American Water Heater 1010 319869-000 warranty Sequence of Installations, Installation Sequence

Page 26

SEQUENCE OF INSTALLATIONS

Cut a length of PVC pipe about 3.5 in. (9cm) longer than the wall thickness at the opening. Glue the vent terminal to this section of pipe. Slide the wall plate over the pipe to stop against the vent terminal. Place a bead of caulking (not supplied) around the gap between the pipe and cover plate. Apply enough to fill some of the gap between the pipe and wall. Place some of the caulking on the back of the plate to hold it against the wall after installation. If the vent pipe is installed up to the wall, with a coupling on the end against the wall opening, the pipe with the vent terminal can be prepared for gluing before inserting through the wall. Slide the pipe through the wall and insert into the coupling on the other side of the wall, making sure that the vent terminal ends up pointed in the correct position (see Figure 23).

FIGURE 23

INSTALLATION SEQUENCE

CAUTION

Vent terminals supplied with heater must be used.

NOTE: BEFORE BEGINNING INSTALLATION OF ANY VENT PIPE READ THE VENT PIPE MANUFACTURER’S INSTALLATION INSTRUCTIONS.

1.After the points of termination have been determined, use the cover plates as templates to mark the holes for the vent pipes to be inserted through the wall. BEWARE OF CONCEALED WIRING AND PIPING INSIDE OF WALL. If the vent terminals are being installed on the outside of a finished wall, it may be easier to mark both the inside and outside wall. Align the holes by drilling a hole through the center of the template from the inside through to the outside. The template can now be positioned on the outside wall using the drilled holes as a centering point for the template.

A.MASONRY SIDE WALLS Chisel an opening approximately 1/2 in. (1.3cm) larger than the marked circle.

B. WOODEN SIDE WALLS Drill a pilot hole approximately 1/4 in. (0.64cm) outside of the marked circle. This pilot hole is used as a starting point for a saws-all or sabre saw blade. Cut around the marked circle staying approximately 1/4 in (0.64cm) outside of the line. (This will allow the vent pipe to easily slide through the opening. The resulting gap will be covered by the vent terminal cover plates.) Repeat this step on the inside wall if necessary.

2.Cut a length of PVC pipe about 3.5 in. (9cm) longer than the wall thickness at the opening.

3.Glue the vent terminal to the section of the pipe.

4.Slide the wall plate over pipe to stop against intake vent terminal.

5.Place a bead of caulking (not supplied) around the gap between the pipe and the wall. Place some of the caulking on the back of the plate to hold it against the wall after installation.

6.If the vent pipe is installed up to the wall, with a coupling on the end against the wall opening, the pipe with the vent terminal can be prepared for gluing before inserting through the wall. Slide the pipe through the wall and insert into coupling on the other side of the wall, making sure that the vent terminal ends up pointed in the correct position (see Figure 24).

FIGURE 24

26

www.americanwaterheater.com

Image 26
Contents Power Vent GAS Models AN Odorant is Added to the GAS Used By this Water HeaterTable of Contents Safe INSTALLATION, USE and Service Important DefinitionsGeneral Safety Can be triggered at any time Preparing for the Installation IntroductionPage Operation Replacement Parts and Deliming ProductsGET to Know Your Water Heater GAS Models Installation Considerations Rough in DimensionsDirectly BELOW. Keep Clear of ALL Obstructions Water Potable Heating All models are considered Water Piping Mixing Valve UsageSuggested Piping Arrangement For TOP Connections Hotter Water can ScaldFacts to Consider about Location Handle Installation Earthquake Zones Page Appliances in Confined Spaces Combustion AIR and VentilationAppliances in Unconfined Spaces ALL AIR from Outdoors See Figures 12, 13 Closed Water Systems Chemical Vapor CorrosionWater Piping Thermal ExpansionTEMPERATURE-PRESSURE Relief Valve Hard WaterValve and Pipe Insulation if supplied GAS Piping FLOODING/FREEZING High Altitude InstallationsGAS Line Purging Filling the Water HeaterVent Pipe Termination Planning the Vent SystemIf using 2 inch vent pipe If using 3 inch vent pipeCondensate Installation of Vent SystemVent Terminal INSTALLATION, Sidewall Masonry Side WallsVent terminals supplied with heater must be used Sequence of InstallationsInstallation Sequence Installation of Vent SYSTEM, Sidewall Installation of Vertical Vent SystemSelection of Materials Vent Pipe PreparationInitial Preparation Step B Recommended BRUSH* Size for Primer Cement ApplicationsStep a Step G Connection to Vent Pipe Step EStep F Power Vent Calibration Electrical ConnectionsFilling the Water Heater Operating Instructions Display PanelPage MCU For Your Safety Read Before Lighting Lighting InstructionsHeat Cycle Definitions State Description Temperature Regulation Unique Hybrid Features Temperature ProbesPage Temperature Regulation Operational Conditions Constant Output Temperature ControlStart UP Conditions Maintenance Motors Snow Accumulation Cleaning the Inlet Water FilterCleaning the Heat Engine Flushing the Heat Exchanger Lime BUILD- UPFault Indication and Error Codes Draining the TankCode Display Example Format Diagnostic DisplayRemarks Fault Lockout Code Description Cause Remedy Type Displayed Fault Lockout Code Description Cause Remedy Type Displayed Fault Lockout Code Description Cause Remedy Type Displayed Troubleshooting HOT Water Turns Cold When the TAP is OpenedThere is no HOT Water or Stays ColdService Leakage CheckpointsParts Identification Item # Description AB C DEF KIT # Replacement Parts DescriptionNIP/DIP/TBO/HT Conditions and Exceptions Service and Labor ResponsibilityClaim Procedure Limitation on Implied WarrantiesPage