Figure 16. Typical Horizontal Power Vent System
Vertical Installation:
Vertical venting must be supported every 5 feet (1.5 m) of vertical run and every 3 feet (.9 m) of horizontal run of vent pipe length.
Stress levels in the pipe and fittings can be significantly increased by improper installation. If rigid pipe clamps are used to hold the pipe in place, or if the pipe cannot move freely through a wall penetration, the pipe may be directly stressed, or high thermal stresses may be formed when the pipe heats up and expands. Install accordingly to minimize such stresses.
CAUTION
Failure to properly support the vent piping with hangers and clamps may result in damage to the water heater or venting system.
27