MOBILE HOME INSTALLATION
CAUTION: DO NOT INSTALL STOVE IN SLEEPING ROOM
THE STRUCTURAL INTEGRITY OF THE MANUFACTURED HOME FLOOR,
CEILING and ROOF MUST BE MAINTAINED!
Your Glow Boy appliance has been tested and listed for mobile home installation. It may be installed in a mobile home as a "Free Standing Stove" or a "Hearth Stove", see detailed install and clearance requirements in these sections as they imply there.
In addition to all previously detailed installation requirements, mobile home
Permanently bolt your stove to the floor, (A), figure 25.
Electrically ground your stove or the pedestal to the steel frame of the home. Use a number 8 gauge copper wire, (B), figure 25, or equivalent.
The stove must have a permanent outside air source with a ¼ inch screen over the inlet. Figure 26, (B, C & D)
For transportation all chimney/vent above the mobile home must be removed.
Chimney/PL Vent must be 3” or 4” PL Vent and must extend a minimum or 36” above the roofline of the mobile home and must be installed using a UL / ULC listed ceiling fire stop (J), figure 26, and rain cap (L), figure 26., when installing as a vertical run. See diagram below.
REFER TO THE VENTING DIAGRAMS IN THIS MANUAL FOR FURTHER EXHUAST CONFIGURATIONS.
INSTALL VENT AT CLEARANCES SPECIFIED BY THE VENT MANUFACTURER.
A | Floor Pad |
B | Combustion Air Intake |
C | Fresh Air Duct |
D | Fresh Air Hood |
E | Stove Exhaust |
F | Pipe Adapter |
|
|
G | Clean Out Tee |
H | Tee Support Bracket |
I | Pipe |
J | Firestop Spacer / Ceiling Support |
K | Roof Flashing / Storm Collar |
L | Rain Cap |
HEARTH PAD
L
K
J
I
H |
G |
FLOOR
A BOLT(S)
B | C | D |
|
|
B GROUND FRAME
WIRE
Figure 25
A
Figure 26
Note: When moving your mobile home, all exterior venting must be removed. Upon completion of relocation, all venting must be reinstalled, gas tight, and securely fastened.
Glow Boy Pellet & Biomass | www.glowboystoves.com | 18 |
|
| 18 |
|
|
|