American Water Heater 1010 319869-000 warranty Earthquake Zones

Page 14

When installing the heater, consideration must be given to proper location. Location selected should be as close to the wall as practicable and as centralized with the water piping system as possible.

FIGURE 5

Minimum clearances between the water heater and combustible construction are 0 in. at the sides and rear, 0 in. (0cm) from the front and 2 in. (5.08cm) from the top (see Figure 5). If clearances stated on the heater differ from these distances, install water heater according to clearances stated on the heater.

Adequate top clearance of 24 in. (61cm) for servicing this appliance, such as changing the anodes etc., should be considered before installation.

A minimum front clearance of 20 in. (51cm) and 10 in. (26cm) of side clearance must be allowed for access to replaceable parts.

EARTHQUAKE ZONES

In Earthquake Zones the water heater must be braced, anchored, or strapped to avoid moving during an earthquake. Contact local utilities for code requirements in your area. The Spacemaker® TSE25 Bear Claw™ Water Heater Strap is suitable for bracing the Hybrid water heater. Follow the manufacturer’s instructions for installing the braces. Be sure to wear protective goggles and gloves when handling any kind of sheet metal product.

Tabs have been provided on each side of the rear portion of the shroud. The top and bottom of each tab must be cut and gently bent “inwards” thus allowing the straps to exit the shroud (see Figure 9).

In order to access the tabs and install the earthquake straps it is necessary to remove the top, front and side panels of the shroud as follows (see Figures 6 - 8):

Door opening

1.Unlock the door by rotating the lock counter-clockwise with a wide, slot screwdriver.

2.Release the top and bottom door pins by prying the pins out, using a small screwdriver.

3.Open the door (the door remains fastened to the left side panel).

Remove the top casing (front).

1.Use a screwdriver to remove the six screws securing the top casing.

2.Lift up and remove casing top (front).

Remove the right side panel

1.Use a screwdriver to remove the screw from the bottom, front of the right side panel.

2.Remove the three screws from the right side panel towards the rear of the unit.

3.Remove the screw from the top of the unit.

4.Push the panel back and lift out.

Remove the left side panel

1.Use a screwdriver to remove the screw from the bottom, front of the left side panel.

2.Remove the three screws from the left side panel towards the rear of the unit.

3.Remove the screw from the top of the unit.

4.Push the panel back and lift out.

Top Casing

Access To

(Front)

Door Pins

 

Door

Lock

Screws

FIGURE 6

14

www.americanwaterheater.com

Image 14
Contents Power Vent GAS Models AN Odorant is Added to the GAS Used By this Water HeaterTable of Contents Safe INSTALLATION, USE and Service Important DefinitionsGeneral Safety Can be triggered at any time Preparing for the Installation IntroductionPage Operation Replacement Parts and Deliming ProductsGET to Know Your Water Heater GAS Models Installation Considerations Rough in DimensionsDirectly BELOW. Keep Clear of ALL Obstructions Water Potable Heating All models are considered Water Piping Mixing Valve UsageSuggested Piping Arrangement For TOP Connections Hotter Water can ScaldFacts to Consider about Location Handle Installation Earthquake Zones Page Appliances in Confined Spaces Combustion AIR and VentilationAppliances in Unconfined Spaces ALL AIR from Outdoors See Figures 12, 13 Closed Water Systems Chemical Vapor CorrosionWater Piping Thermal ExpansionTEMPERATURE-PRESSURE Relief Valve Hard WaterValve and Pipe Insulation if supplied GAS Piping FLOODING/FREEZING High Altitude InstallationsGAS Line Purging Filling the Water HeaterVent Pipe Termination Planning the Vent SystemIf using 2 inch vent pipe If using 3 inch vent pipeCondensate Installation of Vent SystemVent Terminal INSTALLATION, Sidewall Masonry Side WallsVent terminals supplied with heater must be used Sequence of InstallationsInstallation Sequence Installation of Vent SYSTEM, Sidewall Installation of Vertical Vent SystemSelection of Materials Vent Pipe PreparationInitial Preparation Step B Recommended BRUSH* Size for Primer Cement ApplicationsStep a Step G Connection to Vent Pipe Step EStep F Power Vent Calibration Electrical ConnectionsFilling the Water Heater Operating Instructions Display PanelPage MCU For Your Safety Read Before Lighting Lighting InstructionsHeat Cycle Definitions State Description Temperature Regulation Unique Hybrid Features Temperature ProbesPage Temperature Regulation Operational Conditions Constant Output Temperature ControlStart UP Conditions Maintenance Motors Snow Accumulation Cleaning the Inlet Water FilterCleaning the Heat Engine Flushing the Heat Exchanger Lime BUILD- UPFault Indication and Error Codes Draining the TankCode Display Example Format Diagnostic DisplayRemarks Fault Lockout Code Description Cause Remedy Type Displayed Fault Lockout Code Description Cause Remedy Type Displayed Fault Lockout Code Description Cause Remedy Type Displayed Troubleshooting HOT Water Turns Cold When the TAP is OpenedThere is no HOT Water or Stays ColdService Leakage CheckpointsParts Identification Item # Description AB C DEF KIT # Replacement Parts DescriptionNIP/DIP/TBO/HT Conditions and Exceptions Service and Labor ResponsibilityClaim Procedure Limitation on Implied WarrantiesPage