Frymaster SCFHD operation manual High Efficiency Decathlon HD Series Gas Fryers, Table of Contents

Page 4

High Efficiency Decathlon (HD) Series Gas Fryers

Installation & Operation Manual

TABLE OF CONTENTS

 

 

Page #

1.

INTRODUCTION

1-1

1.1

Applicability and Validity

1-1

1.2

After Purchase

1-1

1.3

Ordering Parts

1-1

1.4

Service Information

1-2

1.5

Computer Information

1-2

1.6

Safety Information

1-3

1.7

Service Personnel

1-3

2.

IMPORTANT INFORMATION

2-1

2.1

Receiving and Unpacking Equipment

2-1

2.2

General

2-1

2.3

Product Description

2-2

2.4

Principles of Operation

2-2

2.5

Rating Plate

2-3

2.6

Pre-Installation

2-3

2.7

Air Supply and Ventilation

2-4

2.8

Equipment Installed at High Altitudes

2-5

3.

INSTALLATION

3-1

3.1

Installing the Fryer

3-1

3.2

Leveling the Fryer (Fryers equipped with legs only)

3-1

3.3

Installing Casters and Legs

3-2

3.4

Gas Connections

3-3

3.5

Gas Specifications

3-6

3.6

Gas Adjustment

3-7

3.7

Gas Conversion Procedures

3-7

3.8

Electrical Connections

3-9

Image 4
Contents Hour Service Hotline HD Models Series Gas FryersCanada Page Table of Contents High Efficiency Decathlon HD Series Gas FryersTable of Contents After Purchase Applicability and ValidityOrdering Parts Safety Information Service InformationComputer Information Service Personnel Qualified and/or Authorized Operating PersonnelReceiving and Unpacking Equipment GeneralProduct Description Principles of OperationPre-installation Rating PlateInstallation Standards Air Supply and VentilationEquipment Installed at High Altitudes Installing the Fryer Leveling the Fryer Fryers equipped with legs onlyInstalling Casters and Legs Rear Only Front OnlyGas Connections National Code RequirementsGas Supply Type and Pressure Gas Connections Gas Specifications NON-CE Altitudes of 2000 feet or lessGas Conversion Procedures CE only Altitudes of 2000 feet or lessElectrical Connections Initial Start-up Pilot Lighting Procedures, Standing Pilot Only Boil-Out Procedure Boil-Out Procedure Final Preparation Final Preparation Operating Instructions Electronic Thermostat Controller When in use Electronic Thermostat Controller/ComputerElectronic Thermostat Controller/Computer High Efficiency Decathlon HD Series GAS Fryers Filtration Filter Preparation Filter Unit TypesFilter Leaf Assembling the Filter Crumb screen properly placed Handle Applying filter powder to filter-leaf Installing the Filter Filtering Tools Operating the Filter Pan Preparation and OperationMove the red drain valve handle into the open position Filter Operation SUFF/UFF Filtration Systems Installation and Operation Do not Allow Crumbs to Accumulate in Tray Optional Filter Hose and Wand Operation Complete Filtering Hose and Wand OperationDaily WeeklyPeriodic/ Annual See filtration manual for filtration maintenance proceduresStainless Steel Care Pilot Burner Malfunction Main Burner Malfunctions Electronic Thermostat Controller Calibration Service Hotline