the Round Support Box. Insure that all pipe and elbow connections are in their fully twist- locked position.

5.Cut hole in the roof centered on the small

hole placed in the roof from Step 2. The hole should be of sufficient size to meet minimum requirements for Clearance to Combustibles, as specified. Continue to assemble lengths of pipe and elbows necessary to reach from the ceiling support

box up through the roof line. Galvanized

Figure 36: Wall Framing for Hole for Vertical Installation.

pipe and elbows may be utilized in the

 

attic, as well as above the roof line. The galvanized finish is desirable above the roof line, due to the higher corrosion resistance.

6.Once the pipe sections have been joined, and run up through the hole in the roof, slip an elbow strap over the exposed sections, bend the support straps outwards, and push the elbow strap down to the roof level, as shown in Figure 34. Tighten the clamp around the pipe section. Use a level to make sure the pipe is truly vertical. With roofing nails, secure the support straps to the roof. Seal the nails holes

heads with non-hardening mastic. Trim the excess length of the support straps that extend out beyond the edge of the flashing.

7.Slip the flashing over the pipe section protruding through the roof. Secure the base of the flashing to the roof with roofing nails. Use a non-hardening sealant between the uphill edge of the flashing and the roof. Insure the roofing material overlaps the top edge of the flashing as shown in Figure 37. Verify that you have at least the minimum clearance to combustibles at the roof line.

 

Vertical

 

Termination

Elbow Strap

Storm Collar

 

Flashing

 

Roofing nails

Figure 37: Vertical Vent Termination Installation.

 

23

Image 23
Contents Cara General Safety PrecautionsTable of Contents Vented GAS Fireplace Heater Cara DV NG/LPG Certified for installation from 0-4500 ft 0-1372 mCodes And Approvals Snorkel refer to ‘Converting Top Vented into Rear Vented’Cara Exterior Dimensions SpecificationsOperating Instructions For Your Safety Read Before OperatingCara Component Sound & Reason Pilot Flame Maintenance And ServiceNo substitute materials are allowed Check burner for proper operation Conversion Kit Installation Kit Parts ListOpen Flame When Testing for Leaks Qualified Installers only Initial InstallationCathedral Ceiling Manufacturer Trade Name Nominal Sizes 4DSC Vent Termination Restrictions Top Flue Restrictor Installation Wall Framing Hole for 51mm at top, 11⁄2 38mm at sides, 11⁄2 38mm at bottomInstalling Horizontal Vent Termination Box up through the roof line. Galvanized Roof Pitch Minimum Height Feet Meters Follow installation steps 1 & 2 under Initial Do not interfere with the structural integrity of the walls Converting Top Vented into Rear Vented Installation for Top Vented Horizontal Termination Min. Manifold Pressure Venturi SettingNatural Gas Propane Main Burner Manifold PressureA. Installations Wire Size Max. LengthCanadian Installations Optional Blower Fan Installation Log Placement of Rear Log Chunks Secondary InstallationLog Placement of Left Log Remove door to clean glass Addition the seven 7 small rocks. These can be To clean glass Problem Possible Cause Solution Trouble ShootingReference Part Description Number Parts ListParts List Parts Diagram To the Dealer WarrantyWarranty Warranty Installation Data Sheet