Switch module
SBCE unit
O |
|
K! |
|
2G TX |
|
RX | ! |
| 0 |
| F |
| C |
| 15 |
2 |
|
G TX | ! |
RX |
Release lever
| O |
|
|
| K! |
|
|
|
| LI |
|
|
| NK | |
|
| 1 |
|
|
| T |
|
|
| X/R | X |
|
| LI | |
|
| NK | |
|
| 2 |
|
|
| T |
|
|
| X/R | X |
|
| LI | |
|
| NK | |
|
| 3 |
|
|
| T |
|
|
| X/R | X |
|
| LI | |
|
| NK | |
|
| 4 |
|
| 00 | TX/ |
|
| 055 | RX | |
| D89 |
| |
|
| A1 |
|
|
| 44 |
|
O |
|
|
|
K! |
|
|
|
| O |
|
|
| K! |
|
|
2G TX |
|
|
|
RX | ! |
|
|
|
| LI |
|
|
| NK | |
| 0 | 1 |
|
| T |
| |
|
| X/R | X |
|
| LI | |
| F | NK | |
| 2 |
| |
| C |
| |
|
| T |
|
| 15 | X/R | X |
| LI | ||
| NK | ||
2 |
| 3 |
|
G TX |
| TX/ |
|
RX | ! | RX | |
LI |
| ||
|
| NK | |
|
| 4 |
|
| 00 | TX/ |
|
| 055 | RX | |
| D89 |
| |
|
| A1 |
|
|
| 44 |
AC DC
AC DC
Figure 6. Installing a switch module.
11.Raise the release lever until it moves to the upright (closed) position. This locks the switch module in the SBCE unit.
✏NOTE
The switch module takes approximately 60 seconds to complete the
✏NOTE
To maintain proper airflow, make sure that the ventilation areas on the sides of the switch module are not blocked.
12.Make sure that the LEDs on the switch module indicate that it is operating correctly. Make sure that:
•When the POST starts, the green OK LED on the switch module is flashing. The POST tests the condition of firmware, memory, data paths, and switch logic and uses the fault LED to indicate pass or fail conditions.
•The green OK LED on the switch module stops flashing to indicate that the switch logic has completed POST.
13.If you have a second switch module to install, repeat step 5 on page 14 through step 12; otherwise, go to step 14.
14.If you are using the external
16 | Brocade SAN Switch Module: Installation Guide |