KitchenAid 8574116 Install custom panel, Option 1 For models KUDP02FSPA, KUDS02FSPA, KUDU02FSPA

Page 13

Install custom panel

Option 1: For models KUDP02FSPA, KUDS02FSPA, KUDU02FSPA

NOTE: The handle for the custom panel is not included.

IMPORTANT: If the handle is attached from the back of the custom panel, the screw holes should be countersunk for the screws heads to be flush with the panel. If the handle is attached to the front of the custom panel, the screw lengths cannot exceed the panel thickness. For more information on KitchenAid custom handle selection, refer to the KitchenAid Catalog, visit www.kitchenaid.com, or call 1-800-422-1230.

NOTE: A customer-supplied full front panel must weigh no more than 16 pounds (7.3 kg) and must be made to specific dimensions. It is recommended that a cabinetmaker cut the custom panel because of the precise dimensions needed.

NOTE: All mounting hardware supplied is for a 3/4"

(19.1 mm) thick wood panel. If a thinner wood panel, or materials other than wood are used, it is the consumer’s responsibility to obtain the proper length screws and adjust the pilot holes accordingly.

IMPORTANT: Use a moisture resistant sealer on both sides and all edges of the panel to protect it from humidity.

23-1/2" (59.7 cm)

 

*30-3/16" (76.7 cm)

custom panel dimensions

3/4" (19.1 mm)

*This dimension is for 4" (10.2 cm) toe kick. If the installation needs a higher toe kick, adjust the height of the wood panel accordingly. Not recommended for toe kicks greater than 6" (15.2 cm).

1.With a TORX® screwdriver, remove three screws from both sides, as shown; hold the outer panel up while removing the screws. Save screws for reinstallation.

3 screws

3 screws

outer panel

2.Gently set outer panel aside.

3.Lay the cutomer-supplied custom panel face down on a protective, non-scratching surface.

4.Measure 9-29/32" (25.2 cm) from top edge and mark a line on the back of customer-supplied custom panel.

back

9-29/32"

 

(25.2 cm)

mark line

top edge

 

5.Position the outer panel on the back of the customer- supplied custom panel as shown, so that the top holes in the outer panel are on the line, and both panels are centered side to side.

6.Mark all four hole locations; remove outer panel. Drill 3/32" pilot holes 1/2" (13 mm) deep in customer-supplied custom panel.

mark pilot holes

7.Place the outer panel on the back of the customer- supplied custom panel; align holes.

8. Attach outer panel to back of customer- supplied custom panel with the four

#10-16 x 3/8" hex head screws supplied in

hex head

screw

the literature package.

 

9.Attach the handle. The handle should be centered on the front of the customer-supplied custom panel in the area shown.

IMPORTANT: Screw heads must be flush with back of customer-supplied custom panel.

6" (15.2 cm)

10.Attach the panel assembly to the door by reinstalling the three screws on each side; do not tighten completely. This will hold the panel assembly in place on the door frame.

3 screws

3 screws

customer-supplied

custom panel

13

Image 13
Contents Installation Instructions Undercounter Dishwasher Table of Contents Dishwasher SafetyYou need to All installations Installation RequirementsAddition, for new installations Tools and PartsCutout dimensions Product dimensionsIf connecting dishwasher with a power supply cord If direct wiring dishwasherDrain Requirements Water Supply RequirementsPrepare cabinet opening using existing utility hookups Installation InstructionsInstall the drain hose Option 1 Waste disposer with air gapElectrical connection Option1 Direct wire methodOption 2 No waste disposer with air gap Option 4 No waste disposer no air gapOption 2 Power supply cord method Install the water lineInstall moisture barrier on some models If you have built-up floors Prepare dishwasherInstall the door handle-Pro Line series Install the door handle on some modelsInstall door panel-Pro Line series For dishwashers with the control panel shown below Custom panel dimensionsOption 1 For models KUDP02FSPA, KUDS02FSPA, KUDU02FSPA Install custom panelOption 2 For models KUDI02FR, KUDP02FR, KUDS02FR, KUDU02FR Option 3 For models KUDC02IR, KUDI02IR, KUDP02IR KUDS02IR Option 2 Dishwasher side attachment Choose attachment optionOption 1 Countertop attachment Move dishwasher into cabinet opening Check door spring tensionLevel the dishwasher Make Electrical Connection Option 1 Direct wire methodHelpful Tip Connect to drain Connect to water supplyComplete installation Bottom sound pad installation on some modelsSecure dishwasher in cabinet opening If dishwasher does not operate Check operationTable des matières Sécurité du lave-vaisselleTenir compte de ceci Emplacement d’installation Exigences d’installationPour toutes les configurations d’installation Outillage et piècesDimensions de l’espace d’installation Dimensions du produitSpécifications de l’alimentation en eau Spécifications de la canalisation d’évacuationSpécifications électriques Pour le raccordement direct du lave-vaisselleInstallation du tuyau d’évacuation Instructions d’installationOption 1 broyeur à déchets avec brise-siphon Option 2 pas de broyeur à déchets avec brise-siphon Raccordement électriqueOption 4 pas de broyeur à déchets sans brise-siphon Option 3 broyeur à déchets sans brise-siphonOption 2 raccordement par cordon d’alimentation Installation de la canalisation d’eauImportant Utiliser toujours un tuyau d’évacuation neuf Installation de la barrière contre lhumidité Préparation du lave-vaisselle Installation de la poignée de porte Série Pro Line Plancher rehaussé Installation de la poignée de porteDimensions du panneau personnalisé Installation du panneau de la porte- série Pro LineModèles KUDI02FR, KUDP02FR, KUDS02FR, KUDU02FR Option 1 Pour les modèles KUDP02FSPA, KUDS02FSPA, KUDU02FSPA Installation du panneau personnaliséLes angles supérieurs du Placer délicatement le panneau externe à part Vis Contrôle de la tension des ressorts de la porte Choix de la méthode d’immobilisation de l’appareilOption 1 Fixation sur le plan de travail Établissement de l’aplomb du lave-vaisselle Insertion du lave-vaisselle dans l’espace d’installationOption 1 Câblage direct Conseil utileRaccordement à la canalisation d’eau Raccordement à la canalisation d’évacuation Dernières opérations de l’installation Installation du panneau d’insonorisationAlimentation de l’appareil par câblage direct Si le lave-vaisselle ne fonctionne pas correctement Contrôle du fonctionnementImprimé aux É.-U