Frymaster SCFHD operation manual Pilot Lighting Procedures, Standing Pilot Only

Page 23

HIGH EFFICIENCY DECATHLON (HD) SERIES GAS FRYERS

CHAPTER 4: FRYER OPERATIONS

4.1.1 Pilot Lighting Procedures, Standing Pilot Only

Initial Pilot Lighting: All Dean fryers are tested, adjusted and calibrated to sea level conditions before leaving the factory. Adjustments to assure proper operation of pilot may be necessary on installation to meet local conditions, low gas pressure, differences in altitude and variations in gas characteristics. These adjustments correct possible problems caused by rough handling or vibration during shipment, and are to be performed only by qualified service personnel. These adjustments are the responsibility of the customer and/or the dealer and are not covered by the Dean Industries warranty.

The inlet pipe at the lower rear of the fryer brings incoming gas to the pilot safety control valve, then to the pilot and main burners. The pilot is located high in the cabinet center, at the base of the frypot.

Light the pilot as follows:

1.Turn off the manual shut-off valve on the incoming service line.

2.Turn the operating thermostat or the computer off.

3.Depress the pilot gas cock dial on the combination control valve and turn to "OFF".

4.Wait approximately 5 minutes for accumulated gas to disperse.

Note: Inspect high-limit frypot with water or oil. properly attached.

thermostat/temperature probe location prior to filling Ensure that connecting hardware is intact and bulbs are

5.Fill the frypot with oil or water to the bottom OIL LEVEL line scribed on the frypot back. Ensure that heating tubes are covered in liquid prior to engaging burners.

6.Open the manual shut-off valve on the incoming service line.

7.Apply lighted match or taper to the pilot burner head.

8.Turn the gas cock dial on the control valve to "Pilot", then depress and hold the dial until the pilot stays lit for approximately 1 minute after the flame appears on the pilot. Release the knob. The pilot should remain lit.

Piezo Ignitor: Turn the gas cock dial on the control valve to "Pilot", and then repeatedly press the piezo ignitor button while depressing the gas valve knob until the pilot lights. Continue to hold the knob in for 1 minute. Release the knob. The pilot should remain lit.

Piezo ignitor button

9.If the pilot fails to stay lit, depress the dial and re-light the pilot, depressing the dial longer before releasing.

10.When the pilot stays lit, turn the gas cock dial to "ON".

11.Turn the operating thermostat, computer or controller on, and then ensure the main burners ignite from the pilot.

4-2

Image 23
Contents HD Models Series Gas Fryers Hour Service HotlineCanada Page High Efficiency Decathlon HD Series Gas Fryers Table of ContentsTable of Contents Ordering Parts Applicability and ValidityAfter Purchase Computer Information Service InformationSafety Information Qualified and/or Authorized Operating Personnel Service PersonnelGeneral Receiving and Unpacking EquipmentPrinciples of Operation Product DescriptionRating Plate Pre-installationAir Supply and Ventilation Installation StandardsEquipment Installed at High Altitudes Leveling the Fryer Fryers equipped with legs only Installing the FryerRear Only Front Only Installing Casters and LegsNational Code Requirements Gas ConnectionsGas Supply Type and Pressure Gas Connections NON-CE Altitudes of 2000 feet or less Gas SpecificationsCE only Altitudes of 2000 feet or less Gas Conversion ProceduresElectrical Connections Initial Start-up Pilot Lighting Procedures, Standing Pilot Only Boil-Out Procedure Boil-Out Procedure Final Preparation Final Preparation Operating Instructions Electronic Thermostat Controller Electronic Thermostat Controller/Computer When in useElectronic Thermostat Controller/Computer High Efficiency Decathlon HD Series GAS Fryers Filtration Filter Unit Types Filter PreparationFilter Leaf Assembling the Filter Crumb screen properly placed Handle Applying filter powder to filter-leaf Installing the Filter Filtering Tools Pan Preparation and Operation Operating the FilterMove the red drain valve handle into the open position Filter Operation SUFF/UFF Filtration Systems Installation and Operation Do not Allow Crumbs to Accumulate in Tray Optional Filter Hose and Wand Operation Hose and Wand Operation Complete FilteringWeekly DailyStainless Steel Care See filtration manual for filtration maintenance proceduresPeriodic/ Annual Pilot Burner Malfunction Main Burner Malfunctions Electronic Thermostat Controller Calibration Service Hotline