Upon receipt, inspect the container for evidence of damage in shipment. Do not discard any evidence of rough handling. Factory packing provides for maximum protection during shipment. However, the pump should be inspected immediately and any damage should be reported to the carrier without delay.

Before unpacking and installing the pump, the user should thoroughly familiarize himself with the contents of this instruction manual, particularly the physical and operating specifications listed in the following paragraphs, in order to gain a better understanding of the operating principles, limitations, correct application of the diffusion pump, the hazards involved, and what to do and what not to do in order to avoid these hazards.

1-2 OPERATING SPECIFICATIONS (See Figure 1-1)

Table 1-1 lists the specifications for all standard models of the HS-20 diffusion pump.

Table 1-1. HS-20 Diffusion Pump Specifications

Model

Technical Specifications

Optimum Operating Range

6 x 10-4Torr to < 1 x 10-9Torr

 

8 x 10-2Pa to < 1.3 x 10-7Pa

 

7.8 x 10-4mbar to <1.3 x 10-9Torr

Maximum Pumping Speed

17,500 liters/sec for air

(See Figure 1-1)

21,000 liters/sec for helium

Maximum Throughput

18 Torr-liters/sec

at 1 x 10-2Torr

2394 Pa-liters/sec

 

23.4 mbar-liters/sec

Maximum Forepressure

No Load: 0.65Torr; 86.5 Pa; 0.85 millibar

 

Full Load: 0.55Torr; 73.2 Pa; 0.72 mbar

Backstreaming Rate at Pump Inlet

0.0015 mg/cm2/min

Power Required (approximately)

12 KW, 240/380/480V, 50/60 Hz, 3-phase

Warmup Time

45 minutes

Cooldown Time(using quick cool)

85 minutes (45 minutes)

Fluid Charge

5 U.S. quarts (4.75 liters)

Cooling Water Requirements

1.5 gpm at 60°F to 80°F inlet temperatures

Pressure drop across cooling circuits

15 psi

of cold cap and body in series

 

Backing Pump Size Recommended

100 cfm for maximum throughput

1-1

Image 16
Contents HS-20 Diffusion Pump Sales and Service Offices Telephone Numbers Warranty Warranty Replacement and AdjustmentPage Page Iii Prohibited Action Explosion-Causing Condition Prohibited Action Result Page Vii Page Page Table of Contents Section Safety Considerations Section I InstallationList of Illustrations List of TablesOperating Specifications See Figure Installation GeneralModel Technical Specifications ASA Outline Drawing HS-20 Diffusion Pump, with ASA Flanges Cleaning a NEW Pump UnpackingInstallation Safety Considerations and Interlocks Utility and System ConnectionsVacuum Connections Cooling Water Connections See FigureCooling Water Connections Thermal Switches Initial Vacuum Test240/400/430/440/480 V Wiring Diagram HS-20 Diffusion Pump 415 V Wiring Diagram HS-20 Diffusion Pump Adding Pump Fluid Sight Glass Assembly START-UP Procedure OperationShutdown Procedure OperationMaintenance General Periodic InspectionMaintenance CleaningDisassembling and Reassembling the Cold CAP Refer to Figure Do not overtighten the screwExternal Fittings Cold Cap Assembly Disassembling the Jet Assembly Refer to Figure JET AssemblyDisassembling the Lower Jet Assembly Inch Jet Assembly Reassembling the Jet Assembly Maintenance Reassembling the Lower Jet AssemblyHeater Replacement Jet Coupling Tighten clamping nuts to 250 in.-lbs Maintenance Replaceable Parts Maintenance Outgassing Troubleshooting LeakagePoor Pump or System Performance Troubleshooting