American Water Heater 1010 319869-000 warranty Valve and Pipe Insulation if supplied

Page 20

The temperature-pressure relief valve must be installed directly into the fitting of the water heater designed for the relief valve. Must terminate a maximum of 6 in. (15cm) above a floor drain or external to the building. In cold climates, it is recommended that the discharge pipe be terminated at an adequate drain inside the building. Be certain that no contact is made with any live electrical part. The discharge opening must not be blocked or reduced in size under any circumstances. Excessive length, over 30 ft. (9.14m), or use of more than four elbows can cause restriction and reduce the discharge capacity of the valve (see Figures 3 & 19).

No valve or other obstruction is to be placed between the relief valve and the tank. Do not connect tubing directly to discharge drain unless a 6 in. (15cm) air gap is provided. To prevent bodily injury, hazard to life, or property damage, the relief valve must be allowed to discharge water in quantities should circumstances demand. If the discharge pipe is not connected to a drain or other suitable means, the water flow may cause property damage.

The Discharge Pipe:

Shall not be smaller in size than the outlet pipe size of the valve, or have any reducing couplings or other restrictions.

Shall not be plugged or blocked.

Shall be of material listed for hot water distribution.

Shall be installed so as to allow complete drainage of both the temperature-pressure relief valve, and the discharge pipe.

Shall terminate a maximum of 6 in. (15cm) above a floor drain or external to the building. In cold climates, it is recommended that the discharge line be terminated at an adequate drain inside the building.

Shall not have any valve between the relief valve and tank.

The temperature-pressure relief valve must be manually operated at least once a year, (see Figure 17). Caution should be taken to ensure that (1) no one is in front of or around the outlet of the temperature-pressure relief valve discharge line, and (2) the water manually discharged will not cause any bodily injury or property damage because the water may be extremely hot.

FIGURE 17

If after manually operating the valve, it fails to completely reset and continues to release water, immediately close the cold water inlet to the water heater, follow the draining instructions, and replace the temperature-pressure relief valve with a new one.

T&P Valve and Pipe Insulation (if supplied)

Remove insulation for T&P valve and pipe connections from carton.

FIGURE 18

Fit pipe insulation over the incoming cold water line and the hot water line. Make sure that the insulation is against the top cover of the heater. Fit T&P valve insulation over valve. Make sure that the insulation does not interfere with the lever of the T&P valve.

Secure all insulation using tape.

20

www.americanwaterheater.com

Image 20
Contents Power Vent GAS Models AN Odorant is Added to the GAS Used By this Water HeaterTable of Contents Safe INSTALLATION, USE and Service Important DefinitionsGeneral Safety Can be triggered at any time Preparing for the Installation IntroductionPage Operation Replacement Parts and Deliming ProductsGET to Know Your Water Heater GAS Models Installation Considerations Rough in DimensionsDirectly BELOW. Keep Clear of ALL Obstructions Water Piping Mixing Valve Usage Suggested Piping Arrangement For TOP ConnectionsWater Potable Heating All models are considered Hotter Water can ScaldFacts to Consider about Location Handle Installation Earthquake Zones Page Appliances in Confined Spaces Combustion AIR and VentilationAppliances in Unconfined Spaces ALL AIR from Outdoors See Figures 12, 13 Chemical Vapor Corrosion Water PipingClosed Water Systems Thermal ExpansionTEMPERATURE-PRESSURE Relief Valve Hard WaterValve and Pipe Insulation if supplied GAS Piping High Altitude Installations GAS Line PurgingFLOODING/FREEZING Filling the Water HeaterVent Pipe Termination Planning the Vent SystemIf using 2 inch vent pipe If using 3 inch vent pipeInstallation of Vent System Vent Terminal INSTALLATION, SidewallCondensate Masonry Side WallsVent terminals supplied with heater must be used Sequence of InstallationsInstallation Sequence Installation of Vent SYSTEM, Sidewall Installation of Vertical Vent SystemSelection of Materials Vent Pipe PreparationInitial Preparation Step B Recommended BRUSH* Size for Primer Cement ApplicationsStep a Step G Connection to Vent Pipe Step EStep F Power Vent Calibration Electrical ConnectionsFilling the Water Heater Operating Instructions Display PanelPage MCU For Your Safety Read Before Lighting Lighting InstructionsHeat Cycle Definitions State Description Temperature Regulation Unique Hybrid Features Temperature ProbesPage Temperature Regulation Operational Conditions Constant Output Temperature ControlStart UP Conditions Maintenance Motors Cleaning the Inlet Water Filter Cleaning the Heat EngineSnow Accumulation Flushing the Heat Exchanger Lime BUILD- UPFault Indication and Error Codes Draining the TankCode Display Example Format Diagnostic DisplayRemarks Fault Lockout Code Description Cause Remedy Type Displayed Fault Lockout Code Description Cause Remedy Type Displayed Fault Lockout Code Description Cause Remedy Type Displayed Troubleshooting When the TAP is Opened There is no HOT Water orHOT Water Turns Cold Stays ColdService Leakage CheckpointsParts Identification Item # Description AB C DEF KIT # Replacement Parts DescriptionNIP/DIP/TBO/HT Service and Labor Responsibility Claim ProcedureConditions and Exceptions Limitation on Implied WarrantiesPage