Frymaster SCFHD operation manual Final Preparation

Page 27

HIGH EFFICIENCY DECATHLON (HD) SERIES GAS FRYERS

CHAPTER 4: FRYER OPERATIONS

4.3Final Preparation (cont.)

D.Operating Thermostat: Turn the burners "ON" for about 10 seconds, "OFF" for a minute, etc., until the shortening is melted. If you see smoke coming from the shortening while melting this way, shorten the "ON" cycle and lengthen the "OFF" cycle. Smoke indicates potential scorching of the shortening, which will shorten its useful life.

E.Compu-Fry Computer: Press the computer on/off switch to "ON". The burners will initially operate in the MELT CYCLE mode until the shortening reaches 180°F. It will then automatically switch to normal operation.

F.When the frypot is filled and the shortening is melted, carefully replace the crumb screen over the heat tubes. Wear oil-proof insulated gloves to avoid the potential for burn injury when placing crumb screen in frypot.

G.Before starting operation, set the electronic thermostat/operating thermostat or program the computer to the probable working temperature and wait for the temperature to stabilize.

For additional computer operational procedures, see computer manual that shipped with fryer.

4-6

Image 27
Contents HD Models Series Gas Fryers Hour Service HotlineCanada Page High Efficiency Decathlon HD Series Gas Fryers Table of ContentsTable of Contents Applicability and Validity After PurchaseOrdering Parts Service Information Safety InformationComputer Information Qualified and/or Authorized Operating Personnel Service PersonnelGeneral Receiving and Unpacking EquipmentPrinciples of Operation Product DescriptionRating Plate Pre-installationAir Supply and Ventilation Installation StandardsEquipment Installed at High Altitudes Leveling the Fryer Fryers equipped with legs only Installing the FryerRear Only Front Only Installing Casters and LegsNational Code Requirements Gas ConnectionsGas Supply Type and Pressure Gas Connections NON-CE Altitudes of 2000 feet or less Gas SpecificationsCE only Altitudes of 2000 feet or less Gas Conversion ProceduresElectrical Connections Initial Start-up Pilot Lighting Procedures, Standing Pilot Only Boil-Out Procedure Boil-Out Procedure Final Preparation Final Preparation Operating Instructions Electronic Thermostat Controller Electronic Thermostat Controller/Computer When in useElectronic Thermostat Controller/Computer High Efficiency Decathlon HD Series GAS Fryers Filtration Filter Unit Types Filter PreparationFilter Leaf Assembling the Filter Crumb screen properly placed Handle Applying filter powder to filter-leaf Installing the Filter Filtering Tools Pan Preparation and Operation Operating the FilterMove the red drain valve handle into the open position Filter Operation SUFF/UFF Filtration Systems Installation and Operation Do not Allow Crumbs to Accumulate in Tray Optional Filter Hose and Wand Operation Hose and Wand Operation Complete FilteringWeekly DailySee filtration manual for filtration maintenance procedures Periodic/ AnnualStainless Steel Care Pilot Burner Malfunction Main Burner Malfunctions Electronic Thermostat Controller Calibration Service Hotline