Bradford-White Corp EF Drain Valve and Tank Access Panel, Vent and AIR Intake System

Page 44

Figure 28. Powered Anode locations

DRAIN VALVE AND TANK ACCESS PANEL

The water heaters are equipped with a ¾ inch (1.9 cm) inch drain valve.

An access panel covers the cleanout opening in the tank, which is sealed by a gasket and cover. RELIEF VALVE

At least twice a year, the temperature and pressure relief valve should be checked to ensure that it is in operating condition. To check the relief valve, lift the lever at the end of the valve several times. The valve should seat properly and operate freely.

If water does not flow, remove and inspect for obstructions or corrosion. Replace with a new valve of the recommended size as necessary. A thorough inspection of the valve should be performed at least every three years by removing the temperature and relief valve from the tank. Do not attempt to repair the valve, as this could result in improper operation and a tank explosion. In areas with poor water conditions, it may be necessary to inspect the T&P valve more often than the recommended maintenance schedule

CAUTION

Before manually operating the valve, make sure that a drain line has been attached to the valve to direct the discharge to an open drain. Failure to take this precaution could mean contact with extremely hot water passing out the valve during this checking operation.

If the temperature and pressure relief valve on the water heater discharges periodically or continuously, it may be due to thermal expansion of water in a closed water supply system, or, it may be due to a faulty relief valve.

Thermal expansion is the normal response of water when it is heated. In a closed system, thermal expansion will cause the system pressure to build until the relief valve actuation pressure is equaled. Then, the relief valve will open, allowing some water to escape, slightly lowering the pressure.

Contact your water supplier or local plumbing inspector on how to control this situation.

WARNING

Above all, do not plug the temperature and pressure relief valve. This is not a solution and can create a hazardous situation.

VENT AND AIR INTAKE SYSTEM

Examine the vent and air intake system every 3 months. Points of inspection are as follows:

1.Check for obstructions and/or deterioration of vent piping and vent terminal. Replace immediately where needed.

2.Vent pipe and vent terminal screen should be cleaned of any foreign material. The screen is located inside the vent terminal outlet and is accessible from the outside of the vent terminal elbow. Do not reach inside the vent terminal when the water heater is in operation.

3.Check all venting system connections for leakage and reseal as required.

44

Image 44
Contents With Troubleshooting Guide What to do if YOU Smell GASTable of Contents Page If YOU Smell GAS Do not Operate the Appliance Until the Leakage is CorrectedSection II Specifications Dimensions InchesFeatures Section III General InformationTemperature and Pressure Relief Valve Dishwashing Machine Requirements Condensate Elbow With TrapSection IV Installation Instructions Unpacking Minimum Clearance To Combustible MaterialRecommended Minimum Clearances For Service Access Remove CrateLocation AIR RequirementsMechanical Exhausting of Room AIR Unconfined SpaceTypical Installation Illustration Chemical Vapor CorrosionTypical Two Water Heater Connection Scalding Section V Water ConnectionsInstructions for Connections Approximate TIME/TEMPERATURE Relationships in Scalds Alternate Space Heating Water ConnectionsSection VI Venting Approved Venting Materials Direct Vent Installation VentingCanadian US Installations2 Installations1 Clearance above Direct Vent Terminal Clearances Page Typical Horizontal Direct Vent System Typical Vertical Direct Vent System Installation Power Vent Installation Determining required vent lengthPage Typical Horizontal Power Vent System Typical Vertical Power Vent System Installation Power Vent Maximum Vent Length Multiple INTAKE/EXHAUST Terminal Separation Distances Concentric Vent Terminal Installation Procedure Dimensional Layout of Concentric Vent KitRain Cap to Small Vent Pipe Ass’y Concentric Vent Side Wall Attachment Models Vent Pipe PreparationSelection of Materials Section VII GAS ConnectionsInitial Preparation GAS Meter Size Natural Gases only GAS Pressure RegulationWiring Diagram and Schematic Section Viii Electrical ConnectionsSection IX Operating Instructions General InstructionsTo Fill the Water Heater Sequence of OperationTemperature Adjustment Lighting InstructionsBurner Flame Check Sight Glass Location Section X Maintenance Maintenance Schedule General Flushing Water HeaterSediment and Lime Scale Removal Draining Water HeaterFilling Water Heater Anode Inspection and Replacement To inspect or replace an anodeDrain Valve and Tank Access Panel Vent and AIR Intake SystemSection XI Troubleshooting Guide Combustion System InspectionSection XII Parts List EF Series Water HeaterCombustion Surround Assy Ignition Control Assy