Bradford-White Corp EF operation manual Typical Horizontal Direct Vent System

Page 23

2.Use the proper PVC cement to secure the exhaust vent and air intake terminals provided with the water heater to the plastic pipes. The distance between the back edge of the exhaust vent terminal and the exterior wall (see Figure 13) must be 6 inches (15.2 cm) more for the exhaust vent terminal than the air intake terminal. Use the proper cement or sealant and assembly procedures to secure the vent connector joints between the terminal and the blower outlet. Provide support brackets for every 3 feet (.91 m) of horizontal vent beyond the intake terminal.

Figure 13. Typical Horizontal Direct Vent System

Vertical Installation:

Vertical venting system must be supported every 5 feet (1.5 m) of vertical run and every 3 feet (.9 m) of horizontal run of vent pipe length.

CAUTION

Failure to properly support the vent piping with hangers and clamps may result in damage to the water heater or venting system.

Stress levels in the pipe and fittings can be significantly increased by improper installation. If rigid pipe clamps are used to hold the pipe in place, or if the pipe cannot move freely through a wall penetration, the pipe may be directly stressed, or high thermal stresses may be formed when the pipe heats up and expands. Install accordingly to minimize such stresses.

Follow the following procedure to vent through the roof:

1.Cut the necessary holes through the roof and ceiling

2.Install the exhaust vent and air intake plastic pipes as shown in Figure 14. Make sure that the installation meets the local codes and/or The National Fuel Gas Code ANSI Z223.1 (Latest Edition) or CGA/CAN B149 Installation Code.

23

Image 23
Contents What to do if YOU Smell GAS With Troubleshooting GuideTable of Contents Page Do not Operate the Appliance Until the Leakage is Corrected If YOU Smell GASDimensions Inches Section II SpecificationsSection III General Information FeaturesTemperature and Pressure Relief Valve Condensate Elbow With Trap Dishwashing Machine RequirementsSection IV Installation Instructions Minimum Clearance To Combustible Material UnpackingRemove Crate Recommended Minimum Clearances For Service AccessUnconfined Space LocationAIR Requirements Mechanical Exhausting of Room AIRChemical Vapor Corrosion Typical Installation IllustrationTypical Two Water Heater Connection Scalding Section V Water ConnectionsInstructions for Connections Alternate Space Heating Water Connections Approximate TIME/TEMPERATURE Relationships in ScaldsSection VI Venting Approved Venting Materials Venting Direct Vent Installation Canadian US Installations2 Installations1 Clearance above Direct Vent Terminal Clearances Page Typical Horizontal Direct Vent System Typical Vertical Direct Vent System Installation Determining required vent length Power Vent InstallationPage Typical Horizontal Power Vent System Typical Vertical Power Vent System Installation Power Vent Maximum Vent Length Multiple INTAKE/EXHAUST Terminal Separation Distances Dimensional Layout of Concentric Vent Kit Concentric Vent Terminal Installation ProcedureRain Cap to Small Vent Pipe Ass’y Concentric Vent Side Wall Attachment Vent Pipe Preparation ModelsSelection of Materials Section VII GAS ConnectionsInitial Preparation GAS Pressure Regulation GAS Meter Size Natural Gases onlySection Viii Electrical Connections Wiring Diagram and SchematicSequence of Operation Section IX Operating InstructionsGeneral Instructions To Fill the Water HeaterLighting Instructions Temperature AdjustmentSight Glass Location Burner Flame CheckFlushing Water Heater Section X MaintenanceMaintenance Schedule GeneralSediment and Lime Scale Removal Draining Water HeaterFilling Water Heater To inspect or replace an anode Anode Inspection and ReplacementVent and AIR Intake System Drain Valve and Tank Access PanelCombustion System Inspection Section XI Troubleshooting GuideEF Series Water Heater Section XII Parts ListCombustion Surround Assy Ignition Control Assy